See your price
Application

Installing a dormer window? Choose the right scaffold.

Installing a dormer window is above all a logistics job. The unit arrives on your roof in one piece, usually on the hook of a crane parked in the street or on the drive. Your own share sits in preparing the roof slope, in guiding things on the crane day and in everything that comes after. The scaffold is your way up and your working floor, never a lifting device. The wide RS52 at 135 cm is ready for that, built here to around 12 metres.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For installing a dormer window we recommend the Wide mobile scaffold.
  • Hiring a scaffold to install a dormer means the wide 135 cm version, built to roughly 12 metres of working height.
  • The crane does the lifting and the tower does the rest: getting up, passing gear, preparing the roof and finishing after.
  • Keep the swing of the crane clear, so pitch the build beside the lifting path and never in the middle of it.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for installing a dormer window?

Safe, stable and professional work at height

People having a dormer installed think about the crane first and the scaffold last, which is the wrong way round. The crane is there for a few hours and then gone, while you are busy for days lifting tiles, cutting the opening, levelling the unit and closing the junction. All of that happens on the outside of your house, at a height a ladder will only get you to and not let you work at. Renting a tower gives you a fixed floor along the roof slope, a safe way up for two people and somewhere to put material while the crane does its part.

  • A fixed climb to the roof for two
  • A build chosen between 8 and 12 metres
  • Pitch clear of the lifting path of the crane
  • Room up top for tiles, battens and tools
Read more about working safely →

Which mobile scaffold to hire when a dormer is installed

On this job you take the wide Altrex RS52, with a working floor of 135 cm. The reason is not the lifting, because the crane sees to that, but everything around it: you take tiles off the roof and set them on the deck, you pass battens and boards up, and with two of you at the top you want to be able to get past each other. On a slim floor you are permanently in the other one's way, exactly when things have to happen quickly.

If a tight path or a gate is the only route round the back, the RS51 at 75 cm is the fallback. You give up working room, but you get where you have to be. Given a free choice, take the wide version: it saves fuss and climbing. Ask as well how many people are helping, since every extra pair of boots fills a narrow floor further. The models on offer are listed on the page where you rent a mobile scaffold for outdoor work, each with its build heights.

Wide mobile scaffold erected beside a home, the working floor used alongside the crane on a dormer job

What you must be clear about is that a scaffold is not lifting gear. Nothing hangs off the build: no chain hoist, no rope with a dormer sash on the end, no pulley on the top rail. The unit goes up on the crane, and the loose gear you carry by hand or haul on a line down the outside. Confusing the two means renting the wrong kit for the heaviest act of the day. There is more background in the article on scaffolds when a dormer goes on.

Working height for installing a dormer on a pitched roof

The point you have to reach is the lower edge of the roof slope where the unit lands, and after levelling also the top of the unit itself. On a two storey terrace that lower edge sits around 6 or 7 metres and the highest point of the box around 9. On a house of three storeys everything shifts up a floor. To serve both points you rent inside a band of 8 to 12 metres and pick according to what your own tape tells you.

When you book you do not state a platform height but a working height, and the difference between the two is roughly 2 metres of reach. Standing on a floor at seven metres, your hands come to about nine, and nine is the figure that appears on the order. So count back from the highest thing you want to touch. If you are unsure which build belongs with that, compare the options on the page about working heights before you commit.

Scaffold built up to just under the edge of a roof, the height at which a dormer unit is levelled

Choose too tight and you find out on the crane day, when there is no time left to arrange anything. What follows is that you stand on the top floor pointing with stretched arms while the unit hangs above you, and that you still need a taller build later for the finishing. An extra frame is quickly added if you take it into account at the booking, but not on the morning itself with a lorry in the street.

Hiring a tower beside the crane and where the build goes

The crane decides the layout of your street, not the scaffold. A lorry with a loader crane has outriggers that go a long way out, room to swing the jib and a clear path over the house or the front garden. So pitch your build beside that path, at the side of the elevation or a few metres away from where the unit comes down. Talk it through with the supplier a week in advance, because he is the one who knows where his machine will stand and how far up it has to reach.

Under the wheels you want flat, hard ground: block paving, tarmac or solid slabs. Set the four stabilisers out and allow for the space they take, since on a crane day all sorts of people pass along your build. If part of it stands on the footway, keep a way through for pedestrians and ask the council which rules apply in your own street, and do that early where parking bays are being closed off for the crane.

Erected scaffold along the side wall of a house, standing clear of the path a crane lifts along

Think as well about everything else arriving that day: the lorry with the unit, a trailer of tiles, perhaps a skip. Walk the pitch the day before with the supplier in mind and move aside anything at all that can roll away or topple over. If your drive falls away towards the road, read how to get the build level anyway in the article on uneven ground. A tower standing out of true is not something you will reposition on a busy morning.

How many rental days you need around the crane day

The crane is there for half a day, but your rental period is far longer. Before the unit can go on, the tiles have to come off, the opening has to be cut and the structure has to be ready. After it comes levelling, fixing and making the whole thing weathertight. So reckon on three to five days with the build standing, depending on whether you do the lot or only the preparation and the finishing. Have the box installed complete and you hire for less, though rarely under three days.

Inside those days sit waiting moments outside your control. The supplier decides when the crane comes, and that date slips by a day easily enough with bad weather or an overrunning previous job. In a strong wind the lift will not go ahead at all, and a roof slope already open is not one you leave out in the rain for days. So set your period with margin on both sides: a day before the lift and at least two days after it for the finishing.

Mobile scaffold standing at a house, as it does through the days on either side of a crane visit

That margin costs little. The first 24 hours decide what you pay and everything following it counts with 95 per cent off, so a five day booking sits close to a three day one. That is precisely the reason to book wide on a job whose most important day is fixed by somebody else. You are paying for calm in your plan instead of for a second delivery. How to judge such a period on a bigger project is covered in the guidance on estimating rental days.

Which mobile scaffold suits installing a dormer window?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Preparing the roof slope from a 245 cm platform

A floor 245 cm long gives you just enough length to serve a stretch of the roof edge without shifting every few minutes. From it you take the bottom rows of tiles off, pass them down and lay the roof slope bare where the opening will be. Where the box is wider than that floor you work in two pitches, and it pays to mark the second spot out the day before, so that nobody is manoeuvring a tower about on the crane day.

On the day itself the tower is mainly a passing post. One person up, one down, and between them go tiles, battens, screws and tools. Agree beforehand what travels in which round, because most of the time on such a day is lost climbing back and forth for something small. Everything you set on the floor goes against the guard rail rather than loose in the middle, so it does not get taken along when somebody squeezes past.

Scaffold with deck and ladder against a home, the climb used while the roof slope is made ready

What people misjudge is how many operations follow the lift. Once the unit stands, the levelling, the screwing and the closing up begin, and all of it happens off the same floor. So keep the build in place until the box really is fixed and shut, even when the crane has long gone and the street lies empty. If you carry on yourself with fitting and sealing the dormer, you use exactly these positions for a few days more.

Scaffold hire with delivery before the day of the crane

The parts come to you as a complete set, counted and whole: uprights, floors, braces, guard rails, toe boards and stabilisers. Book before 15:00 on a weekday and the van drives out to you the next working day. Choose a place for that stack that will not be in the way on the crane day, because the lorry with the unit needs the whole street side. A drive, a garage path or a strip of grass behind the gate works better than the footway.

The dates for bringing and fetching you pick while booking. Plan the delivery at least two days ahead of the crane, so you can build at a calm pace and get the first tiles off on the morning before. If the lift moves, pass your new dates on straight away; a finished tower waiting days for a unit only costs you room. Anyone driving themselves can take the set free of charge by appointment from the Zeeburgerpad in Amsterdam, provided the vehicle can handle the length of the uprights.

Van delivering scaffold parts at a house, dropped well ahead of the morning the crane arrives

When everything is done we come and take the build away again. You dismantle it and lay the parts where the driver can reach them, ideally on the same stacking spot as at the drop off. Wait until the box is closed and nobody has to go up any more, because rebuilding for one forgotten screw is a waste. The fixed charge for bringing and fetching per province is in the overview of delivery costs.

Working safely around the crane and the hired mobile scaffold

The most important rule on this page: you hoist nothing from a mobile scaffold. The floor is made for people and hand tools and carries 200 kilos to the square metre, which comes down to load class 3 within EN 1004. A dormer weighs a multiple of that and belongs on the crane. Nor do you lift part of a box, a window frame or a pack of roof boards with a hoist off the guard rail. How that class relates to your material is set out in the guidance on loading.

On the crane day itself you do not stand on the tower while the load hangs above you or swings past. Wait until the unit rests on the roof and the hook is free before you go up. Beyond that the usual points hold: wheels on the brake before the first person steps on, never roll it with anyone or anything on board, and stop when it blows too hard. In wind the crane stops anyway, so there is nothing to do up there either.

Stabilisers at the foot of a mobile scaffold in the street, the steady pitch set out next to a crane

Watch the people on the ground as well. When a dormer goes on there are neighbours looking, a driver walking about and somebody from the supplier calling round. Fence off the zone under your build, leave no tiles on the edge of the floor and work with tools on a cord. On a day as busy as that it is worth going through the rules that apply to work at height once more with everyone who is helping you.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for installing a dormer window

1

Ring the supplier of the dormer before you book the tower. He tells you where the crane will stand and which way the unit swings, and you match your pitch to that.

2

Chalk out where the wheels and the crane legs go the day before the lift. On the morning itself there is no time left to shift anything or to discuss it.

3

Take the bottom rows of tiles off before the crane arrives and stack them on pallets beside the build. That saves you a full hour on the morning itself, precisely when everyone is standing about waiting.

4

Ask your neighbours whether their car can stand elsewhere that morning. A crane on its legs and a tower on the pavement need more street between them than people expect.

5

Book your rental period with the crane day in the middle rather than at the start. If the supplier slips a day, your delivery and collection dates need no change at all.

6

Have a tarpaulin and a few battens lying ready on the floor. Should rain push the lift back after the tiles are already off, that cover needs to be within reach up there rather than shut in the shed.

Frequently asked questions

Frequently asked questions about installing a dormer window

Which mobile scaffold should you hire when the dormer comes by crane?+

The wide 135 cm version is the practical one here. Not because anything hangs off it, but because two of you stand on it and tiles, battens and tools end up there. Only where the route round the back is too narrow do you fall back on the 75 cm build. Before you hire a mobile scaffold, check with the supplier how high the box will sit on the roof, and you know at once which build height goes with it.

How do you combine hiring a scaffold with the day of the crane?+

Put the crane day in the diary as the fixed point and build the rental period around it. The tower arrives a few days earlier so you can erect it and prepare the roof slope, and it stays until the box is levelled and closed. That way the busiest day asks nothing of you but guiding. If the crane moves, you adjust your delivery and collection dates; that is easier than rescheduling the machine.

How many days should you rent a tower around installing a dormer?+

Work on three to five rental days. One day for building and lifting tiles, the crane day itself, then two or three days for levelling, fixing and weatherproofing. Have the whole job done by a firm and you need the scaffold for less, though there is usually plenty left to pick up yourself. Book a day too wide rather than too tight, because the crane date is not in your hands and moves more easily than your own diary.

What does hiring around a crane day cost, and do later days weigh heavily?+

The rental price follows from the build height and the model you choose, with bringing and fetching to your address on top. Everything stands including VAT on the page with rates, so you know the figure before you book. What counts on this job is that the days after the first weigh only a fraction. A period with slack around the crane therefore costs little extra and keeps you from standing there without a tower.

What working height do people hire for installing a dormer?+

Usually something between 8 and 12 metres. Measure from the ground the wheels will stand on up to the highest point of the box as it will sit on the roof, and remember that your hands come well above the floor you are standing on. Where the dormer is in a third storey you are at the upper end of that range. Ask the supplier for the height of the unit before you hire.

Can the scaffold be delivered on the same day as the dormer?+

Technically it can, but it is a poor plan. On the day the unit comes your street is already full of a lorry, a crane and its outriggers. On top of that you want the tower standing by then, not still lying on the pavement in sections. Have the parts brought two or three days earlier, build at your own pace, and use those days at once to get the roof slope ready.

Do you erect the scaffold, or do I hire it as loose parts?+

You get the tower as a set of loose parts and put it together yourself; erecting on site is not something we do. A manual comes with the delivery, and the instruction video shows the order step by step. With two of you a build of around ten metres takes half a day. Plan that half day well before the crane day, so nothing is outstanding when the lorry turns into the street.

What if the crane day moves and I want to hire the tower longer?+

That happens often on this job and is usually easy to arrange. Give us your new collection date and the scaffold stays as long as it is not booked for another customer. The reverse works too: if the lift is brought forward, you simply return it sooner. Hiring is the flexible part of your planning, while the crane and the supplier form the fixed part you work around. Pass a change on a day ahead if you can.

Can you lift a dormer with the mobile scaffold?+

No, definitely not. A tower is a working platform and not a lifting appliance; the floor is rated for people and tools. A complete unit belongs on the crane, and heavier loose sections are not something you hang from a hoist or a pulley on the guard rail either. What you do is pass small items up on a line and carry the rest up the climb. Use it as a floor and leave the lifting to the machine.

How much room do the crane and the scaffold need together in the street?+

More than you think. With its legs out the crane lorry often takes up two parking bays, and beside that you want the tower plus the spread of its stabilisers, plus a footway for pedestrians. In a narrow street that means talking to the council and to the neighbours. So set your build as close to the wall as you can, on the side the jib does not pass over. Measure that space a week ahead.

When do you get the deposit back after hiring around a crane day?+

You leave a deposit when you hire and you have it back inside a working day as soon as the returned set is counted through and nothing is short. On a busy site that is worth paying attention to: couplings and toe boards go missing among tiles, pallets and the packaging from the box. Lay the parts of the tower separately as soon as you start dismantling, and the count adds up at collection with nobody hunting about.

Can you keep the scaffold on hire after installing, for the finishing?+

Yes, and that is the usual course of things. The unit may be in place after the crane day, but the lead soakers, the zinc, the tiles and the sides still want days of attention. So extend your rental period at the booking by the days you need for it. A second delivery and a second build cost you more time and money than simply leaving the tower up for a few days longer.

Hire a mobile scaffold for installing a dormer window today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.