See your price
Application

Exterior painting? Choose the right scaffold.

Exterior painting is rarely one bounded job. It is the frames on the street side, the front door with its threshold, the timber under the roof edge and usually the rear elevation going in the same visit. So you work all the way round, in stages, spread over weeks in which the weather decides when you paint. For that pattern you take the RS51, the narrow 75 cm model that gets past everything, built to 4.2 to 8.2 metres working height. Below you read how many setups that takes and what hire period suits.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For exterior painting we recommend the Narrow mobile scaffold.
  • For exterior painting on an ordinary house the RS51 of 75 cm fits, built here to a working height between 4.2 and 8.2 metres.
  • Add up your setups per elevation: a terraced house done all the way round soon reaches ten to fifteen standing positions.
  • Think in a hire period of one to two weeks, because every shower and every cold morning pushes your planning along.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job4.2 to 8.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for exterior painting?

Safe, stable and professional work at height

A full exterior repaint takes a long time and covers four sides of the same house. That is exactly where a ladder falls short: you move it dozens of times a day, you have one hand free and each position reaches a band barely a metre wide. With paintwork you want to finish a frame completely in one go, with paint, sealant, abrasive paper and a cloth all within reach. Hiring a scaffold for exterior painting therefore means thinking in weeks and not in hours: you put up one setup, work that band right through, roll on to the next and take the elevation on the other side as soon as the weather lets you.

  • Four elevations, each with its own approach
  • Frames, sills and timber under the roof edge
  • Highest timber at 4.2 to 8.2 metres
  • Weather and season decide your painting days
Read more about working safely →

Which mobile scaffold to hire for exterior painting all round

Anyone tackling the outside paintwork all the way round ends up at the RS51: 75 cm narrow and light enough to move on your own. That width decides it here, because the same setup has to go through the gate to the back, past the shed and along the path between wall and boundary. A model that stands well at the front but will not pass round the back forces a second hire period halfway. Which versions stand ready is listed under mobile scaffolds for hire.

On the deck itself you barely miss that extra width when painting. A tin, a brush, a sanding block and a roll of tape are what you need, and those sit comfortably on a deck 245 cm long. The wide 135 cm version only becomes worth considering if two painters share one setup, or if filler, sealant and rot repair kit have to go up alongside the paint. For an ordinary round of frames and doors that is overkill, and the extra weight tells every single time you steer it through the gate.

Hire set delivered to the kerb of a terraced house, rail frames leaning on the brickwork beside a cargo bike

Working alone and staying under about six metres, the MiTower is an alternative: 75 cm wide, made for one person and handled without help. For a house whose timber runs on up to the roof edge you will not get there, because you need the taller build for that. Torn between the two, look at the one person tower in the fleet, set its reach against your highest frame and count the sills you would still be missing.

What working height to hire for exterior painting to the eaves

On a job all the way round it is not the average that decides your choice but the very highest point still getting paint. That is rarely just a window on the first floor and usually the timber right under the roof edge, or the head of a dormer. For a house with a ground floor and one storey you land on a reach between 4.2 and 8.2 metres. The matching build is set out under eight metres of working height.

Walk all four sides with a tape before you commit, because the surface you stand on lies somewhere different each time. At the back the garden may drop half a metre against the pavement while the front is level. The working height quoted is the platform height plus about two metres you still catch with a stretched arm, so note per elevation how high your deck has to come and then take the highest of those four.

Mobile scaffold standing at a front elevation up near the eaves, the reach a full exterior repaint asks for

Choose too tight and you find out at the last elevation. The lower windows work, the head of the frame does not, and you stand with a half painted house and a tower that goes no further. Swapping to a taller build at that moment costs more than booking generously from the start, because an extra journey comes with it and you lose a working day mid planning. Working on the first floor as well means the edge above it simply belongs to the job.

Hiring a mobile scaffold along four elevations of one house

Every side of the house sets its own demands on the standing position. On the street side you stand on the pavement or in a parking bay and keep a walkway free for pedestrians. At the side it is usually a drive, where the car has to go while the painting there runs. At the back you land on grass, gravel or a terrace with a fall you cannot see until the spirit level lies on your deck.

Walk those four situations before delivery takes place, and look per side at what the stabilisers need. They project outwards at an angle and ask the same clear space everywhere, including on the path that is only eighty centimetres wide. A falling drive or a sunken slab calls for base plates, and a gully or a grate right under a foot calls for half a metre of shift. Getting such ground level is covered in the piece on uneven ground.

Assembled mobile scaffold along a side elevation on a drive, one of the four positions an exterior repaint needs

The obstacles differ per elevation too. At the front there is a hedge or a parking space you have to apply for with the council, at the side the meter cupboard and the boundary, at the back a shed roof, a pergola and the washing line. Note per side what has to move and clear it in one go on delivery day, instead of dragging something aside at every reposition. Over ten to fifteen standing positions that saves you hours.

How many days to hire a tower for exterior painting

Start by counting rather than guessing. A terraced house asks two to three setups at the front, as many again at the back, and on a corner or detached house it climbs to ten to fifteen positions in total. Per setup you are soon half a day to a full day busy with sanding, filling, priming and finishing. That brings a complete exterior repaint out at seven to fourteen hire days, depending on how much timber there is and how much of it has to come back to bare wood first.

On top of that comes the season. From April into September you have long days and timber that dries out; in March and October you run into morning dew that only lifts around ten, and an afternoon already too cold by four to lay another coat. So reckon with half working days early and late in the year, and put a couple of spare days into your hire period for them. What the cold months mean is set out in this piece on painting in winter.

Mobile scaffold with guard rails standing at a house for days on end, the setup a repaint is carried out from

Over such a long period the shape of the rate weighs heavily. Only the first twenty four hours go at the full amount; each day after that carries 95 per cent off, which brings two weeks close to one. That changes your planning: you no longer chase a run of dry days but leave the tower standing and paint when you can. So book a week too many rather than having to hand the tower back halfway through the fourth elevation.

Which mobile scaffold suits exterior painting?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Exterior painting per 245 cm scaffold deck, elevation by elevation

Per standing position you cover a band of 245 cm, and on an ordinary house exactly one frame with a piece of wall beside it fits into that. Finish the band completely before you roll on: sand, dust, run along the sealant lines, prime where it is bare and only then lay the finish. It is tempting to sand the whole house first and paint the whole house after, but then every operation travels past fifteen spots on its own and you double the repositions.

Keep a fixed order per elevation as well. Work top down, so dust and spatter fall on work not yet treated, and leave the sills until last because that is where most dirt collects. That way you never go back within a band to a place where the paint already stands, and at the next elevation you recognise at once where to start. Doing the frames at the rear in the same visit follows on directly, while you are still in the garden.

Frames, tubes and orange braces piled on a brick drive, the parts that make up one 245 cm platform length

Take up per setup what that stretch needs and no more. A tin, a brush, a sanding block, a cloth and the sealant gun is plenty; the rest stays below. Moving is done with an empty deck and the wheels released, never with a half full tin somewhere in a corner. With fifteen standing positions, count on fifteen fresh levellings and reckon those quarter hours honestly into your day. Together that is half a working day.

Rent a mobile scaffold with delivery before your painting weeks

No erected tower comes driving up, but a set of parts checked for number in advance. Pick a spot beforehand where those parts may lie without being in the way, because on a job of weeks you otherwise walk past them daily. A corner of the drive or a strip along the fence works well. If your order is in before 15:00 on a working day, the set travels out to you the day after.

Which day it comes and which day it leaves is up to you, and with outdoor work you hang that choice on the forecast. Have it delivered on a dry day when you have time to level it, because in the rain putting it up takes twice the effort and the parts stay slippery in your hands. Raising it is your part of the job: reckon on half a day with two people, manual and instruction video within reach. So put no paint on your list for delivery day.

Scaffold parts lying ready on the street in front of a house, the way a hired set is dropped off

We come for the mobile scaffold on the date you set; you take it apart and lay the parts within reach. Do that at a moment when the last coat feels hard, so you do not scrape tubes along freshly painted timber. Count the parts while dismantling and you know for certain everything goes back complete. Which amount applies in your own province is shown, province by province, in the overview of costs for delivery and collection.

Safe exterior painting on a tower, front elevation to back garden

The platforms are made for 200 kg per square metre, marked in EN 1004 as load class 3. With painting you rarely touch that, but do add it up when two people are up there with a tool box, a bucket of water and a couple of tins. Spread such things across the deck rather than parking them in one corner, and keep the way to the hatch clear. What the standard covers is explained in the piece on this scaffold standard.

Round a house the wind changes per side. At the front elevation you stand out of it and at the side you catch everything funnelling between the houses; that is precisely where you stop sooner than you would like. Brake the wheels before going up, let nobody stand on the deck while you reposition, and set all four stabilisers properly again after every move. With a storm forecast the loose items come off the deck and the tin goes down the ladder with you.

Rolling tower assembled tight to a brick side wall, its stabilisers splayed across the paving of a narrow passage

Two things belong specifically to painting outside. In the morning the deck is wet with dew and therefore slippery, exactly when you want to go up with a full tin; run a cloth over the rungs first. And on the street side people walk underneath you, so put out a barrier or a few cones and never lay tools loose on the edge. Warn the household as well, since the postman will otherwise walk straight under you. More rules are at working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for exterior painting

1

Before you reserve, make a list per elevation: number of frames, highest point, ground surface and what has to be removed. With those four lines on paper you know at once which working height and how many days you need.

2

Plan the side that stays wet longest for last. A north elevation dries hours later in spring than the sunny side, and paint on damp timber lets go again after a few months.

3

Look at the night temperature and not only at the daytime figure. Drop below about five degrees and a coat still not drawn in by four is dull and tacky the following morning.

4

Park the car elsewhere for the whole period instead of shifting it every morning. Your setup stands most stable on the drive, and you never have to rush a half painted frame.

5

Write on the inside of a cupboard door which frame you reached and which coat is on it. On a two week job with fifteen spots you will have lost that after one wet week.

6

Save the masking until the morning you actually lay the finish. Tape that sits two days in sun and rain on a frame leaves adhesive behind that you have to sand off again.

Frequently asked questions

Frequently asked questions about exterior painting

Which mobile scaffold should I hire to paint the outside of my house?+

In most cases the RS51 of 75 cm. On a full exterior repaint the same tower has to stand at the street side and round the back, and there is often a gate or a narrow path in between. The narrow model gets past there and is light enough to reposition single handed. Standing on the deck with two painters at once, or sending repair material up as well, makes the wide 135 cm version worth hiring instead.

How does hiring a scaffold work for a complete exterior repaint?+

Everything runs through the website: a model, a reach, one date for bringing and one for fetching, and a fixed amount including VAT. After that the hired mobile scaffold is at your disposal for the whole period and you drive it from elevation to elevation. With outdoor work that long period is the whole point: you paint when the weather plays along instead of on one date pinned in advance.

How many days should I hire a tower to paint a whole house outside?+

Reckon on seven to fourteen hire days for an average house with timber on all sides. That comes down to ten to fifteen setups, and per spot the sanding, priming and finishing costs you half a day to a full day. On a detached house with many frames you may happily add a week, certainly if rot has to come out of the sills too. Hiring short and then overrunning is the dearest version of this job.

What does hiring over such a long period cost?+

The rate hangs together with the model and the reach you choose, plus bringing and fetching at a fixed amount per province. The rental price including VAT stands with the rates per model. Because you book one period rather than a day at a time, it pays to set the end date on the far side of your painting weeks straight away, so that no second booking is needed for the last elevation.

What working height do you hire when repainting a whole house outside?+

Take the highest point still getting paint as your measure, usually the timber under the roof edge. With a ground floor and one storey you then sit between 4.2 and 8.2 metres of working height. Measure per elevation from the place where the wheels come, because a garden often lies lower than the pavement. Then take the highest of your four readings, so that one hired scaffold serves every side of the house.

Can I have the hired scaffold delivered if I want it for weeks?+

Over a long period that is the handiest route by far. You give a delivery day and a collection day, and in between the tower simply stays with you. Fetching is allowed as well: by appointment the set lies ready at no cost at Zeeburgerpad in Amsterdam. On a two week repaint that is seldom attractive, because you then drive through town with a trailer at the start and at the end.

Do you erect the tower, or is that not included in the hire?+

Not included. We deliver the parts and you put the mobile scaffold up with the manual and the video at hand; building it is your own work, preferably with two people. Repositioning from elevation to elevation and dismantling at the end come with it. We supply no cherry pickers, no facade scaffolding and no system scaffolding, so for ordinary outside paintwork this is the answer. Count that build time into your first day.

Can I hire extra if the outside work takes longer than expected?+

With outdoor work that happens more often than not. Flag it the moment it becomes likely, and the collection date on your hired tower moves back, unless the set is already promised to the next customer. Because you set the end date yourself, you can also make it generous at once and hand back early if things go well. On a weather driven job, booking wide beats juggling the diary afterwards.

How much clear space do the standing positions round a house need?+

Per position you need the width of the setup, plus the spread of the stabilisers on every side and enough room to walk past with a tin. On an exterior repaint that counts for each side of the house, so also on the narrowest path round the back. Check that gap before you hire a mobile scaffold, and shift bikes, wheelie bins and planters away from the walls you have still to start on.

In which season is it best to hire a scaffold for painting outside?+

April to September gives the most usable hours: dry timber, long days and nights that do not turn too cold. March and October work too, but then you start once the dew has gone and stop in the afternoon. In winter people mainly hire for repair work rather than for finishing coats. Late in the season simply allow more hire days, because you get less done per day than in June.

Does the deposit change if you hire the tower for weeks on end?+

No, you settle a deposit at the reservation whether the mobile scaffold stays with you for three days or three weeks. Once the returned set has been counted through, that sum returns to you one working day later. With paintwork watch above all for dried drips left on the deck boards and for every part going back into the van. There is more on this in the explanation of the deposit.

Can I do all four elevations with one hired scaffold?+

Yes, provided the narrowest point on your route is wide enough and the working height suits the tallest elevation. Those are the two things you measure beforehand. The tower rolls on its wheels from front to back, though you sometimes lift it over a threshold or a raised garden path. With a step or a real level difference between front and back, allow for having to take the top sections off.

Hire a mobile scaffold for exterior painting today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.