See your price
Application

Inspecting a roof? Choose the right scaffold.

Inspecting a roof is looking, not working. You want to see with your own eyes how the gutter lies, whether tiles have shifted, how the lead around the chimney hangs and whether the edges still look sound. For that you have to get up to the roof edge, and on two storeys that means a working height of 8 to 12 metres. A wide mobile scaffold gives you a calm place to look, to photograph and to make notes. One or two days is often enough, since nothing has to dry or cure.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For inspecting a roof we recommend the Wide mobile scaffold.
  • For a roof inspection you take a wide tower that reaches the roof edge, so 8 to 12 metres of working height.
  • A short hire is enough: one or two days of looking and photographing, with no drying time and no material to carry up.
  • From the scaffold you judge the gutter and the bottom rows of tiles, not the whole roof surface up to the ridge.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for inspecting a roof?

Safe, stable and professional work at height

On an inspection the scaffold is not a workplace but an observation post, and that changes what matters when you hire. You need no load capacity and no long period of days, but you do need enough height to see over the gutter and enough stability to stand there with a camera in both hands. From a ladder that does not work: one hand is free, you cannot move sideways and you do not dare to look calmly. Renting a tower for a roof inspection buys you a fixed deck you can stand on for half an hour without your attention going to your feet.

  • Looking and photographing calmly from one fixed spot
  • Enough height to see over the gutter
  • Short rental period of one or two days
  • Both hands free for camera and notes
Read more about working safely →

Hiring a mobile scaffold for a roof inspection: which model

For an inspection the wide Altrex version stands most pleasantly, at 135 cm between the uprights with a platform length of 245 cm. Not because you take much weight up, but because you are busy with both hands while you hang over the edge and look. On a roomy deck you can lay down your camera, a torch and your notebook and still take a step sideways to look from another angle. That last thing makes a genuine difference when you are judging.

If the only way past the house is a path a metre wide, you hire the slim RS51 at 75 cm. You stand more tightly then, but for looking that is workable: you simply put less down and keep your things in a shoulder bag. What you do weigh up is that you climb up and down with that bag more often. In the mobile scaffold hire range both widths stand beside each other with their reach.

Hired tower assembled in a path barely a metre wide, exactly where the slim 75 cm model earns its place

What is not needed here is a heavy, tall structure you have to anchor with steel cables. You use the scaffold for a day, you look, you photograph and you come back down. So choose on reach and on the passage to the spot where you want to stand, and not on load capacity. The dimensions of both models are given in the overview of sizes, including the width the stabilisers take up on either side.

Which working height to hire to see over the gutter

The point you need to reach is the gutter and the edge above it, because almost every roof problem begins there. You want your eyes above that edge, otherwise you look at the underside of the tiles and see nothing of the surface behind them. On a house of two storeys the gutter sits somewhere between 6 and 8 metres, which puts you in the 8 to 12 metre class of working height. What you enter is your platform height with a good 2 metres of reach on top.

The measuring point lies below, on the ground where the castors will stand. That sounds obvious, but with a sloping driveway or a sunken back garden it easily accounts for half a metre. Measure as well whether a dormer or a projecting bay is in the way, because you cannot see through those and will have to go round them. What a reach of 12 metres means in practice is worked out on that page, including the number of platforms you build for it.

Mobile scaffold standing along a wall right up by the gutter, the height a roof inspection needs

Choosing too low costs you the whole inspection. Stand a metre short and you miss exactly the zone you came for, and you are a day further with no answer. On looking work you notice that only once you are up there, and by then the build is done. So rather take one level extra. If the gutter hangs at the level of the second living floor, pick the roomier variant of the reach when you hire.

Where to put the hired scaffold on an inspection round

On an inspection you do not choose one spot but a handful of viewing positions. Usually you want to be at the chimney, at a dormer, on the corner where the gutter drains and at the point where you saw a damp patch inside. Walk those points from below first and work out what ground lies underneath. Then you know in advance whether you can wheel the scaffold along or whether a step or a border edge sits somewhere in between.

Under the set up you have to fit the stabilisers, and they ask more room on each side than the frame itself. On a terrace that is no issue, in a narrow alley it is. Watch the ground as well: loose gravel and fresh soil give way under the castors, and on a lawn that has just got wet the whole thing sinks. For crooked or loose surfaces the approach is described in the guidance on uneven terrain.

Loose scaffold parts waiting on the pavement before assembly, at a viewing position picked out for the inspection

Think too about what you want to view from above. Stand tight against the wall and you look steeply upwards and hardly see the roof surface; half a metre of distance often gives you a better picture. On the street side you keep a walking route free and check with the council what is permitted on the pavement. For a single viewing position on the footway that is quickly arranged, but you do have to have done it beforehand.

One or two days of scaffold hire for your inspection

A roof inspection is one of the few jobs where you hire a mobile scaffold for a genuinely short spell. Nothing has to dry, nothing has to cure and there is no material you apply in stages. Reckon on half a day for the build, half a day for looking and photographing per side, and on a small house you are round with one day. On a house where you want to look at three or four sides, a second day comes quickly.

You need that second day more often than expected, and not because of the looking itself. Repositioning takes time: brakes off, stabilisers in, wheel it, level it, lock everything again. Do that four times and the day is gone. If rain or wind comes over you stand still, because in the wet you do not see on a roof what you are looking for and your camera is not going up anyway. So count on half a spare day.

Frames by a front door on a quiet street, the hire set for an inspection that lasts one or two days

On a short hire the way the price is built up is pleasant. The first day you pay in full, and a second day joins it with 95 per cent off, so that extra margin costs almost nothing. Anyone who books tight and does not finish has to have it delivered again later and pays that whole first 24 hours a second time. That trade off is worked out further in the article about a day or a week.

Which mobile scaffold suits inspecting a roof?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

What a roof inspection actually shows from the platform

Be honest about this, otherwise you draw conclusions you cannot support. From the deck of the scaffold you look well into the gutter, along the gutter brackets and at the bottom two or three rows of tiles, and you judge the fascia board and the overhang from close by. With a zoom lens you pull in a further stretch of roof surface. What you do not see is the ridge, the valley gutter in the middle and the back of a chimney.

What you also do not do is step off the scaffold onto the roof for a better look. A mobile scaffold is a workplace with a deck and guard rails; a tiled roof is not. Anyone who has to go onto the roof surface does so with the provisions meant for it and not on an impulse from the guard rail. For an ordinary check of gutter, edges and brackets you do not need the roof at all, and that is what makes a short hire so attractive.

Mobile scaffold reaching the gutter beside a house, the viewing position an inspection is photographed from

So work systematically per position. Your 245 cm platform covers a good two metres of roof edge, so photograph the same series from every position: gutter from the inside, the joint with the wall, the first rows of tiles, and an overview. Number your photographs per position and at home you still know which corner belonged where. For a flat roof with bitumen sheets, look at inspecting the roof covering, and for blockages start with inspecting the gutter.

Short hire with delivery: the scaffold on your inspection day

You get a complete, counted set of parts delivered on the spot you point out yourself. On a short job that matters even more: you want the stack right beside the first viewing position, so you are not hauling half a garden across before you can begin. Book before 15:00 on a working day and the parts are lying there the next working day. For an inspection you want to arrange quickly, that is often exactly enough.

The arrival day and the collection day you pin down yourself. For an inspection you would rather pick a dry, clear day, because in the rain you hardly see what is really going on and your lenses fog up. So have it delivered the day before and plan the inspection for the morning, when the light comes from the side and shadows show up cracks and sagging. The rate for bringing and fetching is fixed per province on the page with delivery charges.

Van delivering scaffold parts at a house, scheduled for the day before you carry out the roof inspection

Afterwards we come and take the set away again; dismantling and stacking the parts neatly is yours. Because no material is involved in inspecting, that is clean and quick work and the scaffold is often down within the hour. If your findings make you want to schedule a repair after all, keep the tower standing instead of having it collected first, since the rental price of an extra day weighs far less than a second delivery.

Looking and photographing safely on a hired mobile scaffold

Load class 3 within EN 1004 allows 200 kg per square metre on the deck, and on inspection work you use a fraction of it. That is exactly where it goes wrong: because it feels light, people climb up with a camera round their neck and a ladder under their arm, or bring somebody along who has no business there. The rules do not change because you have only come to look. More on that class stands in the explanation of this standard.

Lock the castors before you go up and leave them locked as long as anybody is on the scaffold. Never move the set up while things or a person are still above, even if it is only one position further. In wind above a stiff breeze you postpone: you are standing still and peering, and that is precisely when you do not see a gust coming. Photographing can just as well happen an hour later, and calm air gives sharper pictures too.

Folded out stabilisers under a mobile scaffold, which you also set fully for a short roof inspection

The particular risk of inspecting is distraction. You look upwards, you lean out to see behind the gutter and you stop watching your feet. Keep contact with the guard rail at all times, use a phone or a camera fitted with a wrist strap, and put your torch down on the deck rather than holding it in your mouth. Which further agreements apply for as long as you hire the scaffold is described in the safety rules at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for inspecting a roof

1

Take an overview photograph per viewing position first and the details afterwards. At home you then still know which crack belonged to which corner of the roof, without having to go up again.

2

Bring a small mirror on a handle. With it you look behind the gutter brackets and under the first row of tiles, without having to hang over the guard rail to see anything.

3

Plan your inspection for the early morning or the late afternoon. Slanting sunlight brings out unevenness, sagging and loose tiles on a roof far more clearly than the flat light around midday.

4

Go and look shortly after a heavy shower, but wait until the roof is dry again. Traces of damp on the fascia board and in the gutter stay visible while you stand on a dry deck.

5

Write a short note on your phone per viewing position before you climb down. Once you are on the ground the details fade fast, and it is those that decide whether you need a roofer later.

6

If you doubt whether one day is enough, book two straight away. Having the parts delivered again for a forgotten elevation costs you far more than that second day on your reservation.

Frequently asked questions

Frequently asked questions about inspecting a roof

Which mobile scaffold should you hire for inspecting a roof?+

The wide version stands most pleasantly, because you are working with a camera in your hands and want to shift your feet a little to judge the same spot from a second angle. Heavy load capacity you do not need, room to move you do. If that width will not fit past your house, the slim 75 cm tower does perfectly well for looking work. When you hire, choose above all on the reach that brings you up to the roof edge.

From booking to collection: how does hiring for a roof inspection work?+

You fix the model and the height you want online, choose your delivery day and your collection day, and see the price including VAT straight away before confirming. We deliver the parts, you build the scaffold, do your round along the roof edge and take it apart again afterwards. We collect everything on the agreed day. The rest of the procedure around the hire is set out in the most common questions.

Is one day of hire enough for a complete roof inspection?+

For a small house with one or two viewing positions, usually yes. If you want to go along all sides of the building, moving the tower takes so much time that a second day is more realistic. Reckon on a good half hour per reposition, levelling and setting the stabilisers out again included. If in doubt, add that second day to the booking; handing back early is always allowed and costs nothing extra.

What is the rental price for a short inspection and how does day two count?+

What an inspection day costs is set by the model and the height you choose; the bringing and fetching to your province counts on top of that. You see every amount including VAT on the page with the tariffs, before you commit to anything at all. On a short hire the weight lies entirely on the first day; what you put behind it hardly counts. One booking of two days therefore beats two separate single days.

Delivery or collecting it yourself when you hire for one inspection day?+

Either arrangement works on a single day. Delivery is easiest: the mobile scaffold is put down on your inspection day and taken away once you are finished, at a fixed amount per province. With a trailer the set can be collected by appointment at Zeeburgerpad in Amsterdam without charge. On a job of one day driving yourself saves you a little, but it does cost you two trips on exactly that busy day.

Which working height do you hire to reach the roof edge of your house?+

Put your tape down where the castors will stand, measure to the top edge of the gutter and add the height you need in order to look over it. On two storeys you then hire 8 to 12 metres of reach. If a dormer sits in the way, hold a bit more when you hire the scaffold. Which build belongs to that figure is shown on the page with working heights.

Do you build the scaffold if I hire it for an inspection?+

No, building stays your task. We bring the parts and take them away again later, but assembling and dismantling the tower remains with you, with the manual supplied and the video within reach. For an inspection that means counting on half a day of building before you get to the actual looking, and planning your rental days accordingly. The step by step guide to building runs through the order with you.

Can you hire for longer if the inspection turns up more than expected?+

Certainly. If you find damage and want a roofer to come at once, let us know you are keeping the mobile scaffold longer; we shift the collection day as long as it is not already promised. That is nearly always cheaper than dismantling and having it delivered again in a fortnight. Do ask the same day, then you know for sure you can keep it and need not cancel the roofer.

How much room do you need at the viewing positions around your house?+

You need the frame width plus the space the stabilisers take on either side, and a level surface under all four castors of the scaffold. For an inspection you also like to set the tower half a metre off the wall, because otherwise you are looking too steeply upwards at the tiles. Clear garden furniture, bicycles and planters away beforehand, then you can move to the next viewing position without hold ups.

Can you keep the scaffold on hire if it rains on your inspection day?+

Postponing is wise. On a wet roof you cannot see damp patches, the tiles glare and your camera lens fogs, so your judgement becomes unreliable. The mobile scaffold may simply stay standing until it clears. Because an extra day of hire hardly counts, you are better off shifting a day than doing an inspection you will get nothing out of later. In any case do not climb while the platform is slippery with rain.

What happens to the deposit over such a short hire period?+

You settle a deposit at the reservation. As soon as all the parts have been counted after return, that sum is credited back to you one working day later. On an inspection this is usually trouble free, because no paint, sealant or coating is involved and the scaffold parts stay clean. Just watch the small items such as castors, braces and toe boards. This article about the deposit says what is checked.

May you step onto the roof surface from the hired scaffold for a better view?+

Do not do that. The mobile scaffold brings you to the roof edge and there it stops; the roof surface itself you enter with the provisions meant for it. For a check of gutter, fascia board and the bottom rows of tiles that is not needed either. If you do want the whole surface judged, call in somebody equipped for it; the explanation about pitched roofs helps you weigh that up.

Hire a mobile scaffold for inspecting a roof today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.