See your price
Application

Impregnating a facade? Choose the right scaffold.

Impregnating is working with a fluid as thin as water. Unlike a coating, nothing stays on the stone as a layer: the product draws in and has to sink equally deep everywhere, or you see the difference in the facade later. You apply from the bottom up, band above band, without an edge drying anywhere. You carry little weight but cover a great many metres. Hence the RS52 of 135 cm wide, in a build that reaches 5.2 to 9.2 metres working height.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For impregnating a facade we recommend the Wide mobile scaffold.
  • For impregnating a facade you hire the wide RS52, 135 cm between the uprights, built to 5.2 or 9.2 metres.
  • You start at the bottom and work upwards, so the first positions are low and you build higher only later.
  • Two to four rental days is normal: the product goes on fast, but every band must join wet on wet.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job5.2 to 9.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for impregnating a facade?

Safe, stable and professional work at height

With impregnating the problem is not the weight but the area. A jerrycan and a low pressure sprayer amount to little, while in a day you saturate eighty or a hundred square metres of facade. That only works if your bands join before the previous one has drawn away, so from each position you want to take a good stretch of wall without stretching. Because the product runs downwards you also work from the plinth upwards, which means your setup grows with the job and you stand lower on the first day than on the last. Hiring a scaffold for impregnating a facade is therefore about reach and pace, not carrying capacity.

  • Thin product that draws straight into the brickwork
  • Working from the plinth upwards, band after band
  • Wide deck to reach far sideways
  • Working height between 5.2 and 9.2 metres
Read more about working safely →

Why you hire a wide mobile scaffold for facade impregnation

You hire the wide version here: an Altrex RS TOWER 52 with 135 cm between the uprights, and that has nothing to do with weight. Up top you need no more than a jerrycan and a spray lance. What the wide version gives you is freedom of movement: you can take a step left and right on the deck and still run the full band with your arm outstretched. On a narrow tower you turn round your own kit the whole time. The mobile scaffolds available to hire show both widths side by side.

On a wide deck two of you can also stand without getting in each other's way, and on this work that is a large advantage. One keeps the band wet, the other follows straight behind with a block brush along the joints, the edges and the places where the stone draws extra hard. That division keeps the pace up, and pace is exactly what impregnating turns on. On a deck of 75 cm it does not work: you stand waiting for the other to step aside.

Frames resting on the wall by a cargo bike, delivered kit for the 135 cm wide model you hire for impregnating

The platform length of 245 cm matters more for your layout than the height of the build. That length is your band width: per position you treat a strip of facade about two and a half metres wide over the full height you can manage at that moment. A house seven metres across therefore falls into three strips, and that number decides how often a day you move. Which other sizes belong to the models is listed in the overview of mobile scaffold measurements.

Working from the plinth up: which working height to hire

Unlike painting work you begin at the bottom here. The product runs downwards, and whatever sinks along the facade has to land on a stretch already treated; on dry brickwork it leaves a tidemark. So you build low, do the bottom bands, and only then go higher. For an ordinary house a reach of 5.2 to 9.2 metres serves well: at the bottom your deck stands just above the plinth, at the top you reach the gutter.

Working height says something other than platform height. It is the height to which you can still work: the platform you stand on, plus the not quite two metres you add with an arm and a lance. Hire up to 9.2 metres and your top deck lies at about seven metres, and you take the edge under the gutter without stretching. Which build belongs with that, and which intermediate steps you use on the way up, is set out where a nine metre reach is explained.

Side elevation with a mobile scaffold standing to gutter height, the reach a complete facade treatment asks for

Choosing tight shows up extra clearly with impregnating. If the top half metre stays untreated, the water simply sinks in there at the first shower and later you see a dark band standing above your work. That is therefore no cosmetic detail but the point of the whole treatment. Happily the RS52 reaches a working height of 14.2 metres, so a tall side elevation or a gable comes along in the same rental period; you just build the setup in more lifts.

Where the hired scaffold stands while you saturate the facade

Under your working band all sorts of things come down, because you apply until the brickwork is saturated and the rest runs out of it. The ground under the setup therefore gets wet, and that decides where you put it. On block paving or slabs that is no issue; on a border, a timber deck or a newly laid terrace it is. Cover the plinth, the ground floor frames and the planting before you start, and keep the foot of the scaffold out of the puddles that form under the band.

For the stabilisers the usual holds: they stand outwards at an angle and want more room on every side than the setup is wide. Along a front elevation that is often the pavement, and then you have to check whether you may take up part of the footway. Bikes, bins, a low hedge and the meter box vents together decide whether you get past everywhere with the full width or have to skip a position and take that strip from a neighbouring one.

Stabilisers of a mobile scaffold on paving, which during wet facade work you keep clear of the puddles

Walk the facade once before delivery and count your positions. On a house seven metres wide there are three, and those three you walk again at every height level. If the garden lies lower than the pavement or the paving falls away, level the wheels afresh at every spot rather than leaving it at the first time. How to take up such a sloping surface is covered in the piece on a mobile scaffold on uneven ground.

How many rental days impregnating a facade takes

Applying it goes quickly. A practised hand saturates a fair piece of wall in an hour, and the product only has to draw in afterwards; you do not have to wait for that. What costs time is the round about it: the facade must first be clean and dry, so cleaning and a few days of drying out belong to the job. For treating a terraced house count on two to four days that you hire the mobile scaffold, depending on how many elevations go with the round.

The forecast settles more here than your planning does. A damp wall does not take the product, bright sun draws it away too fast and rain within a day of application washes part of your work off. In doubt you skip a day and simply leave the mobile scaffold standing. Because you also go over the same metres twice where the brickwork draws strongly, a day of slack in your rental period is not a luxury but sensible planning.

Frames, tubes and orange braces on a paved drive, the delivered set that stays with you two to four days

Financially that is not bad. After the first twenty four hours every following rental day runs with 95 per cent off, so building in a spare day costs you almost nothing beside that first day. Put the collection date one day behind your last working day, so that in doubt you can go up once more to check a spot where the product drew away too fast. The rates per build height stand with VAT on the page listing the rental prices.

Which mobile scaffold suits impregnating a facade?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Bands without streaks: impregnating from the 245 cm deck

Per position you work off a band two and a half metres wide, and within that band you keep moving until it is completely saturated. Start at the bottom of your reach and work in horizontal strips upwards, with the next strip still into the wet of the one before. As soon as you let a strip dry off before the next runs alongside it, a line stands in the facade that you never get out again and that only shows at the first damp.

When moving the same rule holds as for the bands: you stop on a natural boundary. A vertical joint, a corner, a downpipe or the edge of a sill are good places to end a position. Take everything off the deck before you roll, because a toppling jerrycan of impregnating fluid on a terrace is worse than a knocked over bucket of water. Then lock the wheels again, reset the stabilisers and only then carry your material up.

Working platform of a mobile scaffold at a front elevation, the two and a half metre strip treated per position

What is often underestimated is how much a thirsty wall takes. Old weathered brickwork can ask double what the label says, and then you stand halfway across the facade with nothing left. So take more than you think you need and keep a note of the litres per position. After the first band you know fairly precisely what the rest wants and how many days you still hire the mobile scaffold; with coating a facade you count in buckets per square metre, here in litres per band.

Hire the mobile scaffold and have it delivered once dry

Plan the delivery for the moment your facade is clean and dry, not earlier. If you have cleaned first, the mobile scaffold otherwise stands waiting for days while the brickwork dries out. Booked before 15:00 on a working day means delivery on the next working day, and you give yourself which day that must be and when everything is collected again. That way the delivery falls exactly on your first working day instead of you planning days around it.

The parts come as a complete, counted set and are put down where you point. Choose a spot beside your first position and not in the zone where the product will later run down. Building is your work: the manual is in the box and the accompanying video walks you through the steps. For this height you build with two, and allow a couple of hours before the first jerrycan is opened, because half a setup gets you nowhere.

Scaffold parts loaded in the delivery van, the way a complete set for a facade job is supplied

If you would rather drive yourself, you collect the set free at Zeeburgerpad 89 in Amsterdam, by appointment; do consider that the uprights are long and that a build for nine metres asks a sizeable van. After your last working day we come to fetch the mobile scaffold again, on the date noted with your booking. Bringing it and collecting it are charged as one fixed sum, set for each province; the figures stand with VAT on the page with delivery charges.

Working safely on the scaffold along a wet facade

What you take up on this job weighs little, and still it is good to know what you stand on: the deck is made for 200 kg per square metre, which is load class 3 within EN 1004. With two people and a jerrycan you stay well under that, even with a tool box beside you. The point here is rather the deck itself, because impregnating fluid that lands on the platform makes the surface slippery without your seeing it coming.

So wipe spilt product away at once and keep a dry cloth to hand up there. Take the internal ladder rather than the outside of the frame, and keep your hands free; the jerrycan goes up on a rope. Before you begin, put all four wheels on the brake, and never roll the tower along with a person aboard or kit still lying on the deck. That last is tempting when you shift only a metre, and precisely then it goes wrong.

Mobile scaffold with guard rail and a ladder on the inside, the way up that turns slippery during wet facade work

Look at who walks below you as well. The product is not something you want to catch a passer by with, so fence your working strip off with tape or a cone and do not work above an open door. In wind the mist from a low pressure sprayer carries a long way, and then stopping is the only good option. Above nine metres you also feel every gust tremble through the build, and that is the moment to come down.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for impregnating a facade

1

Test the product first on half a square metre of the least visible elevation. That shows how much the stone takes and whether it darkens, before you do the whole front and days of hire are involved.

2

Hang a bucket hook on the guard rail for your jerrycan. A can standing loose on the deck always slides the wrong way when you move the mobile scaffold and leaks down past the plinth.

3

Begin on the elevation the sun only reaches late in the afternoon. You then work in the shade throughout, and that is exactly what you need to let your bands join wet on wet.

4

Mask the sills and the ground floor frames before the mobile scaffold stands. Once the setup is there you reach those edges badly with tape and end up working around the stabilisers.

5

Keep a note of how many litres the facade takes per position. After two setups you know whether you have enough product in the house or must hire a day longer while more is on order.

6

Rinse the spray head below and not on the platform. Water with traces of impregnating fluid makes the deck treacherous, and you notice it only when you step aside with a full can.

Frequently asked questions

Frequently asked questions about impregnating a facade

Which mobile scaffold do you hire to impregnate a facade?+

The wide RS52 of 135 cm is the best choice here, though not because of the weight. Up top you carry only a jerrycan and a spray head, but you do want to reach far sideways and to fit on the deck with two so the band stays wet. On a narrow scaffold of 75 cm you get in each other's way. Only where the passage to the rear is tight do you hire the narrow version instead.

How does the hire run for this facade treatment?+

You book the wide version online with the build height your facade asks, mark the day it is to arrive and the day it goes again, and settle a fixed amount with VAT beforehand. The parts are delivered counted, you assemble the mobile scaffold and work your positions off. At the end you dismantle everything and stack it ready for the driver. Extending is possible in between, as long as you say so before the collection round is planned.

How many rental days do you need to impregnate a facade?+

Two to four rental days covers most houses. Applying costs little time, but you pass all the positions again at every height level, and on thirsty brickwork sometimes twice over the same band, which adds up in the days you hire. Taking the side elevation along as well adds another day. If the facade must be cleaned first, hire the mobile scaffold only once the brickwork has dried out again.

What is the cost to hire, and how does an extra day work out?+

The rental price of the mobile scaffold follows from the build height and the model, with alongside it a fixed rate per province for delivery and collection, all with VAT included. After the first twenty four hours every day falls a good deal lower, so anyone reserving an extra day to wait for dry weather pays hardly anything for it. With a product that needs a dry surface, that is a pleasant arrangement to have in hand.

Which working height do you hire for a house facade?+

Measure from ground level to the highest brick being treated, usually under the gutter or the roof edge. On an average house with two storeys and a pitched roof you land between seven and nine metres, so you hire a mobile scaffold built to 5.2 to 9.2 metres of working height. Remember that the platform stands about two metres below that figure, and that on a sloping garden you measure from the lowest point.

Can you have the mobile scaffold delivered on the day the facade is dry?+

Yes, and that is exactly how you plan it. You choose the delivery date yourself, so let the mobile scaffold come on the morning you start impregnating and not while you are still cleaning. Book early enough and the set stands there the day after your order. Fetching it yourself is allowed too, free and by appointment, though a build for nine metres asks a large van or a trailer with enough length.

Must you build the scaffold yourself or does the hire firm do it?+

Assembly falls to you. You get the mobile scaffold as a counted set with the assembly instructions; we only bring it and collect it. For a build towards nine metres you work with two and go up lift by lift, with the stabilisers folded out in good time. For this job that suits well, because you start low anyway and only extend once you reach the top bands. So there is never more scaffold standing than you actually need.

Can you rent longer if the facade takes more product than expected?+

That is possible, and on thirsty brickwork it happens regularly. You pass on that you are keeping the mobile scaffold longer and the collection day shifts. Because the days after the first count at a discount, that is a good deal cheaper than having the setup taken away and ordering it again later. Do not wait until the morning of collection; once two positions show you need more litres, you know enough.

How much room must be free to hire this scaffold?+

Keep a strip of two metres free along the whole facade, because the stabilisers project on every side. You also want to cover the ground under your band, so move planters, bikes and bins before the set is delivered and keep that space clear for as long as you hire. Standing on the pavement, leave a walking route for pedestrians and tell the council if you occupy part of the footway.

What do you do if it starts to rain during your rental period?+

Stop for the day. A wet facade no longer takes the product up and a shower just after application washes some of it away again. The mobile scaffold can stay standing, because rain does it no harm; only the deck turns slippery, so wipe it dry before you go up again. Use such a day to cover up, run tape on or check the plinth, and pick the bands up once the brickwork is dry.

How soon is the deposit back after the hire ends?+

As soon as the set is returned and counted through, the deposit amount is back in your account within 1 working day. With impregnating work watch the platform sections above all: a product that dries onto the timber or the profile leaves marks that will not come off. Lay a tarpaulin on the deck where you set the jerrycan down and rinse spilt product away with water at once, then you hand the mobile scaffold in clean.

Can you saturate a whole facade evenly from a mobile scaffold?+

Yes, provided you match your positions to the bands. Each setup covers a strip of some two and a half metres, and you make sure the next strip still joins into the wet, so you move with judgement and never halfway across a surface. Where that gets awkward, let the transition land on a corner, on a downpipe or in a vertical joint. Hiring a rolling tower then gives the same even result as a fixed stage.

Hire a mobile scaffold for impregnating a facade today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.