See your price
Application

Window frame maintenance? Choose the right scaffold.

Window frame maintenance is not a morning's work but a round of the whole house. You go past every window, check the sealant joint, grease the hinges, adjust the locks and touch in the spots where the paint has split open. On the ground floor that goes from ground level, but the upper storey asks for a build you can shift easily. So you hire a slim RS51 of 75 cm, one you push about single handed, put up to somewhere between 6 and 8 metres.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For window frame maintenance we recommend the Narrow mobile scaffold.
  • For a maintenance round past every window frame of a house you hire the slim Altrex RS51, 75 cm wide.
  • Take a reach of 6 to 8 metres, measured up to the highest window frame you include in the round.
  • Reckon on two to three hire days, since you reposition at every window and work the whole eaves line as well.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for window frame maintenance?

Safe, stable and professional work at height

With window frame maintenance the problem is not the height but the number of times you have to set up again. A house soon has ten to fourteen windows, and each one takes half an hour of sealant, hinges and a touch of paint. That means ten to fourteen standing places, right round the building, over pavement, grass and terrace. Hiring a mobile scaffold to maintain window frames is therefore above all a choice for a model you can move single handed and that comes through the gate to the back garden. The height follows by itself from the highest window in your round, usually a loft light or a fanlight.

  • Ten to fourteen windows in one fixed round
  • Short work per window, but setting up each time
  • Small tools for sealant, paint and ironmongery
  • A dry spell in late spring or late summer
Read more about working safely →

Which mobile scaffold to hire for a round of window frames

The model you want here is the Altrex RS51, 75 cm wide. On this job what counts most is how often you set it down again, and on an average house that is more than ten times. A slim build you push over the garden path on your own, tilt past a shed and take through the gate to the back without dismantling anything. Base sizes and part counts per model are listed with the mobile scaffolds we hire out.

What goes up with you in maintenance is light but numerous: a sealant gun with cartridges, a sealant knife, degreaser and cloths, a can of lubricant, a screwdriver set for the locks, abrasive paper and a tin of paint with a brush. All of that fits in a bucket or a tool bag, and that is exactly why you need no wide deck. You do want to stand everything upright, because a toppled sealant gun on an aluminium platform is a tiresome clean up you meet again at handing back.

Slim mobile scaffold along the wall of a dwelling, the build you move on window by window during a round

A wide model of 135 cm adds little here and even works against you. Every move needs more clearance, and along a garden path sixty centimetres across you simply will not get by. Only if two of you work the same window frame at once, or you start sanding and painting larger areas, does that extra deck become interesting. The sizes of both versions sit side by side in the overview of dimensions per mobile scaffold.

Which working height to hire for the highest window frame

Base your build on the highest window in the round, not on the average one. If there is a loft light or a fanlight above the front door, that decides your choice, even though it is only one of fourteen. With two storeys and a roof above them you almost always end up between 6 and 8 metres. On top of your platform height comes a reach of roughly 2 metres, so the deck sits lower than the window frame itself.

Measure each elevation separately, because the ground under the castors differs all round the house. At the street side you stand on flat paving, at the back perhaps on a terrace a step lower, and at the side on a path that falls away. The same window therefore asks a slightly different build per standing place. Reserve on the least favourable of those readings, since a build falling just short at the back cannot be helped by any trick. What that choice yields is set out under working at eight metres.

Mobile scaffold standing before the windows of a front elevation, the reach that still gets you to the highest frame

Pitching too low takes its revenge in maintenance especially. Sealant work asks that you see the joint square on, or you will draw a bead that looks crooked from below. Adjusting a lock is done with a screwdriver at eye level, not with your arms above your head. And the head of the frame is precisely where water stands, so that is the part you certainly want to reach. Fall just short there and in practice you skip the most important piece.

Hiring a mobile scaffold and repositioning at every window

On this job you have not one standing place but a series. Walk right round the house before the material comes and settle per window where the build will go. Number the windows with a piece of chalk or on a note and work them in that order, so you never have to go the same way twice. On an average house that easily saves you an hour of pushing to and fro along the garden path, and that hour is otherwise simply hidden in your hire days.

The ground changes from place to place, and that is the real work here. On paving you roll straight on, on grass a castor sinks in as soon as it has rained, and on a gravel path you cannot get the stabilisers level. Lay a few paving slabs or thick boards ready for the soft spots and carry them round with you. Look as well at what stands against the wall: a water butt, an outside tap, a low hedge or a shed roof that comes out just under the window.

Stabilisers folded out beneath an erected mobile scaffold, reset tight at each window during a maintenance round

At every new standing place fold the four stabilisers out again and set them tight, even if you are only twenty minutes at that window. It is exactly the temptation to skip that on short stops which makes this job risky. Levelling a build on a sloping or uneven path is described step by step in the explanation about uneven surfaces, and on a round of the whole house you meet that at nearly every window you stop at.

How many hire days maintaining all the window frames takes

Count your hire days on the number of windows upstairs, not on the size of your house. Per window frame you are half an hour to three quarters busy with sealant, locks and a touched in patch, and to that comes ten minutes of moving every time. Eight windows on the upper floor thereby fill a whole day, and with the eaves line and a second coat of paint added you arrive at two to three days with the mobile scaffold standing at your place.

There is waiting time in it as well, though less than with repair work. Fresh sealant has to skin over before you take a brush past it, and touched in patches want to be dry before the second coat. That means coming back at the end of the day to the windows you began at that morning. Plan that second round inside your hire period and not on the day the material is being collected, or you end up choosing between rushing and skipping.

Erected scaffold with platform and guard rail, as it stands at the house through several days of maintenance

Reserving an extra day costs little with this hire. Only the first twenty four hours count for the full rate; from the second day onwards a discount of 95 per cent runs on everything you add. With a maintenance round that hangs on the weather that is pleasant, because you need not gamble on four dry days in a row and can let a wet afternoon go by. What others allow for a job like this is set out in the article about how long people keep a build.

Which mobile scaffold suits window frame maintenance?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Sealant, hinges and locks checked from the scaffold deck

Work a fixed order per window frame and you forget nothing and need not come back. Start with cleaning and degreasing, then go round the sealant joint against the glass and the brickwork, cut loose sections away and gun in fresh. Move on to the ironmongery next: grease the hinges, adjust the keeps, tighten the screws. Finish with sanding and touching in the places where the paint has sprung open. Every standing place then lasts about as long and you know by midday how many windows you will still reach.

A deck 245 cm long puts a whole ordinary window before you and brings both top corners within reach without stretching. At a wide frame, or a pair of windows next to each other, you sometimes take two in one position, and that saves a move straight away. Look at that when you lay out your round: two narrow bedroom windows close together form one standing place and not two. Over fourteen windows that quickly saves three moves.

Erected tower against the side wall of a house, where sealant joints and window catches are gone over

Take everything up in one go and hang the sealant gun on the guard rail instead of laying it down. What people misjudge is the number of small things they forget on the way: a spare cartridge, a clean cloth, the right screw for a keep. Climbing down each time costs a few minutes and over fourteen windows that mounts to half a day. If you are going to paint the window frames as well, that becomes a planning of its own.

Hiring a mobile scaffold delivered at the start of your round

You receive the material as a complete, counted set of loose parts which you put together yourself. We come to build nothing and never deliver an erected frame; instructions come with the set and a video online follows the same order. Allow about an hour for it with two of you. Do that at the start of your first maintenance day, or better still the evening before, so the morning goes on actually starting at the window frames.

Fix your reservation on a working day with 15:00 still ahead of you, and the following working day becomes the delivery day. Which dates those are you decide, for the bringing as well as the fetching, and with maintenance you pick them on the forecast: sealant and paint want dry weather and a temperature that is not too low, so a round in late spring or late summer beats an attempt in November. Living nearby, you collect the set free of charge by appointment on the Zeeburgerpad in Amsterdam.

Van with scaffold material parked at a house, the delivery you plan at the start of a maintenance week

Work out beforehand where the bundles may lie at the delivery. On this job you walk right round the house, so do not put them hard against the elevation where you begin but on the drive or in the front garden, out of your own walking route. Afterwards you strike the mobile scaffold and we load the material again. Reckon the transport into your budget: every province has its own fixed amount for bringing plus fetching, which you find on the page with rates for delivery and collection.

Working safely with sealant and paint on a hired tower

Every square metre of the platform is rated for 200 kg, precisely what load class 3 within EN 1004 prescribes. Maintaining window frames keeps you well under it, since you carry only small tools and a few cartridges. The risk here lies elsewhere: at twelve moves in a day the checking becomes a routine you start skipping at some point. So run through the same list at every new standing place before you climb on, however short the work at that one window.

Lock the castors as soon as your foot is on the first rung and keep them locked until you are back on the ground. Never travel with tools or with somebody on the platform, not even to that one window further along, because it is precisely on short moves that this goes wrong. If it blows hard, put the painting off: the brush is taken out of your hand and dust sticks in the wet layer. The remaining rules are gathered in the article on safe work at height.

Erected tower in a narrow passage with a loose ladder alongside, the 245 cm build you reposition a dozen times a day

Sealant and paint make your platform slippery, and on this job that is the danger people underrate. A drop of silicone under your sole feels like ice on aluminium. Wipe spilled sealant away at once, lay a cloth under your tin of paint and stand the tin in a bucket so it cannot go over. Think of who walks below as well: at windows above a terrace or a path you fence that strip off for as long as you are working overhead.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for window frame maintenance

1

Number all the windows on a small plan before the material arrives and work them off in a circle. Without that order you will push the build along the same elevation twice, and you notice it in your hire days.

2

Cut the old sealant loose on the day before you gun in the new. The joint can dry out then and your fresh bead bonds to a dry surface instead of to moisture still sitting in it.

3

Clear the drainage slots at the bottom of the frames while you are standing there anyway. Blocked slots are a leading reason you come back here in a few years with rot and have to hire again.

4

Take two cartridges per elevation up with you rather than one. The second is nearly always needed, and otherwise you are climbing down at the third window for stock you could have carried.

5

Slide a piece of sheeting under your paint tin and sealant gun before you set them on the platform. At the end of your hire period you roll that up and no dried sealant is left on the deck sections.

6

Plan your maintenance round in a spell that is dry and not too cold. Sealant and paint need that, and it spares you hire days on which you stand about doing nothing but waiting.

Frequently asked questions

Frequently asked questions about window frame maintenance

Which mobile scaffold do people hire for a service of their window frames?+

Almost always the RS51 at 75 cm wide. On this job you shift the build ten times or more, and then what counts is whether you can move it alone and whether it goes through the gate to the back garden. The tools you take up are small, so a wide deck gains you nothing. Only when two people work the same window at once is the broader 135 cm version worth the hire.

How do you go about hiring a scaffold for a round of window frames?+

You choose the version online with the build height belonging to it, pin a day for the material to arrive and a day for it to be fetched, and pay a fixed rate including VAT in advance. The counted bundles are delivered at your home. After that you put the mobile scaffold up and work your round off past every window, from front elevation to back. At the end you strike it and we load everything again.

For how many days do people hire a mobile scaffold for this round?+

Allow two to three days for an average house with eight to fourteen windows. Per window frame you spend half an hour to three quarters on sealant, ironmongery and touching in, plus the time to move along. Taking the eaves edges and a second coat as well, add a day. Because you fill in your own end date when hiring, you can put that margin in from the start and hand back sooner if it goes quickly.

What does hiring a mobile scaffold for window frame maintenance cost?+

That follows from the version and the build height you choose, with the transport to your address on top. Every amount is shown inclusive of VAT in our overview of rental prices. For a job that comes round each year it is useful to know that the opening day carries the weight of the bill while the days behind it run on for a fraction. Anyone repeating the same round yearly hires a little generously in one go rather than in two separate blocks.

Which working height do you hire if a loft window is included?+

Look at the highest frame in your round and measure to that, even if it is a single window. With two storeys and a roof you usually come out at 6 to 8 metres, and that is the build you fix when hiring. Measure per elevation, because a terrace round the back often sits a step below the paving out front. On the page with working heights you see exactly what each build reaches in practice.

Should the hired scaffold arrive on my first working day?+

It may, but the evening before is smarter. You need an hour to put the mobile scaffold up and that otherwise comes off your first working morning. You pin the delivery date yourself, so set it a day before you start. Collecting it in person is fine too, by appointment and without extra charge. If your round runs over several days, most people have it brought, simply because the material stays there all week anyway.

Does assembly belong to the hire of a mobile scaffold for this?+

Putting it up and taking it apart again are yours. We drive the parts to you as a complete set and pick them up after your last maintenance day, but we assemble nothing and never deliver it erected. The set holds a manual giving you exactly the right order; with two people it takes about an hour. A facade scaffold or a cherry picker is not in our range, so for this round the mobile scaffold is the tool.

What if the round overruns and you want to hire for longer?+

Give us word in time and the collection date is pushed back, provided nobody else is waiting for that set. With maintenance the overrun usually comes from discovering at the third window that more sealant is loose than you thought, or from a painting day washed out. You determine your own end date, so you can take that room at the reservation as well. If the round runs smoothly, the mobile scaffold may go back earlier.

How much clear space does each standing place of the hired build need?+

Per window you need the base size of the frame plus the spread of the stabilisers, which comes down to a level strip a few metres wide under each window frame. Walk your route in advance and clear the water butt, the planters or the bike rack away per standing place. An obstacle you leave at the first window still costs you a quarter of an hour at the seventh, while you are up on the mobile scaffold with a sealant gun in your hand.

When is the best time to hire a mobile scaffold for this service?+

Late spring and late summer work best. Sealant and paint ask for a dry surface and a temperature that is not too low, and you do not want a shower washing your fresh bead away. In winter you can hire perfectly well for checking and for ironmongery, but the sealing and painting are better put off. Plan your round in a week whose forecast shows a few dry days in a row, and every hire day yields most.

When do you get the deposit back if you hire a scaffold for this?+

The deposit you pay up front is released again once the returned set has been counted through, and it lands with you inside a working day. With window frame maintenance it usually goes wrong with sealant and paint: dried silicone on a deck section will not come off again. Lay a cloth or a sheet where you put your material and wipe spills away at once. What else applies around hire and handing in is in the piece on the deposit afterwards.

Can you use the same hire period to go over the gutter too?+

That is a sensible combination. With this build you already stand just under the gutter, so scooping and flushing costs you ten minutes extra per standing place at most. Take it along in the same round and keep the same numbering of the elevations. Do allow half a hire day more, because a gutter asks for water and buckets and that works more slowly than a sealant gun. More about it is at gutter maintenance with a mobile scaffold.

Hire a mobile scaffold for window frame maintenance today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.