See your price
Application

Painting window frames? Choose the right scaffold.

Painting window frames is a job made of many short pitches. You take one frame, sand it back, mask the glass and lay on a covering coat with brush and small roller over a couple of rounds. For that you hire a narrow mobile scaffold you can shift along the elevation on your own, and you build it deliberately low, because here you want to stand beside the frame rather than above it. Below: which model suits, which build height is right and how many hire days a full round of frames asks.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting window frames we recommend the Narrow mobile scaffold.
  • For painting window frames the RS51 stands ready: 75 cm narrow, with a build that starts at 4.2 and stops at 6.2 metres.
  • Every frame gets its own pitch, so light weight and a slim footprint count for more here than a roomy platform.
  • Reckon on three to four hire days: primer, sanding between coats and two covering coats bring you past the same window again and again.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job4.2 to 6.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for painting window frames?

Safe, stable and professional work at height

On frame work your mobile scaffold stands still the moment there is paint on the brush, which is why it wants to be low and light here. The face you work on is not two metres wide and runs from bottom rail to head, and you want to see that whole face while you draw the brush along it. Anyone standing too high looks down on the top and misses the underside of the rebate. A ladder does not manage it: you need two hands and the window has to stay open for the rest of the day. Hiring a scaffold for painting window frames is therefore about a low build, little weight and a great many short pitches.

  • One frame per pitch, sill to head
  • Built low, because you work at frame level
  • Windows must stay open while the paint dries
  • Covering coats mean several rounds along the elevation
Read more about working safely →

Hiring a mobile scaffold of 75 cm for painting window frames

The RS51 is the model for this job: a narrow Altrex tower with a 75 cm platform that one person rolls along on their own. You do not pick that width out of necessity but because it makes the work faster. You have to get between the hedge and the brickwork, round a bay to the side elevation and, at many houses, through a gate to the back. On an elevation with eight frames you shift that tower dozens of times. The whole range is listed on the page about hiring a mobile scaffold.

Up on the platform width barely matters any more. A window frame is a narrow upright face that you stand square in front of with a brush, a small roller, a paint kettle and a sanding block, and you carry little else. What does count is the 245 cm length, because that covers a frame plus the brickwork beside it without repositioning halfway. Lay your materials along the guardrail on the wall side and the whole walking line across the platform stays clear.

Narrow 75 cm mobile scaffold beside a house, the pitch you shift sideways for every window frame you paint

Only when two decorators work the same elevation, or when timber and tools land on the platform beside the paint, does the 135 cm wide RS52 come into view. For brush work on your own you pay that roomier deck back at every passage: a garden gate, a side entry or the narrow strip past an extension turns awkward straight away. As a model the RS51 carries on to 14.2 metres, but for window frames you almost always order one of the lowest builds.

Which working height to hire when you work at frame level

The highest point of this job is the head of the topmost window, and on an ordinary terraced house that sits somewhere between 4 and 5 metres above street level. So here you order the build that stays between 4.2 and 6.2 metres of working height. Do the sum yourself: to the platform height you add roughly 2 metres of reach, the stretch that your arms and shoulders cover. Your deck therefore lands at something between 2.2 and 4.2 metres.

That is lower than the build you would take for work on the elevation itself, and that is the whole point here. At a gutter or a fascia you have to get your head above the work, while at a window frame you want the head rail at chest height and the sill somewhere near your knees. From that position you draw the stiles out downwards in one continuous stroke and you can see under the rebate, where paint collects. Which build suits shows at a build up to six metres.

Mobile scaffold built against a front elevation to window height, the low reach that suits painting window frames

You put the tape on the ground where the castors end up, not on your front doorstep. If the back garden sits a step below the patio, your whole build shifts down with it. Choose too tight and you stand under your work and lay the head rail off with your arms stretched above you, which shows up as runs and streaks along the glass. For windows on the first floor the second build is therefore nearly always the safe pick.

Where to stand the hired scaffold under a window frame

Under a window frame you rarely find an empty strip. A border runs along the wall, a water butt stands under the downpipe, or a bike rack is in the way. Stabilisers splay outwards from the tower and therefore ask for more room on four sides than the deck itself is wide, while you want the base tight against the wall to reach the rebate. Walk that strip before you book, and you know in advance at which window it gets tight.

Then you look at what lies under the castors. Paving and a drive give no trouble; loose garden soil that sinks after a shower does, and a path falling away towards the fence asks for sole boards. Put a sheet or a piece of card under the window you are working on, because brush work at height means spatter on the slabs and on the car parked behind you. For an uneven spot the piece on ground that is not level helps.

Splayed stabilisers at the foot of a mobile scaffold, the space you clear in the border under a window

The real choice on this job is how the tower sits relative to the opening casement. Do not put it square in front of the opening part but half a metre to one side, so the window can swing out without touching an upright. You need that for as long as the paint in the rebate is still soft, and in practice that lasts until late afternoon. Stand the scaffold wrong and you move it in the evening purely to shut your house.

How many days to hire a scaffold for painting window frames

A full round of window frames takes more time than most people budget, simply because you visit every window three or four times. Sanding and filling come first, then the primer, then a light sanding between coats and finally two covering coats. Each round you walk the elevation again and shift the tower at every window. On a front with six to eight frames you land on three to four hire days, and if the back goes in the same week, on about five.

Inside that period sit hours in which you can only wait. A fresh coat has to dry through before the next one goes on, and how long that takes you read off the tin of your own paint. The weather lays another layer over that: in full midday sun the paint skins too fast and your brush mark stays put, and on a damp morning with dew on the sills you start only once the glass has dried. Plan for the day you are certainly finished.

Mobile scaffold built along a side elevation, left standing while a coat of paint dries on the frames

Luckily the way the rate is built works in your favour. Only the first 24 hours carry the full amount, and every day you add behind it is discounted by 95 per cent. An extra day for a rain shower or a coat that still feels soft therefore costs next to nothing, while booking too tight means the van pulls up while half your elevation is still in primer. The amounts per model stand including VAT at our rental prices.

Which mobile scaffold suits painting window frames?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting window frames from the platform: one pitch per frame

A deck 245 cm long gives you a whole window frame plus some brickwork around it per pitch. Finish that frame completely before you move on: start with the opening casement while the window stands open, go to the head rail, then the stiles, and end at the sill where the paint sinks to. Push on to the next window halfway through and you will be back on the same spot later, having made a whole extra round with the scaffold.

Go up lightly loaded. A window frame barely asks half a litre of paint, so decant a small tin and leave the big one on the ground. Beyond that only a brush, a narrow roller, a sanding block, masking tape and a rag travel with you. Every item you forget means climbing down and up again, and with eight windows per coat that mounts up. Set your tin in the corner by an upright rather than in the middle of the deck, because turning on 75 cm goes wrong otherwise.

Built mobile scaffold with a 245 cm deck along an elevation, the pitch that holds one complete window frame

What most people misjudge is how often the tower has to move sideways. Eight frames in the front elevation give eight pitches per coat, and with a primer plus two covering coats you line up again more than twenty times along the same elevation. So lock the castors before you climb and clear the deck completely before you roll. If you later take on the upkeep of your window frames, more pitches get added on top.

Hiring a mobile scaffold delivered the day before sanding

What gets dropped off is a complete, counted set of loose parts that you build into a tower yourself. Decide in advance where that stack may go, because the strip under the windows stays clear for sheeting and nothing at all fits in the border. A drive or the grass beside the path suits it better than the pavement the neighbours walk along. Book on a working day and get your order in before 15:00, and everything is delivered the next working day.

The delivery day and the collection day you fill in yourself, and with decorating you want the delivery a day before your first sanding session. That way you build at your leisure, hold the height against the top window while you still can, and start straight away the next morning. Erecting it falls to you: the manual and the instruction video walk through the order, and half a day is enough when there are two of you. Count that half day in, because no paint gets touched then.

Delivery van with scaffold parts at the kerb by a house, dropped off a day before the frames are sanded

Once you are done we return for the parts, after you have dismantled the tower and stacked everything in one place. Wait with that until the last coat is hard enough, otherwise you are swinging tubes past fresh sills and damaging your own work. Count the parts as you set them down, and the set is guaranteed complete when the driver pulls up. What the transport costs there and back depends on the province you live in, and those amounts sit at the cost of delivery.

Painting window frames safely on a scaffold with open windows

Load class 3 under EN 1004 puts 200 kg per square metre on each platform. On frame work you normally stay well under that, because you carry little more than a tin of paint and some hand tools. If two of you climb up to lay off a large window together, and there is a bucket of water and a box of abrasives as well, that figure comes closer than expected. Spread the weight along the length in that case.

The basic rules hold, even on this relatively quiet job. Put the castors on the brake before you start up the ladder, never roll with a manned deck or with kit on board, and stop work as soon as a stiff wind gets up. That wind limit counts double here: an open window catches wind like a sail and slams against the guardrail or against your arm. So fix every opening casement on its stay and check the stabilisers after each move.

Erected tower in a narrow passage beside a brick wall, a loose sliding ladder against the wall, load class 3 throughout

The danger that belongs specifically to this job is the mix of paint, glass and an open window. Spilt paint makes the deck lethally slippery, so wipe a splash away at once instead of stepping round it all afternoon. Keep the zone under the platform clear of children and delivery drivers as well, because a brush or tin that slides off the guardrail lands right on the path to the front door. What else applies is written out at the safety rules for work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting window frames

1

Count the window frames in your elevation before you book. If you know there are eight, you also know you shift eight times per coat and how many hire days that realistically comes to.

2

Choose the position of the tower so the window can stay propped open outwards. Otherwise you drag the whole pitch aside at the end of the afternoon just to close one frame.

3

Mask the glass while you are already at that height and the scaffold has not moved yet. That way the preparation on each window costs you only one trip up.

4

Clip your paint kettle to the inside of the guardrail. On a deck only 75 cm wide you will kick over a kettle standing loose on the platform within the hour.

5

Take brushes and tins down as soon as you stop for the day. Material left on the deck blows over in the first gust and turns the platform under your feet greasy.

6

Pin your collection date a day behind your last gloss coat. That leaves a morning for stripping tape and sheeting, and you dismantle the tower dry and complete instead of in a hurry.

Frequently asked questions

Frequently asked questions about painting window frames

Which mobile scaffold to hire for painting window frames?+

Take the RS51 from the hire fleet, the mobile scaffold 75 cm wide. Because you set up again at every window you want a tower you can move on your own, and then weight and width count for more than a roomy deck. On top of that 75 cm still passes a gate and slips between a hedge and the wall to the back. Painting in pairs, or replacing timber as well? Then rent the wider RS52 instead.

How does hiring a mobile scaffold for painting window frames work?+

Online you choose a model, set the build height, pin your own delivery and collection day and pay a fixed amount including VAT in advance. After that the set is dropped off, you build the mobile scaffold, and you work the windows coat by coat; on your last day you hand the parts back complete and dismantled. The only thing that really needs thought is how many days your paint needs, because that decides the hire period.

How many hire days does a full round of window frames take?+

For an elevation with six to eight windows you are on three to four hire days. You walk that elevation several times over: sanding and filling, primer, sanding between coats and then two covering coats. Take the back in the same period and it moves towards five days. Do only the two windows of a dormer or a single fanlight and one day of hire with half a day of slack behind it will do.

What does it cost to rent a mobile scaffold for several days of frame work?+

The rental price follows from the model you pick and the height you have the tower built to, plus the transport to your province. For this job the way the days stack up is the friendly part: day one counts in full, and what you put behind it hardly registers. Because painting window frames always spreads over several drying rounds, a generous booking works out cheaper than two separate short periods.

Which working height should I hire for frames on the first floor?+

For windows a floor up you land on a build between 4.2 and 6.2 metres. You measure from the ground under the castors to the head of the highest frame, leaving the gutter out of it, because that belongs to another job. The overview of working heights shows which platform height goes with which build, so you do not book metres of scaffold you then stand on unused for the whole hire period.

Does delivery come with the hire, or do you collect the scaffold yourself?+

That is yours to decide, and here it mainly changes convenience. Have it delivered and the mobile scaffold is ready on the morning you pinned, and it goes back after your last gloss coat, at a rate fixed per province. If you would rather drive: collecting it yourself is free, by appointment at Zeeburgerpad 89 in Amsterdam, and you take the parts with you. For decorating over several days most people still choose delivery.

Is putting the tower up included in the hire for decorating?+

Assembly stays your task with this kind of rental. Our driver sets the parts down and comes back for them afterwards, but putting the mobile scaffold together is something you do yourself, with the supplied instructions and the video beside you. Two people manage that in half a day, and the pitch then stands lined up beside your first window frame. You will find no facade scaffolds, system scaffolds or cherry pickers in this range.

Can I hire for longer if the decorating overruns?+

Report the overrun as soon as it shows up and we move the collection day, unless that particular tower is already promised to the next customer. With window frames it overruns regularly, because drying times and weather decide when the next coat may go on and a soft coat will not take another. Want that risk gone? Book an extra day straight away. Bringing it back early is fine too if you finish unexpectedly fast.

How much clear space does the pitch need under a window frame?+

Add the splay of the four stabilisers to the 75 cm of the tower, and put the strip for sheeting under the window beside that. In practice you want a couple of metres of flat, free ground under every frame. If there is a border, a water butt or a bike rack there, clear it before the mobile scaffold arrives, otherwise you spend half an hour shuffling at every window.

What do you do with your hire days if it starts to rain?+

The mobile scaffold simply stays where it is; you only postpone the gloss. Exterior paint will not take rain on a fresh coat, and with dew on the sills you start once the glass has dried off. Those hours you use for sanding, filling or getting tape on, which under an overhang usually carries on fine. Because you fill in the end date yourself, a postponed morning normally costs no more than one extra day.

How does the deposit work when you come to hire a mobile scaffold?+

A deposit belongs to your booking. Once the returned set has been counted back in, that amount is refunded within 1 working day. Two things matter with decorating: you hand in every part you received, and there is no dried gloss on the deck or on the tubes of the mobile scaffold. Lay a sheet of card under your paint kettle and keep a rag to hand, and no tower needs scrubbing at the end.

Must the window be able to stay open with the scaffold in front of it?+

Yes, and you take that into account when you set out your hire period. A freshly glossed rebate must not fall shut, so the opening part has to stay open for the rest of the day. Place the mobile scaffold slightly off the centre of the frame, so the casement swings out past the upright and hangs on its stay. Skip that step and the tower has to move aside in the evening.

Hire a mobile scaffold for painting window frames today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.