See your price
Application

Roof work? Choose the right scaffold.

Roof work is a collective name: emptying the gutter, laying a tile back, touching up the fascia, fitting a vent or having a first look at what is going on. Anyone who needs a tower often does not yet know what the job will turn out to be, and that makes choosing awkward. It can be made simple: measure to the roof edge and hire the wide RS52 with a working height of 6.2 to 10.2 metres. Below you read how to back that choice, and where this kind of tower reaches its limit.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For roof work we recommend the Wide mobile scaffold.
  • For most roof jobs you hire the RS52 of 135 cm wide, put up to reach between 6.2 and 10.2 metres.
  • Measure to the gutter or the roof edge where you will stand, not to the ridge, because you will not get there.
  • Not sure yet what the roof work becomes? Then take the most generous build and the longest hire period.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job6.2 to 10.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for roof work?

Safe, stable and professional work at height

The awkward thing about roof work is that the job often turns out bigger or different from what you expected. You climb up to straighten one loose tile and then see that the lead at the chimney is standing open and that a gutter bracket has split. Anyone with only a ladder at that moment goes back down and never gets round to it again. Hiring a tower for roof work therefore mainly buys you room to manoeuvre: a fixed floor at the roof edge where tools can stay put, days enough to take in the unexpected as well, and a setup you wheel to the next corner of your house without any fuss.

  • Roof work often proves bigger than expected halfway
  • A fixed floor at the roof edge with your tools
  • Reach of 6.2 to 10.2 metres up to the gutter
  • Moving round the house without rebuilding each time
Read more about working safely →

Which mobile scaffold to hire for roof work on a house

For roof work the RS52 with its 135 centimetre floor is the standard choice, and that is because something always goes up with you on jobs of this kind. A bucket for gutter muck, a couple of spare tiles, a sealant gun, a box of tools and often a second person as well. On a narrow floor all of that gets in its own way. What else is available you can see on the page about mobile scaffold hire, with the builds each version allows.

The slim 75 centimetre version stays a sound pick in one case: when the route to the back of your house runs through a gate narrower than a metre. Getting through then outweighs working room. If you are only busy at the street side, or you can walk the components round the house, take the wide one. For a garage roof or a low extension the MiTower with its smaller reach is sometimes already enough.

Wide mobile scaffold put up beside a house to gutter height, the model behind most roof jobs on a home

Keep the difference between model and build sharp when you reserve. The model settles the width of your floor and its length of 245 centimetres; the build settles the height you come out at. The same RS52 can go up low for the gutter of a bungalow and high for the roof edge of a house. Anyone who looks only at the model finds on the first morning that he is a metre short. So fill both fields in on purpose. Sizes per type sit together in the survey of tower measurements.

What working height to hire when the roof work is undecided

This is the question most people get stuck on, and the answer is simpler than expected. You measure not to the ridge and not to the chimney, but to the point where you will actually stand working: the gutter or the roof edge. Measure from the paving the castors will rest on up to that edge. At a bungalow or a garage you then sit at around six metres, at a house of two storeys at around nine.

Next translate that measurement into a working height. That figure is the height your floor hangs at, added to roughly two metres of reach, and it is exactly what you fill in when you reserve. For ordinary roof work on a home you land that way on a range of 6.2 to 10.2 metres. If you do not yet know which jobs you will all be doing, take the top of that range and not the middle; hiring on the edge of what you think you need seldom works out well here.

Mobile scaffold put up in front of a front elevation to gutter height, the measuring point your reach is based on

Choosing too tight is expensive on roof work, because the mistake only comes to light once you are already up there. Half a metre short means working in the gutter with straight arms, or not seeing the top row of tiles at all. A stance higher is one tick when you reserve. If you are unsure how high to sit at your type of house, look at the height per storey or at the page with working heights.

Hiring a tower for roof work: the route round your house

On roof work the setup rarely stands in one place. The gutter runs round, the tiles lie on two planes and the fascia sits on every side, so you shift position several times a day. That means you are not judging one standing place but a route. Walk that route beforehand and look at the ground per side: paving at the front, a narrow garden path along the flank, grass or slabs at the back where the castors sink in after rain. Note per side what you need in base plates or planks.

In every place the four stabilisers have to be able to come out fully. Along a house there are standard things in the way: a downpipe with a shoe, an outside tap, a cellar hatch, garden furniture and the neighbours' hedge. Clear away what you can before the parts arrive, because hauling things aside mid job costs you a quarter of an hour per move. How to get a setup solid on a sloping or soft patch is covered under stabilising and anchoring.

Stabilisers wound out under an erected mobile scaffold, what every standing place round the house needs

On roof work think about the overhang too. If the roof plane hangs a fair way outside the wall, the setup will not come tight against the brickwork and you work with a longer reach to the edge. In that case pick a little extra height rather than a little less distance to the wall. Does your home stand straight on the pavement? Ask the council what is permitted and always keep a walking route clear for people and pushchairs.

How many days to hire a scaffold for roof work

No single figure can be given here, because roof work runs from half a day to a fortnight. A round along the gutter you do on a Saturday; replacing a few tiles costs a day; painting fascia in three coats fills a week; insulating the roof longer still. So first settle what you are certainly going to do and then add what you will probably meet on the way and want to take in at once. That second item is rarely zero, and it is the one that decides whether your period is generous enough.

Then reckon with the slow moments and not the fast ones. Paint has to dry, sealant has to cure, and in rain or strong wind you simply cannot work at the roof edge. A job that takes two days on paper therefore often asks four hire days in practice. Add a half day for building and another for striking and clearing up, and your planning usually adds up. Count only the working hours and you will be phoning midweek for an extension.

Erected mobile scaffold along a side elevation, the setup you leave standing for several days during roof work

Happily a generous reservation is not dear with us. You settle the whole rate over day one; every day you stick on behind it goes along with 95 per cent off. That is exactly why roof work is better booked on the roomy side: you take the unexpected in your stride, without a second reservation and without an extra run by the van. More on that under the length of your hire period; each rental price stands on the price page.

Which mobile scaffold suits roof work?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

What roof work you can do from a hired tower

A tower takes you as far as the roof edge, and whatever plays out there is yours to do. Think of emptying the gutter and going over the brackets, checking the lowest rows of tiles, painting fascia and edge timber, taking moss off along the rim, fitting a lamp or a vent, and first of all looking at the whole thing calmly before you touch anything. That last is wiser more often than people think, because from the ground you miss half. The page on inspecting your roof is a good starting point.

What you do not do with it matters just as much. A mobile scaffold is not a step for walking up the pitched plane, and it does not bring you to the ridge or to a chimney in the middle of the roof. Cherry pickers, system scaffolding and facade scaffolds are not things we hire out, so work higher up the plane calls for other kit. What is and is not possible is set out under a tower at a pitched roof, the question of when to call in a professional included.

Guard rail frames leaning on a house wall behind a cargo bike, one hire set covering 245 centimetres of roof edge

Per setup you finish about 245 centimetres of roof edge, because that is the length of your floor. An average home has thirty to forty metres of edge, so count on twelve to sixteen standing places per round. That figure is the handiest sum you have: multiply it by the time you think each standing place will take, and you know at once how many hire days go into it, whether you are emptying the gutter or replacing tiles. That beats guessing by feel afterwards.

Hire a mobile scaffold with delivery for a roof job

You receive the tower as loose components, complete and counted in advance, so you decide where the stack ends up. Look for a spot you will not be using during the roof work, and certainly not the strip where your buckets and spare tiles are going to stand. Place the order on a working day and beat 15:00, and delivery lands on the next working day. Both dates you state yourself when reserving, so you can put the drop on a Friday if you want to work the weekend.

Building is under your own management. The manual in the box and the video that goes with it run through the assembly order; two people have the first setup standing in roughly half a day. Reckon that in on its own, since your building day rarely leaves room for real roof work, however early you make a start. For outdoor jobs it is also handy to lay your delivery day at the beginning of a dry stretch, so you can carry straight on.

Steigertaxi van with scaffold components in front of a house, the delivery you plan in for your roof job

Once you have finished, you take the setup apart and the van calls one last time for the components. Lay them complete and within reach and keep the count while dismantling, then nothing is missing afterwards and the return goes through without queries. The rate for a run out and back to your address stands with the delivery charges; if you are taking in the maintenance of your roof in the same period, plan that straight afterwards.

Safe roof work on a hired tower above eight metres

Every floor we hire out is built to EN 1004 and falls under load class 3, which comes down to two hundred kilos per square metre. On roof work you get nearer to that than when painting, because a bucket of wet leaves, a stack of tiles and two people add up hard. Spread the weight over the full length and do not pile everything at the access, since that is precisely the spot where you are standing too. Worked examples sit under load and weight.

The fixed agreements are short: brakes on before anyone climbs, never wheel with a person or material up top, and stop as soon as it blows hard. That wind limit you reach sooner at the roof edge than along a facade, because there you stand in the full wind and loose tiles or sheets can go with it. After every move walk the four supports and set the build level again before anyone goes up. Two minutes per standing place, and the cheapest insurance there is.

Mobile scaffold built up against a brick side wall, a separate extension ladder beside it, decks rated at two hundred kilos

On roof work one risk comes along that you do not have elsewhere: everything lying on a sloping plane slides off in the end. A chisel, a tile, a lump of moss or a screwdriver comes down beside your setup. Keep that zone clear, put something eye catching in it and warn whoever is busy in the garden. In a terrace, with the neighbours right beside you, that is no wasted trouble. The full list stands under working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for roof work

1

Study your roof once with binoculars from the pavement or from the garden opposite. You then know better what the roof work is going to be and how many days you realistically need the tower for.

2

Make a list of everything you want to do at the roof edge before you reserve. Jobs you take in during the same hire period cost almost nothing extra, while a second booking later does cost money.

3

Put your first setup on the side where you expect the most work. If the job overruns, at least the hardest stretch is done and you can let the tower be collected with a clear conscience.

4

On roof work use a bucket you can close rather than an open tray. Wet gutter muck, moss and shards then stay where they belong while you wheel the setup calmly to the next corner.

5

Photograph what you see from the floor as soon as you are up. Discover something you cannot solve yourself and you have images for a tradesman, and you know at once whether to keep the hired tower a day longer.

6

Plan your collection day one day after your last working day. On roof work you nearly always run into something else, and then you want the setup still standing rather than having to book again a week later.

Frequently asked questions

Frequently asked questions about roof work

Which mobile scaffold should you hire for ordinary roof work at home?+

The RS52 with a floor of 135 centimetres is the right choice for most roof jobs. On roof work something almost always goes up with you and you regularly stand there with two people. The slim tower of 75 centimetres you only hire when the route to the back runs through a narrow gate. For a garage roof or a low extension a smaller model with less reach can already do, certainly when you are working alone.

How does hiring a tower for roof work run from booking to collection?+

You pick the model online, the build and the two dates that count: when the components arrive and when they leave again. We bring everything along counted, you put the scaffold up and work your roof. At the end of your last day you dismantle the setup and stand the complete set ready for the driver. Prices are fixed in advance, VAT included, so you can cost the whole roof job at once.

How many days do you hire a mobile scaffold for roof work on a home?+

That depends entirely on what you are going to do, which is why no fixed number of days comes with this hire. A round along the gutter costs half a day, replacing a few tiles a day, paintwork in coats a week. Always add the building and the striking, and allow for drying time and for days too windy to stand at the roof edge. Unsure? Book roomily: adding days is cheaper than a second reservation.

What does hiring cost for roof work and why is day two so light?+

What you pay depends on the version and the build you pick, with the amount we charge in your province for bringing and collecting on top. The sum is stated including VAT before you commit to anything. On roof work that arrangement works in your favour, because the first day and night weigh heavily and all the days after them hardly at all. On a job that can swell, a roomily booked tower is therefore sensible.

What working height do I hire if I do not know the roof work yet?+

Set your tape at ground level where the castors come and read up to the gutter or the roof edge, because that is where you go to work. On a home of two storeys you then come out between 6.2 and 10.2 metres. Do not measure to the ridge, since you will not be taking a tower there. If in doubt, take the highest stance within that range; the reach page shows what each build gives you.

Do you have the tower delivered or do you hire and fetch it yourself?+

Both work. Delivery is the easiest on roof work, because you usually need your car for materials and the components are quite long. We call round on the date you name and a second time afterwards, for a fixed amount per province. If you would rather go yourself, the scaffold stands ready at Zeeburgerpad in Amsterdam by prior arrangement and at no charge, provided you have transport that the longest parts will actually fit into.

Is building included when I hire a tower for roof work?+

No, that is your task in this hire. The scaffold reaches you as a counted set of loose components plus a manual, and the instruction video shows which part comes when. With two of you the first setup takes about half a day, and shifting along the roof edge goes quickly after that. Our fleet holds no facade scaffolds, no system scaffolding and no cherry pickers, so this work is done from a tower you put up.

Can I hire for longer if the roof work turns out bigger than expected?+

Yes, pass it on and we push the collection day back, provided the tower is not promised elsewhere straight after you. On roof work that happens often: you go up for one loose tile and then see open lead or a split bracket. To get ahead of it, book a couple of extra days at once, since handing back earlier is allowed too. That way you never have to strike halfway and start again a week later.

How much clear room must there be per standing place round the house?+

Take the outside dimension of the scaffold, add the spread of the four supports and allow for a roof overhang keeping you further from the wall. Per side of the house you want a level strip of several metres free, if only to be able to wheel the setup along. Clear water butts, bicycles and garden furniture before the components come, because on roof work you shift often and every obstacle costs another quarter of an hour.

Can the hire carry on when the weather stops the roof work?+

The tower simply stays up; only the work on the roof is postponed. In rain, frost or strong wind at the roof edge, carrying on is unwise and usually pointless as well. Use such a day to lay materials ready, to prepare things indoors or simply to wait. Because you settle the end date and extra days cost little, a delay barely touches your budget on this hire. You lose a working day at most.

How does the deposit work when hiring for a roof job?+

A deposit goes along with the reservation. As soon as the returned scaffold has been counted and found in order, we credit the amount back to you within one working day. On roof work it usually comes down to two points: components that worked loose while shifting and do not travel back, and gutter muck or sealant residue left on the floor sections. A quick sweep on your last day of hire saves that bother.

I do not know yet which roof work I will do, so what do I hire?+

Choose the wide tower, take the upper end of the 6.2 to 10.2 metre range and book a few days more than you think you need. That covers virtually everything at the roof edge, from cleaning the gutter to fitting a roof fan. If the job proves lighter, you simply hand back earlier and nothing is lost. The other way round, without a margin, soon costs you a second booking.

Hire a mobile scaffold for roof work today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.