See your price
Application

Replacing a gutter? Choose the right scaffold.

Replacing a gutter takes the whole length out and puts a new one back. That means long sections going up, brackets reset to a fall and an outlet connection that must fit exactly. You work beside the gutter, not above it, with your hands at channel level. For the gutter of an extension, garage or low back wall you therefore hire a narrow mobile scaffold that needs no more than 4.2 to 6.2 metres of working height. Below you read which build to book and for how many rental days.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For replacing a gutter we recommend the Narrow mobile scaffold.
  • You hire a narrow RS51 with 4.2 to 6.2 metres of working height, so you stand at gutter level.
  • Long gutter sections and brackets go up with you, so work with two people and keep the deck clear.
  • Reckon on two or three rental days: breaking out, setting brackets to fall, laying the new gutter, connecting the outlet.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job4.2 to 6.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for replacing a gutter?

Safe, stable and professional work at height

Replacing a gutter is assembly work along a long line. First you take the old channel away, then you set every bracket out again with a small drop per metre, and only once that line is right do you lay the new gutter into it. That asks for a position where you can work with both hands and take on a section of a few metres without reaching. When you hire a mobile scaffold to replace a gutter, what counts above all is standing at the right height: at gutter level and not a metre above it, because you have to push the channel into the brackets rather than look down on it while trying to hold it.

  • Working at gutter level, not above the channel
  • Long sections lifted up by two people
  • Setting out the fall over the whole length
  • Working height 4.2 to 6.2 metres on low gutters
Read more about working safely →

Hiring the right mobile scaffold for a complete gutter replacement

For this work you usually take the Altrex RS51, the narrow tower listed in the brochure as the RS TOWER 51. It is 75 cm wide and builds from 4.2 to 14.2 metres of working height, of which you need only the lowest settings for a low gutter. The slim measure helps with getting there: you generally have to go round the back with it, past a garage or along a path down which the old gutter also has to come. The range sits on the page about mobile scaffold hire.

Up top you handle material longer than the tower itself. The deck measures 245 cm, and that is just enough to lay a gutter section down while you slide it into the brackets. It stays a make do, because the end of such a section always overhangs and has to rest somewhere. So keep the deck clear and put screws, sealant and tools in a tub on the rail instead of loose beside your feet on the platform.

Mobile scaffold built along a side wall in a low setting, the position in which a new gutter is fitted

Because you nearly always work in a pair, the wider RS52 with its 135 cm deck is a serious option here. Two people side by side with a gutter section between them is cramped on a narrow deck. Tackling short lengths of plastic gutter on your own, the narrow version does. Think about the way through to the back garden as well, because a wide tower does not pass everywhere. The difference between the two is in the comparison of sizes.

Working height 4.2 to 6.2 metres: standing at gutter level

This job asks for a lower build than most wall jobs. You do not have to look over the gutter but hold it, press it into the brackets and screw it in place, and that goes best with the channel bottom somewhere between your waist and your chest. Stand higher and you work bent forward with a four metre section in your hands, which nobody keeps up for an hour without feeling it in their back.

The sum stays simple. Take the height of the deck you will stand on, add around 2 metres for what your arms add, and you have the working height you enter when you hire the tower. For this job that deck therefore sits strikingly low. For the gutter of an extension, a garage or a low back wall at some three to four metres you land on 4.2 to 6.2 metres. On the page about working at six metres you see what that build looks like.

Narrow mobile scaffold set against a wall, its deck at the height where gutter brackets get fitted

Choose too tight and you stand pushing with your arms stretched out, unable to get the gutter tight into the brackets, which shows up later as a pool of water at one point. Choose too generously and you stand above your work and have to stoop at every screw. So measure beforehand exactly how high the gutter line sits, counted from the ground the wheels will rest on. For an extension or a store on the ground floor you stay near the lowest setting.

The standing place for long gutter sections and a new outlet

On a replacement you need room not only under the scaffold but beside it. The old channel you take out has to go somewhere, and the new sections, the brackets and the stop ends have to lie somewhere until you pass them up. Reserve a strip along the wall or a piece of drive for that, and bear in mind that a gutter length of five metres does not simply fit between two shrubs. The four stabilisers ask for their own space as well.

The ground has to be flat and firm, because you move the tower regularly with tools about and you lift heavy material up it. Gravel, a soft border or loose slabs are harder here than on light work. Where the garden falls away, level the base before you build on, since a build out of true shows up straight away in your bracket line on this job. The approach for that is in the piece on stabilising and anchoring.

Scaffold parts on the street next to a house, the room you also need for old and new gutter lengths

Mind the place where the downpipe sits as well, because on a replacement that often comes partly out. You need room there to work and to lay the lower length of pipe down with its clips. If the tower stands on the street side, keep a way through free for pedestrians and do not put the old zinc on the pavement, but straight into a trailer or a skip you have standing ready for it beside the house.

Number of days to hire for replacing a gutter

A gutter replacement is no morning's work. A repair at one point is finished in a day; here the whole length comes out. On the first day you build and take the old channel off, and then it often turns out that the brackets or the timber behind them are past it too. After that comes setting out the new bracket line, laying the gutter in, connecting the outlet and finishing the corners and stop ends. For a single wall hold two to three days, and for a whole house more.

Waiting times sit in the material and in the weather. Glued joints in plastic and soldered work in zinc want dry weather and time, and a wall you have lying open you do not want to leave out in the rain. So do not plan the breaking out day just before a wet spell. Count as well on fetching a replacement piece of fascia board or an extra bracket costing you half a day, certainly if you start on a Saturday.

Assembled mobile scaffold with rails at a house, the set up in which a gutter gets replaced

For the rental price that works out well. Over the first 24 hours you settle the full rate; from every day you stick behind it, 95% comes off the amount, so a spare day adds almost nothing to the total. On a job that depends this much on what you find behind the old channel, that is the cheapest insurance there is, and it saves you a second delivery. More on that is at estimating the hire duration.

Which mobile scaffold suits replacing a gutter?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Setting out the fall from a deck of 245 cm

The length of your deck decides how far you get per position, and that is a good two metres. A gutter is usually a fair bit longer, so you work in stages along a line that has to be right over the whole wall. Set the fall out first, therefore, before you start fitting: run a line from the highest point to the outlet, mark where every bracket goes and check that line from the ground. Only then do you start screwing.

Getting the sections up is the second thing to watch. Pass a long piece of gutter up from the ground rather than carrying it with you over the ladder, and let the second person stay below until the section lies on the brackets. Never lift anything while you are moving the tower, and lay a section you are not using flat on the ground instead of leaning it against the rail, where the first gust takes it away.

Mobile scaffold built along a front wall, the position from which the bracket line for a gutter is set

Where people go wrong here is the number of moves. With ten metres of gutter you shift four or five times, and each time the brakes have to come off, the stabilisers up and everything back again afterwards. Count those minutes into your day plan, because four moves a day soon make an hour. If the outlet is due for renewal too, take replacing the rainwater downpipe along in the same rental period now the tower is there.

Delivery and building when you hire for a gutter replacement

You get the scaffold delivered as loose parts, complete and counted, and you put them together yourself. We do not build and we hand over nothing assembled; with the manual and the instruction video that works fine with two people, and on this job you need that second person anyway. Look carefully at where you drop that stack, because the space beside the wall is already badly needed for the gutter material you are about to fit.

The ordering deadline is 15:00; whatever is in before that on a working day stands ready the next working day. Handy if you only ordered the gutter after taking the measurements. You pin the delivery date and the collection date yourself, so let the tower come a day before demolition day. Fetching it yourself is free and by appointment at our collection address. What you pay for delivery depends on your province and is in the overview of transport charges.

Scaffold parts loaded in the van for transport, the complete set delivered for a gutter replacement

When you have finished, the mobile scaffold comes apart and you set all the parts together for the driver, who takes them away again. Plan that collection day preferably after the first decent shower, so you can still see whether the new gutter really runs off and does not come over the rim anywhere. If a bracket turns out to be needed, you are back at height within a quarter of an hour instead of having to book again.

Safety during hire: long gutter sections at height

The decks carry an EN 1004 rating, load class 3, which works out at 200 kg per square metre. On a replacement that is no theoretical figure: two people, a box of screws, a cordless drill and a section of gutter or an old zinc channel mount up nicely. Spread that weight over the deck and do not leave the material you have broken out lying on it, but pass it straight down to somebody who takes it and puts it away.

The ordinary rules matter here more than usual. Brake the wheels before anybody climbs on, move the tower only when nothing and nobody is left on it, and stop work when it starts to blow. That last one weighs heavily on this job: a five metre gutter section catches wind like a sail, and you notice that only once you already have hold of it. Check the four stabilisers at every new position and see that they all press on the ground.

Counted scaffold set standing checked and ready, the way it is supplied when you hire for gutter work

Sharp material is the other risk. Old zinc has cutting edges, brackets pulled loose are full of rusty screws and a falling piece of gutter lands hard below. Work with gloves, keep the zone under you clear and warn anyone nearby before you lower something. Never lay broken out pieces on the rail and do not leave screws rolling about the deck. A hard hat below the working deck is no luxury on this job. The rest of the rules you read at safe work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for replacing a gutter

1

Measure the gutter length and the height before you reserve the tower. You then know at once which build you need and how many positions it takes to reach the whole line.

2

Run a line from the highest point to the outlet and mark all the bracket positions on it before you unscrew anything. With a new gutter that line decides whether the water runs away or stands.

3

Lay the new gutter sections on trestles beside the scaffold rather than in the grass. They stay clean and straight, and you can pass them up in one go without wiping mud off the edge first.

4

Look at the timber behind the gutter as soon as you break out. If it is soft you need an extra day, and you would rather plan that when hiring than discover it halfway through the job.

5

Always pass long sections up from the ground and never climb the ladder holding one. Somebody standing below and handing up works faster and safer than one person trying to manage it alone.

6

Keep a rental day in hand after the replacement to check in the rain that the water runs to the outlet. Adjusting is then immediate, without a tower having to come out to you again.

Frequently asked questions

Frequently asked questions about replacing a gutter

Which tower do you hire when the whole gutter comes off?+

Usually the narrow RS51 at 75 cm wide, because you wheel it past a garage or through a gateway to the back. Working in a pair on long gutter sections, the wider version with a 135 cm deck is calmer, since you are not then in each other's way with a length of channel between you. Both models are in the hire fleet and differ mainly in width and in the number of parts you carry.

How does hiring a tower work when you replace the gutter?+

You reserve a version and a height online, give the dates between which you need it and pay a fixed amount in advance, including VAT. On the day you chose we drop the parts at your place. You build, break the old gutter out, fit the new one and afterwards set the scaffold dismantled and ready. We collect it all again. Further questions about the hire are among the frequently asked questions.

How many days do you hire to fit a new gutter?+

For a wall with a gutter of eight to ten metres, count on two to three days. Breaking out costs less time than setting the brackets and laying the new channel straight. If the house runs round, or an outlet has to be renewed as well, add a day. Because the following days of a mobile scaffold hire cost little, plan generously rather than tightly on a job of this kind.

What does hire cost on a job that can overrun?+

The height of the rental price follows from the tower you choose and the build, with a fixed amount per province for transport on top. On a gutter replacement the discount rule is welcome: the weight sits on the first rental day and what you put behind it hardly counts. That makes overrunning affordable. The exact rates stand including VAT on the price page, so you can check them calmly before booking.

Why do you hire a lower working height here than for other wall work?+

Because you have to be at the gutter and not above it. You push the new channel into the brackets and screw it fast, so you want the gutter bottom at about hip height. On an extension or garage at three to four metres you therefore land on 4.2 to 6.2 metres of working height. Measure from the ground where the tower stands on its wheels and not from a raised terrace, since that easily costs half a metre.

Can you deliver the scaffold on the day the new gutter arrives?+

Yes, the delivery day is yours. It is handy to have the mobile scaffold come a day before the gutter material, so you can build calmly and start breaking out at once. Order in time on a working day and the delivery can take place the following working day. Collecting by appointment in Amsterdam is possible too and is free, provided you have transport the decks and braces of a complete set fit into.

Is building included in the hire?+

Building stays your own task, with the supplied manual and the video to hand. We hire out the material and do not assemble, and facade scaffolding or a cherry picker is nothing we stock. On a gutter replacement that is rarely a drawback: you are working with two people anyway, and a mobile tower is exactly the thing you can wheel along the wall yourself while you finish the bracket line.

What if the timber disappoints and I want to hire for longer?+

That is possible, so long as nobody has taken that tower for the following days. On a replacement, overrunning is more the rule than the exception, because soft wood or a rotten fascia line often appears behind an old channel. So take an extra day at the reservation and sign off earlier if it turns out well. An extension costs little through the discount from day two, certainly against a second delivery and build.

How much space do I clear if I hire a tower for this?+

More than for cleaning or painting. Besides the foot of the tower and the stabilisers you need a strip to lay the old gutter down and to keep the new sections straight. Think of a length of five to six metres along the wall or on the drive. Clear that place before the delivery comes and you will not be shuffling a gutter section about later on. A drive or a hard path beside the wall is the ideal spot for it.

May the scaffold stay up if the weather turns during the hire?+

The scaffold may stay standing, but you stop the work. A wall lying open with loose brackets is not something you leave in the rain, and solder or adhesive will not bond to wet material. In a strong wind you come down anyway, certainly with long sections in your hands. Because you set the end date yourself, you simply shift a day at little extra hire and need not rush a half fitted gutter.

How does the deposit work when hiring a mobile scaffold for this demolition work?+

The amount you paid as a deposit goes back to your account one working day after the return, once every part of the hired scaffold has been checked off and proves complete. On a replacement the risk is mainly that small parts go missing among the old zinc or under the building waste. So keep the scaffold parts separate from your demolition material. In the notes on the deposit you read exactly how it works.

Can I reach the whole gutter length from this tower at once?+

That is not possible, and it is not necessary either. Per position you finish a good two metres, so on a wall of ten metres you move about four times. What matters is that you set the bracket line out with a line in one go, because it has to be right over the full length. The fitting you then do in stages, and moving the tower costs only a few minutes of your rental day.

Hire a mobile scaffold for replacing a gutter today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.