Installing air conditioning? Choose the right scaffold.

Installing air conditioning is short work at one high point. The outdoor unit usually hangs on the first floor or just under the roof edge, and you need to get at it with brackets, a drill and a pipe duct. It is one spot on the wall rather than a whole elevation, and often you are up there on your own. For that you hire the MiTower, a one person tower measuring 75 cm across, with a working height reaching 6.2 metres. Below you read how to match the rental period to your installer.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For installing air conditioning we recommend the 1-person scaffold.
  • For air conditioning on the first floor you hire the MiTower: 75 cm wide and 4.2 to 6.2 metres working height.
  • You work from a single position straight under the outdoor unit, so two rental days usually cover the whole fitting.
  • Match your rental period to the installer's diary, because he is the one who decides when the refrigerant gets connected.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4.2 to 5.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for installing air conditioning?

Safe, stable and professional work at height

Installing air conditioning looks like an hour's job, but it is precision work at height with both hands. You drill a core hole through the wall, you hang brackets level, you lift an outdoor unit of tens of kilos onto those brackets and you feed pipes inside. Every one of those steps needs a fixed floor to push against, and somewhere to put tools down. From a ladder that does not work, because you have no free hand and no force to press with. Anyone who hires a scaffold for this chooses on stability and on timing, since the rental days have to coincide with the engineer's visit.

  • One high point on the wall
  • A heavy outdoor unit onto brackets
  • Core drilling and pipes running inside
  • Short job, rental period follows the installer
Read more about working safely →

Which mobile scaffold to hire for installing air conditioning

The Altrex Mi Tower is the most practical model for this work: 75 cm wide, built for one person and good for up to 6.2 metres of working height. For an outdoor unit on the first floor you sit comfortably inside that. It is light enough to put up alone and narrow enough to reach the wall down a drive or a side path. Which builds exist is set out on the page about the MiTower and its heights.

On the deck there is room for everything this job brings with it: a core drill, a hammer drill, a spirit level, brackets and a box of bolts. What does not fit is a second pair of hands, because this build is rated for one person. If two of you have to lift the outdoor unit onto the brackets, hire a mobile scaffold with a longer deck instead, such as the RS51 at 75 cm from the same range of towers.

Narrow mobile scaffold built up along a modern wall, the kind of setup you hire to install air conditioning

If the unit hangs higher than the first floor, or a heavy model arrives with a second engineer, the wide RS52 at 135 cm is the logical step. On that deck you can set the appliance down for a moment before it goes onto the brackets, and with a heavy unit that saves a lot of lifting. For an ordinary wall unit at four metres it is overkill, and there the narrow build mainly buys you speed.

What working height to hire for an air conditioning outdoor unit

Work out first where the top bracket will sit, because that is your highest working point and not the roof edge. For an outdoor unit under a first floor window that is usually around three metres, which puts you exactly right on 4.2 to 5.2 metres of working height. Working height here counts as the height of the deck you stand on plus the roughly 2 metres you reach with a stretched arm. Your platform therefore ends up around two to three metres.

Measure from the level where the wheels will land, and not from the threshold of the front door. Standing on a sunken patio or a drive that falls towards the street shifts the whole sum. If the unit hangs above an extension or a bay, you have to stay further from the wall and need extra height to get at it at all. Compare your own situation on the page about five metres of working height.

Mobile scaffold standing against a front elevation at first floor level, the reach an air conditioning unit asks for

Hiring too low shows up the moment you drill. A core hole is made with both hands and your body weight behind it, and that fails if you are working above your head. Levelling the brackets goes inaccurate as soon as you have to reach. Caught between two builds, take the higher one: half a metre too much you never notice, half a metre too little you feel all day. How high a wall point sits on that floor is at the height of a first floor.

Hiring a mobile scaffold for air conditioning: where it stands

The tower goes straight under the spot where the outdoor unit will hang, and that spot follows from the pipe route inside. So measure indoors first to find where the duct comes out, and only then fix the standing position. Under an outdoor unit you usually find a patio, a drive or a strip of gravel along the house. Slabs and tarmac are fine, while loose gravel and fresh soil ask for levelling plates under the wheels before you climb.

Around the base there has to be room for the four stabilisers, which splay outwards and take more space on every side than the build itself. At a house that is exactly where the outside tap, the drain, a bike rack or the bins usually stand. Clear it before delivery. Think too about where the appliance waits before it goes up, since you want it close to the tower and not at the back of the garage, because every metre carried with thirty kilos counts.

Folded out stabilisers at the base of a mobile scaffold, the clear ground you need under the outdoor unit

If the wall stands close to the boundary, part of your setup hangs over the neighbours' path. Mention it in advance, especially because core drilling makes a lot of noise and dust and can keep you busy for half a day. Check as well that the unit can blow out freely later without facing a fence, or you will be moving it after all. How to get a setup firm is explained in the piece on stabilising.

How many rental days to hire a scaffold for air conditioning

The fitting itself is a day's work at most. Marking brackets, drilling the core hole, sealing the duct, hanging the unit and tidying the pipes fits into a morning and an afternoon at most houses, from one position you never move. Even so you rarely hire the tower for a single day. You want it standing before you start and only taken away once you are sure nobody needs to reach the appliance again, and that alone pushes you towards two days.

The real planning sits with the installer. Connecting and vacuuming the refrigerant is an engineer's job, and he comes at his own moment. Until that visit has happened you have to be able to reach the outdoor unit. So ask for his date first and set your rental period around it, with a day of slack on either side. Then nobody waits and you build nothing twice, because a tower already gone when the engineer rings costs you a second hire.

Scaffold parts delivered on site at a house, the start of the rental period around the installation date

That slack costs you almost nothing. Only the opening twenty four hours are charged in full, and each following day joins the total with 95% off, so three days differs little from one. For a job that hangs on somebody else's diary that is exactly the room you need to keep. Put your collection date a day or two behind the appointment. How to judge such a period is explained in the piece on rental days.

Which mobile scaffold suits installing air conditioning?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Fitting the air conditioning from one mobile scaffold position

With air conditioning you barely move the tower. You set it down once, straight under the brackets, and finish the whole job there. That is precisely why the position matters so much, because half a metre too far left and you drill crooked or have to reach. So mark the bracket holes from the deck first, check that you can get at both ends comfortably, and adjust the spot before you drill for the first time.

Plan what goes up in one trip. Core drill, extension lead, hammer drill, spirit level, brackets, bolts and sealant come up with you, but the outdoor unit itself does not go up in your hands. That appliance you haul up on a rope or pass up with two people, because climbing a ladder or a stair with thirty kilos goes wrong. Lay a cloth on the deck so bolts and drill bits cannot drop between the platform sections.

Mobile scaffold with platform and guardrails tight against a wall, the fixed position you fit an air conditioner from

The duct is the moment you understand why a ladder is no good. A core hole is drilled sloping slightly outwards with your weight behind the machine, and that asks for firm footing. The same goes for pushing the pipes through, fitting the sleeve and sealing the duct, all of them things where you cannot hold on. If you are also fitting a ventilation grille or outlet that week, plan it inside the same rental period.

Delivery and build: scaffold hire around the installation date

What comes off the van is a set of loose parts, complete and counted beforehand. Pick a place for that stack in advance, because the drive or the front garden works better than the patio, where you will be standing with the appliance. Anything confirmed on a working day before 15:00 is at your address the next working day, so you can still decide late if your installer's date has only just been settled.

When the set arrives and when it leaves is your call. For this job you put delivery a day before your drilling, so you can build calmly without the engineer already at the door. Building is your work: the manual and the instruction video take you through it, and a one person build goes up fine alone. Allow half an hour before you can start marking. Run through the step by step build guide first.

Scaffold parts on the street beside a house, ready to build the day before the air conditioning goes in

Collection is ours, dismantling is yours. Put the parts together afterwards somewhere the van can get to them easily. Wait until the installer has finished his work, because otherwise the unit hangs loose on the wall with nobody able to reach it. Tick off the parts while you dismantle, so nothing has to be searched for on the last morning. Which amount applies to the run out and back depends on your province, and you find it under the delivery charges.

Working safely on a tower while installing air conditioning

Standard EN 1004 sorts scaffolds into load classes, and our builds sit in class 3, which allows 200 kg on every square metre of deck. On this job that is not a theoretical figure, because an outdoor unit soon weighs thirty kilos, and then you, a core drill and a box of bolts come on top. Put heavy material in the middle of the deck rather than all against one guardrail. What the classes mean is in the article about this standard.

Brake the wheels as soon as you step on and never move the build while tools or a person are on it. Drilling asks for sideways force, so check before you start that all four stabilisers stand firm. Stop in strong wind, because an outdoor unit is a large flat plate that works like a sail while you are hoisting it. A half full tool bag swinging from the guardrail comes off then too, along with everything loose on the deck.

Mobile scaffold with double guardrail and an internal stair, the safe way up to the outdoor unit

If you are working alone, arrange for somebody to be nearby. On this job you stand still in one place for a long time with both hands busy, and that is exactly when something drops: a core bit, a bolt, a length of pipe. Keep the zone under the tower clear, put a bucket there as a marker, and sweep drilling dust off the deck, because grit makes the floor treacherous. The other rules are on the page about working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for installing air conditioning

1

Mark the bracket positions before you settle the tower in its final place. A setup that sits exactly under the middle of the outdoor unit saves reaching and keeps your drill holes level.

2

Hoist the outdoor unit on a rope or pass it up with two people. Carrying a thirty kilo appliance up a ladder or an internal stair is the commonest way to wreck this job.

3

Have the tower delivered the day before your installer comes. You can then hang the brackets and drill the duct in advance, so he only has to connect the refrigerant instead of waiting.

4

Lay a cloth or a sheet of cardboard on the deck before you drill. Core dust makes the floor slippery and creeps between the platform sections, where you stand sweeping it out at the end.

5

Check indoors where the duct comes out before you drill outside. Hit a pipe or a joist and the outdoor unit shifts, and with it the spot where your mobile scaffold has to stand.

6

Plan your collection for the day after the engineer's visit. If a connection still leaks or a bracket has to move, you are not left with a unit on the wall and nothing to stand on.

Frequently asked questions

Frequently asked questions about installing air conditioning

Which scaffold do you hire for fitting air conditioning to a wall?+

For an outdoor unit on the first floor the MiTower is the obvious tower: 75 cm narrow, built around one person, with reach to spare for a wall point around three metres. It is light, you put it up on your own and it gets down a drive or a side path. If two of you lift the appliance, hire the RS51 with its 245 cm platform, or for a heavy model the wide RS52 at 135 cm.

How does hiring a tower for air conditioning work, from booking to collection day?+

You book online on model and reach, choose the delivery day and the collection day and settle a fixed price including VAT before anything arrives. The counted set is dropped at your address, you assemble it and hang the outdoor unit. As soon as the installer has finished you take the tower apart, put the parts together complete and we collect them again. The whole rental period is planned around that one appointment.

How many rental days does fitting air conditioning from a tower take?+

Two to three rental days covers most situations. The fitting itself is a day from one position, but you want the tower standing before you start and only collected once the refrigerant is connected. Doing several units, or a wall duct as well, add a day. Replacing an existing appliance on the same brackets sometimes fits inside one day. For a first installation, book on the generous side and give yourself a spare morning.

What does hiring a MiTower cost, and can you book a wider window?+

Your rental price is set by which build you take and the reach it must cover, and a fixed provincial amount covers transport out and back on top of that. You see the exact figure including VAT on the prices page. For a job that hangs on somebody else's diary it is worth booking one wider window instead of two short ones, because a second transport is the part that really adds up.

What working height should you hire for an outdoor unit on the first floor?+

Reckon on 4.2 to 5.2 metres of working height, with your floor around two to three metres. Do not measure to the roof edge but to the top bracket of the outdoor unit, and start your measurement at the bottom, where the wheels will stand. If there is a sunken patio or a sloping drive there, you hire a notch more height than you would guess by eye. Which tower fits which reach is on the working height page.

Can delivery of the hired tower happen on the day the installer comes?+

It can, but it is rarely convenient. You would still be building while the engineer wants to start, and he charges for his time. Choose the day before as your delivery day, and your mobile scaffold stands ready and waiting. Driving yourself is fine as well, since by appointment a set is free to collect in Amsterdam, at Zeeburgerpad, provided your van or trailer takes the frames. For one position that is quite doable.

Do you build the tower, or is that your own job when hiring?+

Building and dismantling are your task. We deliver the complete set and take it away afterwards, but assembling the tower is up to you, with the supplied instructions and the video to guide each step. A one person build goes up in about half an hour, even without help. Cherry pickers, facade scaffolds and system scaffolds are not in our hire fleet, so at this height you work with a mobile scaffold.

What if the installer overruns and you want to hire the tower for longer?+

Let us know as soon as the appointment shifts, and provided the set has not already been booked by somebody else, your collection day moves with it. With air conditioning that happens regularly, because engineers plan their routes by the day. If you would rather not depend on it, book two days of slack straight away when hiring. Returning early is always allowed and you pick the end date yourself, so a shifted route never traps you.

How much room under the outdoor unit do you need to hire a tower?+

Start from the width of the build and count the stabiliser spread on either side as well. In practice a clear, level strip of roughly two by two metres is enough for a one person tower. Make sure the bins, the outside tap and the bikes are gone before you hire. Allow a spot as well for the appliance to wait before it goes up, ideally within two steps of the scaffold.

Can you keep the scaffold on hire if the weather stops the fitting?+

The tower can simply stay standing and you only push the work back. You would rather not drill a core hole in the rain, and you do not hoist an outdoor unit in a strong wind. Days like that add little to the bill, because it is the first day that weighs. Do take the tools off the deck and seal the duct temporarily if it is already open, or the rain goes straight inside.

What happens to the deposit after hiring a tower for an outdoor unit?+

You pay a deposit up front when hiring a mobile scaffold, and it is credited back a working day after the set comes home and has been checked off. On this job watch out for drilling dust and sealant residue, so sweep the deck clean before you dismantle. A guardrail left behind or a mislaid brace holds up the settlement, so count as you go. More is in the piece about the deposit.

Can you hang the outdoor unit on your own from a one person tower?+

Hanging the brackets, drilling the core hole and feeding the pipes in is fine alone. Lifting the outdoor unit onto the brackets is not, because that is a job for two people or for a rope and a pulley. On a one person build only one person may stand on the deck in any case. If you want two of you up there, hire a wider mobile scaffold with a platform that takes two people side by side.

Hire a mobile scaffold for installing air conditioning today?

Calculate your rental price now or ask for free advice.