See your price
Application

Maintaining a gutter? Choose the right scaffold.

The yearly service on your gutter is more than a quick look. Leaves and moss come out, the trough is flushed through until the water runs away at the outlet again, and along the way you check every bracket and every joint. That work runs the full length, so you shift a slim mobile scaffold along bit by bit. With a gutter four to six metres up you book a reach of 6 to 8 metres and a period of a few days.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For maintaining a gutter we recommend the Narrow mobile scaffold.
  • For gutter maintenance you take the slim build, 75 cm wide, that reaches up to 6 to 8 metres.
  • You go up with a bucket, a scoop and a hose and move along the whole elevation, outlet to end stop.
  • Two or three days of hire works better than one, since flushing and adjusting brackets take longer than you think.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for maintaining a gutter?

Safe, stable and professional work at height

On gutter maintenance the build sets your working pace. You empty a length, flush it after, check that the water runs on properly and then shift to the next length. You repeat that ten or twelve times along the elevation, every time with a bucket of wet mess in your hand. That does not work on a ladder: you need both hands and you have to be able to put something down. Renting a slim mobile scaffold gives you a stable floor at every stopping point where the bucket and the hose can go, and from which you reach into the trough without stretching. That saves time and your back by the end of the day.

  • Somewhere to put the bucket and the hose
  • Reach into the trough without stretching out
  • Shift along the full length of the gutter
  • Reach of 6 to 8 metres at a terraced house
Read more about working safely →

Hiring a mobile scaffold for gutter maintenance: which size works

For the gutter service the slim build of 75 cm is the practical choice, the RS51 at Altrex. You need no workbench up there, but you do need somewhere for the bucket, a hand scoop, a brush and the end of the garden hose. All of that fits easily on a slim floor of 75 cm. More important is that you can roll it on your own, because on this job you are shifting all day. A heavy build that only moves with two people makes the work needlessly slow.

There is another reason to stay slim. Along the wall at most houses lie borders, tiled paths and sometimes a strip of gravel less than a metre across. At 75 cm wide you drive between all of that without first flattening the planting. Take the wide build of 135 cm and you are levering it round every corner, and on the back half of the elevation you may not get through at all, while that is precisely where a gutter fills up soonest.

Slim tower built up along a house, the build you keep shifting on during the yearly gutter service

Wider only becomes interesting when the maintenance runs on into replacement or into painting, because then boards, paint or new gutter sections go up with you and you suddenly do need a work surface. If it stays at scooping out and flushing through, you are dragging those extra frames through the garden for nothing. To see the builds beside one another before you commit, look at the mobile scaffolds available to hire and pay attention above all to the width of your garden path.

Which working height to hire to clean out the gutter

What decides the height here is not the roof edge but the bottom of the trough, because you have to get your hand into it. At a terraced house with one storey the gutter hangs somewhere between four and six metres. What you fill in when you hire a mobile scaffold is called the working height: take the height of your floor and add the 2 metres or so your arms still cover. For this job that comes to a reach of 6 to 8 metres.

Set your stand so that your floor comes just under the gutter and you look comfortably over it. Stay too low and you scoop with your arms stretched above your head, and everything you lift out lands on your face. Stand too high and you stoop over the rim all day. You only notice that difference after an hour of scraping, and by then it is awkward to correct, because you would have to take the build apart for it.

Tower along a front elevation with the platform just below the gutter, the stand for emptying the trough

Begin your measurement at the ground the castors will rest on. A back garden that falls towards the fence, or a raised terrace, changes your starting point by half a metre without you noticing until you are up there. If you pass a dormer or a projecting bay on the way, add a little in advance. On the page about a reach of 8 metres you see which builds belong to it and what floor height you get.

Where the tower goes during the yearly gutter service

Unlike a repair you are not standing in one place here but at ten or twelve places in a row, spread over the whole elevation. So the requirement is not that there is a flat patch somewhere, but that the entire strip along the house is passable from end to end. Walk it once beforehand with a bucket in your hand: can you roll there, do the castors stand steady everywhere, is there a lip or a step you cannot get over?

Grass deserves attention on this job. Maintenance is usually autumn work and the garden is wet then; a lawn that still looked firm in September is soft by November. Lay slabs or boards down at the places where you stay a while, and check at every stopping point again that the stabiliser legs stand firmly enough before the first person climbs up. How you solve that on soft or sloping ground is explained under working on uneven ground.

Loose parts of a tower laid out on a lawn, the sort of ground that goes soft in autumn

Think about the water as well. When you flush through, a fair amount comes out of the outlet or, if there is a blockage, over the rim and down. So do not put your build right above a terrace full of garden furniture, and take the neighbours into account where the boundary sits close to the wall. Make sure too that the garden hose does not run under a castor or over a stabiliser leg, because you will trip over it at the fifth stopping point.

How many days to rent a tower for gutter maintenance

Count on two to three days of hire for this job. The scooping itself goes quickly, but more comes with each stopping point than you expect: first the coarse material out, then the bottom clean, then flushing, then checking whether it drains and if not, prising the outlet free. Do that ten or twelve times along an elevation and your first day is gone. Want the front and the back of the house, and you are certainly into a second day, plus the assembly time.

There are waiting moments in it as well. A blocked rainwater pipe does not always come free in five minutes, and a bracket you want to reset sometimes calls for a screw or a plug you turn out not to have in the house. The weather plays its part too, since this is autumn work and an afternoon of hard wind or steady rain simply comes off your plan. Book a single day and you spend the back elevation watching the clock instead of the gutter.

Frames leaning against brickwork beside a cargo bike, the hire set that comes and goes within two or three days

For your reservation that means: choose the period on the generous side rather than to the minute. You fix the start and end dates yourself and you may always hand the tower back early, so planning an extra day costs you no more than some arithmetic at the kitchen table. How the rates work per model and per height you can check on the page listing every rental price before you settle on a date.

Which mobile scaffold suits maintaining a gutter?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Scooping and flushing the gutter from the platform

A floor 245 cm long puts a good two metres of gutter in reach at each stopping point. Finish that length completely before you shift on: coarse material into the bucket, scrape the bottom after, rinse with the hose and check that the water runs off the right way. Work from the far end towards the outlet, then everything you loosen goes that way of its own accord and you do not pass the same stretch twice.

Here lies the difference from plain cleaning. On a cleaning round you empty the gutter and you are done; on maintenance you then go along every bracket, every end stop and every joint as well, with a bucket of wet leaves and a hose on your floor. That makes shifting more awkward, because those things have to come down first. So empty the bucket at every move, even when it is not yet full, and reel in a length of hose before you release the castors.

Erected tower along a side wall at gutter height, the working stand in which you empty and rinse the trough

Go along the fixings while you flush, because that is where you see the first problems coming. A bracket that gives, a screw working its way out or a length of gutter visibly sagging belongs in your notes. Tightening a bracket a little you can do on the spot, but if the gutter really hangs crooked that is a separate job with its own material and its own days. For repairing a leaking gutter you book other days and sometimes a wider build.

Hiring a mobile scaffold with delivery for the autumn service

The build arrives as a set of loose parts that was counted before it left. Decide beforehand where those parts may lie: on the drive, in the front garden or just behind the gate, but in any case not on the strip you will be rolling the castors along. On working days 15:00 counts as the last order time; everything that comes in before that we deliver to your home the next working day. For autumn work that is pleasant, because you can still jump onto a dry week fairly late.

The day of arrival and the day everything goes away again you choose yourself. Let the set land the day before you actually start, so the build already stands and your morning begins up in the gutter rather than down among frames. If a storm is in the forecast, move that date a few days rather than working on at half strength; a gutter service is not going anywhere, and the tower stands just as well next week.

Delivery van at a house with the scaffold set aboard, timed for the day before the gutter service

After the last stopping point you take the build apart and set the parts stacked somewhere the van can reach, after which we remove them again. Rinse the deck boards off before you stack, because wet leaves and mud dry rock hard otherwise. Run through the count while stacking, so you can be sure the whole set travels back. Which amount applies for bringing and collecting in your own province you can read with the cost of delivery.

Working safely with water and mud on the scaffold

A floor in load class 3 of EN 1004 may be loaded with two hundred kilos per square metre. Maintaining a gutter you will not reach that, not even with a full bucket of wet leaves along. It is still worth knowing, because on this job people sometimes take a second person and a tool box up with them. Stay inside that limit and you have plenty in hand; the real risk on this work lies somewhere else.

Namely in the water. A floor you are standing on with a hose becomes slippery, certainly with mud underneath. So sweep the deck clean now and then and watch your soles when you get on the ladder. The fixed rules stay in place as well: brake the castors before you climb, never roll the build with things or people on it, and do not come up in a hard wind, which in autumn happens more often than you would like.

Tower with a guard rail edge and an inside ladder, the climb that turns slippery on wet gutter work

Finally, watch what goes down. A bucket you lower on a line is fine, a bucket you empty from five metres up is not: wet leaves arrive with some force and from above you cannot see who is walking below. Keep the strip under the build clear and agree that clearly with anyone else busy in the garden. Send a warning down before anything drops, and never let a passer by walk under the tower. More rules are set out under working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for maintaining a gutter

1

Work from the far end towards the outlet. Everything you rinse loose then goes the right way, and afterwards you do not have to pass stretches you had already finished.

2

Hang the bucket on a hook inside the guard rail instead of standing it on the floor. Your walking room then stays free and you do not kick your whole load over when you turn.

3

Do the gutter service only once the trees nearby are bare. Clear up in October and the gutter is full again by December, and you need a tower twice in one season.

4

Take a piece of wire or a long screwdriver up to poke the outlet through. Climbing down again for that one action costs you a good ten minutes per stopping point.

5

Hose the deck boards down before you start dismantling. Mud that has dried on stays put, and you do not want to discover that at the moment the set is collected.

6

Run the garden hose down along the build in a generous loop. If it lies tight or under a castor, it pulls at your arm or snags at every move.

Frequently asked questions

Frequently asked questions about maintaining a gutter

Which mobile scaffold do people hire for maintaining their gutter?+

In practice nearly always the slim build of 75 cm wide. You need little space up there, but you do need to be able to roll on your own, and that is simpler with a light build. That width also gets you past borders and narrow garden paths where a wide version jams. Only hire wider when you combine the gutter service with painting or with replacing sections, because then material really does have to go up.

How does hiring a scaffold for the gutter service run from start to finish?+

You choose a model and a height range online, state when the parts should arrive and when they may go, and pay a fixed amount with VAT included. On the chosen date the parts stand at your house. You build up, work the elevation, take it down again and stack the parts. Not much more comes with hiring a tower for this job, apart from deciding your stopping points in advance.

How long should the hire period be for a gutter service?+

Two to three days is realistic for a house where you do both the front and the back. A single elevation fits inside a day, but then building up and taking down already runs off with a good part of your hours. Run into a blocked outlet or loose brackets and you are half a day further on. Booking generously prevents you having to stop halfway because the van is coming for the tower.

What do you pay for the hire, and what happens on the second and third day?+

Your rental price depends on the model and the height, with a fixed amount for transport in your province alongside it, all including VAT and visible in advance. On a gutter service that works out well, because only the first twenty four hours are paid in full and every day after that carries 95 per cent off. Three days of hire therefore comes close to what a single day would cost you.

Which working height do you hire for a gutter at five metres?+

Then your reservation says a mobile scaffold reaching 6 to 8 metres. Make sure your floor ends just under the trough, so you can look in and scoop without stretching or bending deeply. Measure from the ground the castors will rest on, because a sloping garden changes that starting point. Which build you get at which reach, and how high your floor then comes, you see on the page with the available working heights.

Can you have the scaffold delivered on a dry day when you hire?+

Yes, and with autumn work that is the smartest move. You give the delivery day yourself and it may still shift shortly beforehand if the forecast turns. As long as you pass on what you need in good time, the mobile scaffold is at your kerb quickly. If you would rather not wait and have transport yourself, you can collect the set free of charge by appointment in Amsterdam. For this height that is a manageable load.

Do I have to put the tower up myself if I hire it for this job?+

Yes, building up and taking down belong to your work. A written manual is included and an instruction film shows the order of assembly, so even without experience two people manage it fine. Allow half a day for that, preferably on the day before you start. We only arrange the bringing and the removing of the set. Anyone who would rather build nothing at all is better off with a scaffolding firm; cherry pickers, system scaffolds and facade scaffolds we do not hire out.

What if the gutter service overruns and I want to hire longer?+

That is usually no problem: let us know that you need the mobile scaffold for longer and we move the pick up day, as long as it has not been promised elsewhere. On this job it often overruns because of a blockage, or because the back elevation turns out to have caught more leaves than the front. So book an extra day straight away. Handing back earlier than you stated is always allowed.

How much room has to be free at the spots where you hire and build?+

At every stopping point you need the footprint of the mobile scaffold plus the spread of the stabiliser legs, in practice about two by two metres of level ground. Because you shift along the whole elevation, that requirement holds over its full length and not only by the front door. So move garden furniture, plant pots and the water butt aside beforehand. Make sure as well that you can reach the outside tap, because without a hose flushing becomes a matter of carrying buckets.

Can you maintain the gutter if it rains during your hire period?+

Rain matters less on flushing work than on painting, but a wet floor on the tower turns slippery and with wind on top you do not go up. A light shower need not stand in your way; an autumn gale certainly does. Since the return date is yours to set, you simply push everything a day along. Use such a day to clear the drain down by the gully or to lay your tools out for the next morning.

How does the deposit work on a gutter hire like this?+

You pay a deposit with the reservation and it is back on your account within one working day after handing in, as soon as the set has been counted. On a gutter service dirt is the point to watch: mud and wet leaves on the deck boards dry rock hard if you leave them. Rinse the parts off at the end of your last day of hire and that is solved. How the settlement runs exactly is explained in the notes on getting a deposit back after handing in.

Why do you hire for longer on maintenance than for inspecting the gutter?+

Because on an inspection you only look and on maintenance you are working. An inspection round is a matter of standing still six times, looking and noting, done in a day. On the service you scoop out, flush through, poke an outlet clear and reset brackets, with a bucket and a hose on the floor. That asks for more stopping points, more handling per length and so simply a longer hire period for your tower.

Hire a mobile scaffold for maintaining a gutter today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.