See your price
Application

Repairing a gutter? Choose the right scaffold.

Repairing a gutter is usually work in one place: a seam that leaks, a hairline crack, a bracket pulled loose. That keeps the job short but not easy, because you have to stand exactly at that point with tools and work there calmly. If the gutter sits at five to six metres, you hire a mobile scaffold in a narrow build reaching six to eight metres of working height. Below you find which model that is, how many rental days are realistic and how to get the position right under the leak.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For repairing a gutter we recommend the Narrow mobile scaffold.
  • With a leak or a loose bracket you hire the narrow RS51 and set it in a single position under the leak.
  • Two rental days are enough: half a day building, then the repair and the time sealant or solder needs to cure.
  • The place of the leak fixes where the tower stands, even if that means standing in a border or beside an extension.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for repairing a gutter?

Safe, stable and professional work at height

A gutter repair is small in size and large in precision. You dry and clean a length of channel, you take old material away and you put something new on that has to stay watertight. That only comes off if you stand still at working height, with your tools within reach and without hanging one armed from anything. Hiring a mobile scaffold to repair a gutter therefore comes down to one thing: being able to stand exactly at that point, even when the point sits above a shed or a full flower border. That you need it only briefly makes the choice easier, because you build once and rarely move.

  • One position, right under the leaking point
  • Tools within reach on the working deck
  • Working height six to eight metres for repairs
  • Short hire, often just one or two days
Read more about working safely →

Hiring a mobile scaffold for a gutter repair: why narrow wins

The usual model for this work is the RS51, at Altrex the RS TOWER 51. It measures 75 cm across and comes in builds between 4.2 and 14.2 metres of working height. On a repair that slim measurement counts for a different reason than on painting: you will not wheel it far, but you do have to fit it into one specific spot, and that is often a corner between a shed and the boundary. The full range sits on the page about mobile scaffolds available for hire.

What you need up top is not room to walk but room to put things down. A deck of 245 cm holds a tool box, a roll of repair tape, a cloth and a bucket for the muck that comes out of the channel. That way you need not climb down during the work, and that is exactly where a repair stalls: every trip down for a pair of pliers or a screw costs you a quarter of an hour.

Narrow mobile scaffold set against a wall, the single position in which a leaking gutter gets repaired

Working in a pair with heavier material going up, say a replacement length of gutter lining or a complete set of brackets, the wider RS52 at 135 cm is pleasanter. For a single seam or one loosened bracket that is overkill. If the leak lies in the gutter of an extension about four metres up, the compact one person MiTower often does, reaching 6.2 metres of working height and going up quite easily on your own.

Repairing a gutter: which working height to hire for the leak

On this job the highest point is not the roof edge but the gutter bottom where the leak sits, and you want to see over it without stretching. The rule of thumb stays simple: the deck you stand on plus about 2 metres for what your arms cover gives the working height that goes on the booking. With the channel at five to six metres you are right with six to eight. Which build belongs to that you can check through the overview of working heights.

Find out where the leak actually is before you pick a height. A trickle mark on the wall rarely starts where the water leaves the channel, so walk the wall on a dry day and look for lime streaks and green growth. If the leak sits at the changeover to the downpipe you work lower than at a seam halfway along. Take your measurement from the ground the wheels end up on, not from the terrace beside it.

Mobile scaffold built along a side wall to just below the channel, the height at which a seam is repaired

Going too tight ends worse on repair work than on other maintenance. Applying sealant or solder with your arms above your head gives a seam that does not lie down tightly, and you cannot see whether the material really closes everywhere. You also cannot dry the channel properly, and that is precisely what decides whether the repair holds. If the gutter sits above a second floor, the build simply goes a few decks higher than usual.

Where the tower stands when the leak sits above the extension

On targeted work the leak decides the standing place, not convenience. Quite often that means the scaffold cannot go on the smooth terrace but has to sit in the border, on a gravel strip or half against a shed. Look at that beforehand and prepare the spot: tie plants back, lay slabs, take loose things away. You need the width of the tower plus the space in which the four stabilisers splay outwards, and it is that last part people forget most.

A mobile scaffold belongs on the ground, not on the flat roof of an extension or on a shed roof. If the leaking piece sits above such an addition, put the tower beside it at ground level and choose a higher build, so you come over the roof edge to the channel. Where the garden slopes there, level the base before you build on. More about that situation is in the notes on stabilising and anchoring.

Loose scaffold parts lying on a lawn next to a house, at the place where the tower will stand

Think as well about what happens below you. On a repair, water, old sealant and sometimes a piece of zinc come down, so you do not want bikes, a glass garden table or the neighbour's car parked there. If the only suitable place is on the street side, see whether you can keep a walking route free and give the neighbours a word, because a tower right in front of the door is noticed and stays for a few days.

Short hire for a gutter repair: a day or two

The repair itself is often done in a couple of hours. What fills the day is the building, tracking down the real leak and getting the piece of channel you will work on dry and clean. So reckon on half a day building and half a day working, and bear in mind you nearly always find more than you saw from the ground: a second hairline crack, a bracket that also gives, a seam rusted through underneath. Each of those turns half an hour of work into a whole afternoon.

Then there is waiting time in the material. Sealant, repair mastic and adhesive want dry weather and time to cure, and that time stands on the packaging of whatever you use. A gutter you close today you also want to check tomorrow in the rain, and that only works if the tower is still standing then. Two rental days are therefore more practical than one, even though the work itself is finished in a morning and the scaffold stands idle the rest of the time.

Assembled mobile scaffold with rails against a wall, as it stands through a short rental period

Financially you need not think long about it. Over the first 24 hours you pay the whole rate, and if the tower then stays a day longer, 95% off leaves little of that. So that checking day costs you next to nothing against the first, while it gives you the certainty that the leak has really gone. How such a short period compares with a whole week you see at the comparison by day and by week.

Which mobile scaffold suits repairing a gutter?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Repairing a gutter from the deck: one point, plenty of tools

Because you stay in one position, everything you need goes up in one trip. Run through that list before you climb: abrasive paper or a wire brush, degreaser, cloths, sealant or soldering kit, pliers, screws and the replacement bracket. Forget something and you climb up and down through a hatch, and that is exactly the moment people take risks. A bucket for the debris belongs on the list too, because you start by emptying the channel.

With a deck length of 245 cm you can still reach a stretch of channel either side of the leak, and that is usually enough. If the crack proves to run on, or two brackets are loose, you move once and carry on. Get the gutter dry and clean before you start: sealant does not bond to silt, and zinc you intend to solder must be bright and free of grease. That preparation decides how long the repair lasts. A torch helps, because a channel is darker inside than it looks.

Mobile scaffold built against a front wall up to the roof edge, deck and rails level with the gutter

Where people miscalculate is how often a small leak turns into a bigger story. A bracket pulled loose nearly always means the timber of the roof edge has gone soft. Repairing stays work at one point; if the whole length is rusted through it becomes replacing the gutter and you hire longer and often wider. If it stays with that one spot, see whether you can also renew the gutter brackets now the tower is up anyway.

Urgent scaffold hire: delivery at a leaking gutter

A leak rarely announces itself at a convenient moment. It works in your favour, then, that the latest ordering time is 15:00 on a working day: what is booked before that stands at your door the next working day. Spot a wet patch on the ceiling on Monday morning and you can be building on Tuesday. The tower comes as loose parts in a complete, counted set, so pick out somewhere dry beforehand for that stack to lie.

Building is your part: with the supplied manual and the instruction film you put it up yourself. We do not come and assemble and we deliver nothing ready built; on a repair that is no problem, since two people set one position up in a couple of hours. In a hurry you may also fetch the set yourself. That is free by appointment, at Zeeburgerpad 89 in Amsterdam, provided your transport takes the parts. What delivery in your province comes to is at the rates per province.

Complete set of scaffold parts delivered on site, ready to build under the leaking gutter

Afterwards you dismantle the tower and set all the parts together; we drive by to pick them up. Choose that collection day deliberately one day after your repair, so you can still see at the next shower whether the gutter stays dry. If you then spot a drip after all, you are back at the right height within ten minutes, instead of having to hire, arrange delivery and build all over again in a fortnight.

Safely repairing a leaking gutter on a hired mobile scaffold

The deck under your feet is an EN 1004 platform in load class 3, good for 200 kg on every square metre. On a repair you rarely approach that, but do count what you take along: a tool box, a gas canister, a piece of zinc and a second person watching add up faster than you would think. Put heavy items down by the uprights rather than in the middle of the deck, and take back down whatever you do not use.

The standard rules apply here too. Wheels on the brake before you go up, nobody and nothing on the scaffold while it is moved, and off it in a strong wind. Repairs do tend to happen in the storm season, so look at the forecast for that afternoon before you begin. Check as well that all four stabilisers really bear. On a soft border one of them sinks a few centimetres just as you are up there working with both hands.

Mobile scaffold with rails built beside a house, the steady position from which you work on the gutter

What asks extra attention on this job is fire and falling tools. Working a torch on zinc, keep a bucket of water at hand, stay clear of dry leaves in the channel and of timber fascia. Do not leave pliers or a screwdriver lying on the edge of the deck, because everything there comes down sooner or later. Warn anyone standing below before you drop a length of old material. The rules that apply further are at safe working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for repairing a gutter

1

Trace the leak during or just after a shower, before you order the tower. A wet patch is visible then, and you know at once whether you need one spot or the whole length.

2

Tip a bucket of water into the channel as soon as the repair is done and watch below to see what comes out. While the scaffold is still up you can touch it up straight away.

3

Take a second bracket up with you even if only one seems loose. Nine times out of ten its neighbour has started to wander as well, as soon as you put any pull on it.

4

Get the gutter dry and clean at least a metre either side of the leak before you apply anything. Sealant will not bond to silt, and you would rather do that work now than next season.

5

Put your tools in a closed box or bag on the deck instead of loose beside you. On a tower a pair of pliers rolls to the edge, and someone is usually watching from below.

6

Book the mobile scaffold a day longer than your repair takes. You can then check at the first rainfall whether it really is closed, without having to hire and build all over again.

Frequently asked questions

Frequently asked questions about repairing a gutter

Which mobile scaffold do you hire to repair a leaking gutter?+

For a gutter repair at five to six metres the narrow RS51 at 75 cm is the most used model. It passes a shed and slips between planting to the place where the leak is, and on the deck you keep room for your tool box. If heavy material has to go up, or you work in a pair along a long stretch of channel, you hire the wider mobile scaffold with a deck 135 cm across.

How does scaffold hire work if the gutter has to be closed urgently?+

You pick a version and a height online, say when it may come and when it may go, and pay in advance including VAT. Book early enough on a working day and you can start the following working day. Building, curing the leak and dismantling afterwards are your part; the collecting is ours. Nothing about the scaffold itself needs arranging beyond choosing your two dates. The remaining steps are set out among the questions about our hire.

How many rental days does a gutter repair usually take?+

Two days is the sensible choice for most repairs. On the first you build and work, on the second you can check whether the seam stays dry and touch it up if needed. If it stays with tightening one bracket you manage in a day. With a gutter that leaks in several places, reckon on three rental days, because then you move the tower a few times along the wall.

What does hire cost for such a short job and does the second day weigh heavily?+

The rental price follows from the mobile scaffold you choose and the height you end up at, and per province a fixed amount is added for the trip there and back. On a short repair what stands out is that the first day sets the rate: every day you tack on behind it comes with a heavy discount. A spare day therefore costs little. All amounts stand including VAT on the page with rates.

Which working height to hire when the leak sits halfway along?+

Look up first at what height that piece of channel hangs and add your reach to it. On an ordinary house with the gutter at five to six metres you land on a tower with six to eight metres of working height. If the leaking point sits above an extension, still measure from the ground beside that extension, because that is where the wheels of the mobile scaffold stand and not on the flat roof.

Can the scaffold be delivered, or would I rather collect it myself in a hurry?+

Having it brought is the simplest route: you give the day and the complete set stands at your house, at a fixed price per province including VAT. In a hurry, with a suitable van, you may also collect the scaffold free of charge at our pick up address by appointment. Do bear in mind that the parts of a build up to eight metres ask more load space than most people estimate before they start loading.

Is building included when I hire, or do you do that?+

Yes, the building is your work. We deliver the parts and take them away again, but we do not assemble and we hand over nothing ready built. On a repair that is manageable, because you need only one position and so do not have to level again and again. Follow the manual and the video, and do it with two people. Neither a cherry picker nor a facade scaffold is part of what we hire out.

What if the repair disappoints and I want to hire for longer?+

Then you push the collection day back, as long as the tower has not been promised to a next hirer. On gutter work that happens regularly: a crack turns out longer, the timber behind the channel is soft, or the weather allows no sealant. Because an extra day costs only a fraction, you may as well plan that room in at once and report the scaffold back early if you finish anyway.

How much clear space must there be under the leak to hire a tower?+

Think of the footprint of the tower plus the space the stabilisers occupy, and allow that you want to walk round it with a tool box. The leak often sits above a border or a path along the fence, so take branches, slabs and garden things away before the delivery comes. A flat surface that carries the weight matters more here than a few extra centimetres of room around you, so lay a board down where the ground is soft.

Can I leave the hired mobile scaffold standing when it starts to rain?+

Yes, and on this work that is even handy: a shower shows whether your repair holds. You do not work in the wet yourself, because sealant and solder need a dry base and a wet deck is slippery. In a storm you come off the scaffold and clear loose items away. Since you set the end date, waiting a day for dry weather costs you hardly any extra hire. The tower simply waits with its brakes on until the channel is dry again.

When is my deposit returned after hiring a scaffold for a repair?+

A deposit is settled alongside the hire itself. Once the collected scaffold set has been checked and proves complete, that amount goes back to your account within one working day. On repairs watch above all for left over sealant, mastic and solder; wipe those off the decks and rails before you dismantle. Make sure small parts do not vanish into the border either. What else gets checked is in the notes on the deposit.

Can I reach the joint at the downpipe from this tower?+

That works, provided you really wheel the tower into the corner where the hopper sits. Gutters leak there often, because the seam around the spout takes the most punishment. Set the position with the short side towards the corner and work from the deck, rather than reaching over the rail from the side. Moving takes a few minutes and gives a far better repair. Hanging out sideways on a hired scaffold is where repairs go wrong.

Hire a mobile scaffold for repairing a gutter today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.