See your price
Application

Coating a facade? Choose the right scaffold.

Coating a facade is not a painting job with a tin under your arm. Where an impregnating fluid sinks away into the stone, a coating stays on it as a thick layer: you count in kilos per square metre and every one of those kilos has to go up. On a three storey terraced house that means dozens of buckets and some eight setup positions. So here you hire the wide RS52 of 135 cm, in a build landing at 8 to 12 metres working height. Below you read how to divide those positions.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For coating a facade we recommend the Wide mobile scaffold.
  • To coat a facade you hire the RS52: a 135 cm wide deck, built to eight or twelve metres working height.
  • That deck of 135 cm takes two buckets, a roller set and two people without anyone stepping over the material.
  • Count on five to eight rental days, because two coats over one facade means finding every position a second time.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for coating a facade?

Safe, stable and professional work at height

Coating differs from ordinary painting by the volume. Where a repaint gets by on a few litres, a coating runs through many times that, and you carry it up in buckets. That weight settles almost everything here: the width of your deck, how much you finish from each position, how often you go up and down and how solidly the setup has to stand. On a whole front elevation the number of moves comes on top, because a platform of two and a half metres covers only a small part of the width. Hiring a mobile scaffold for coating a facade is therefore mainly a question of carrying capacity and of a sensible order of work.

  • Buckets of coating go up to the platform
  • Wide deck of 135 cm for material
  • Ten or more positions along the facade
  • Working height 8 to 12 metres for three storeys
Read more about working safely →

Hire a 135 cm mobile scaffold as your coating deck

For coating you take the wide version: the Altrex RS TOWER 52, 135 cm between the uprights. You genuinely use that extra width here, because beside yourself there stand two buckets, a roller bucket with a grid, a brush for the joins and usually a second pair of hands as well. On a deck of only 75 cm you spend the whole day with your feet among your own material. What other widths and heights stand ready is shown in the mobile scaffolds the hire fleet holds.

The platform is 245 cm long and that measure sets your working strip. Per position you therefore coat a little under two and a half metres of facade over the full height of that level, and then the whole setup goes sideways again. The wider the deck you hire, the more material you have with you once you are standing there, and the fewer trips you make down the ladder with a full bucket on your arm.

Wide working deck of a mobile scaffold at a front elevation, roomy enough for buckets of coating and two people

You hire the narrow RS51 only when a wide setup simply cannot get past, in an alley or on a path a metre across. You then give up working room and go down more often for fresh material, which mounts up over a whole facade. If you have the choice, take the wide version; the price difference between the two is small against the time you win. Which size fits where is set out in the overview of the dimensions of both mobile scaffolds.

Working height 8 to 12 metres to hire for facade coating

When coating you finish a facade completely, from the plinth to the edge under the gutter, so you measure to that highest point. A two storey house with a pitched roof comes out at around eight metres, while three storeys are quickly close to twelve. Ask yourself whether the gable and the strip under the overhang go with the job, because those few metres make the difference between two build heights at the moment you book.

Then count back to the height of your deck. What you give when hiring is working height, and that is the platform height with roughly 2 metres of reach on top. If you want to get to twelve metres with a roller on a pole, your top deck stands around ten metres and you build up to it in stages. What such a build asks in parts and intermediate decks is set out where a twelve metre working height is explained.

Mobile scaffold standing along a facade and reaching the gutter line, the height a full coating job runs to

Ordering too low is expensive in this work. A coating goes on in continuous passes, and if the top metre does not come with it you have to return for it later with a fresh setup while the rest of the surface has long been closed. You always see that join back in raking light, however neatly you work. Happily the RS52 runs on to 14.2 metres working height, so even a tall facade with a gable above it fits into one rental period.

Setup positions along the facade: where the hired tower stands

Coating a whole facade means letting the setup walk along the house, and every spot has to be sound for it. On a front elevation that is usually the pavement, sometimes a parking bay or a front garden. Look for where the slabs sit hollow, where a gully lies and where the threshold to the drive runs. A tall tower is more sensitive to a crooked foot than a low one, so level the wheels afresh at each new position.

Around the base you want more room than the setup itself occupies, because at this height the stabilisers stand far out. On a narrow pavement that runs over the carriageway or the cycle path, and then a word to the council is in order before you hire the mobile scaffold. Reckon with the parked cars too, because they are back every morning during your rental days, unless you tell the street in advance what is coming.

Folded out stabilisers under a mobile scaffold in the street, levelled again at every new position along the facade

Walk the whole facade before the first bucket is opened. Downpipes, meter box vents, an extension, a bay window, low shrubs and a shed decide together where your positions come and where you skip one. If somewhere the full width will not pass, plan that strip for another moment with the tower turned a quarter. Such a round costs a quarter of an hour and stops you finding out halfway through your rental period that a corner is unreachable. Taking up ground that is not flat is dealt with in the explanation of stabilising.

How many rental days does coating a whole facade need

Count your positions first. A front elevation ten metres wide already gives four positions per level with a platform of two and a half metres, and with a coating you visit each of them twice: once for the base or first coat and once for the finish. On top of that comes the preparation: cleaning, letting it dry out, closing cracks and making good loose parts. For an average house you land at five to eight days that you need the mobile scaffold.

The waits in that schedule cannot be made up. A coating has to cure before the next layer may go on, a wet facade takes nothing and in full sun the layer closes too fast. So do not reckon with workable hours alone but with the calendar: two coats over a whole facade spread in practice across the best part of a week, even working hard with two people. That calendar sets how long you hire the mobile scaffold, not your working pace.

Mobile scaffold built up along a side elevation, as it stays standing between two coats of a facade coating

For the shape of your booking that works in your favour. The first 24 hours carries the full tariff, and each further day is charged with 95 per cent off. On a job that hangs on drying times that is welcome: you set the collection date generously straight away instead of having to ring halfway through to extend. What the wide version costs per build height is shown with VAT on the page with the rates, so you can work the whole rental period out beforehand.

Which mobile scaffold suits coating a facade?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Weight on the deck: coating from the wide mobile scaffold

Work each position from top to bottom and finish the level completely before you move. That way you avoid having to pass under a fresh layer, and you keep the joins on the vertical seams where they show least. Put the bucket in the middle of the platform and not against the guard rail, because that is where you turn past all the time. With 245 cm of platform under your feet there is room enough to keep everything to hand.

You only reposition once the platform is completely empty. That sounds obvious, but with coating work the temptation to leave that half full bucket standing is great, and it is not allowed: material and tools come off first. Reckon on ten minutes per move including drawing in the stabilisers, rolling, levelling again and carrying the things back up. Four times per coat is therefore a good hour a day spent on logistics rather than on the wall.

Mobile scaffold with a roomy working platform beside a building, the deck that has to carry coating material

Few people allow for how many ladder trips this job takes. A bucket of coating is heavy and you need several of them per position, so the climbing adds up to the most tiring part of the day. Take two smaller buckets rather than one large one, and hoist the rest up on a rope down the outside of the setup. With impregnating a facade that hardly plays, but with coating the number of buckets you get up decides how many metres you finish per rental day.

Hiring the mobile scaffold and delivery with your coating stock

A build of ten or twelve metres is a considerable stack: uprights, diagonals, platforms, guard rails and stabilisers arrive as a complete, counted set. Point out a place beforehand where that may lie without blocking the pavement, and keep it dry and reachable. We hold 15:00 as the limit: whatever is ordered before that on a working day goes out with the van the next working day. Which day that becomes and when it may all go again you decide when booking.

The building is your part of the work. An assembly manual belongs with the set, and in the video you see the order per lift; at this height you work from the bottom upwards and fold the stabilisers out in good time. Allow half a day for a tall setup and do it with two people. Plan that time separately, so not on the morning the first bucket of coating is opened, because your whole schedule is then already behind.

Scaffold parts stacked on the pavement in front of a house, the way a tall set for facade work is delivered

You may fetch the set yourself at Zeeburgerpad in Amsterdam, free of charge and by appointment, but bear in mind that a build for twelve metres does not fit in an ordinary van. For most facade jobs delivery is therefore more practical, certainly if you have to drive the parts back at the end as well. Afterwards we come and fetch everything on the day you chose when hiring. For the bringing and the collecting together a fixed rate applies that differs by province; you find those amounts on the page about delivery charges.

Coating safely at height with full buckets on the platform

The deck may carry 200 kg per square metre; that is what load class 3 within EN 1004 amounts to. When you are coating a facade that is no theoretical figure, because two people, a few full buckets and a box of tools add up considerably together. So spread that weight over the length of the platform instead of putting everything in one corner, and leave no buckets standing on a level where you no longer work.

The wheels go on the brake before the first person climbs up, and you never move it with somebody on the deck or with material still standing on it. On a tall tower the wind counts heavily: above eight metres you feel every gust, and in a stiff wind you stop coating. A bucket that falls from ten metres is besides a good reason to fence off the pavement under your working strip with tape or cones.

Complete and inspected set of scaffold parts, the basis for a stable build under heavy coating work

Work with a clean deck as well. Spilt coating turns slippery and cures to a film you slide straight off, so wipe up at once whatever lands beside the bucket and keep a cloth to hand. Always climb up on the inside through the built in ladder, and never up the outside of the frame with a bucket in your hand. Hoist material up on a rope, and you keep both hands free for the rungs while you climb.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for coating a facade

1

Number your positions in chalk on the pavement before you start. With two coats over the same facade you know exactly where the setup stood and the second coat joins onto the first.

2

Put a second person below at the buckets. Someone who passes up and fills the roller bucket saves you three or four ladder trips per position, which is where the real graft of a coating day sits.

3

Start on the side the wind comes from, so dust from the sanding does not keep blowing over the fresh coating. On a long facade that order saves a lot of making good at the edges.

4

Keep the top positions for the morning. Later in the day the facade is warmer and the coating closes faster, while up there you have to pull the longest passes without the edge drying.

5

Save half a bucket of every batch until the end of the job. If a spot proves thin after curing, you make it good while the scaffold still stands rather than having it come back.

6

Rinse your roller bucket out below and not on the platform. Water and coating remains on the deck make it treacherous, and at ten metres up you do not want to find that out.

Frequently asked questions

Frequently asked questions about coating a facade

Which mobile scaffold do you hire for coating a facade?+

For a whole facade you take the wide mobile scaffold, the RS52 of 135 cm. With coating a lot of material goes up and you often stand up there with two, and that combination does not sit comfortably on a narrow deck. The wide version has room for two buckets, the roller set and your tools without you tripping over them. Only where the facade lies behind a narrow passage do you hire the RS51 of 75 cm instead.

How does it go when you hire a mobile scaffold for coating?+

You choose the wide version online with the build height that suits your facade, say which day the set must come and which day it may go, and pay a fixed price with VAT beforehand. We deliver the parts counted, you build the mobile scaffold and work your positions off one by one. At the end you dismantle it and set everything ready for the driver. There are no more steps to it than that.

How many rental days does coating a facade take?+

For an average three storey house you land at five to eight rental days. That is not because of the coating itself, but because of the number of positions you pass twice and the time the first coat needs to cure through. If you do the preparation from the scaffold as well, add another day or two. Book a little generously rather than tight, because half a facade with a cured join is harder to repair than an extra day of hire.

What does it cost to hire a wide mobile scaffold, and how does the discount work?+

The rental price follows from the build height you need and from the model; the wide mobile scaffold sits a little above the narrow one. To that comes the rate for bringing it and taking it away again, which is fixed per province, all with VAT included. From the second day every rental day counts for only a fraction, and precisely with a coating that has drying times in between, that makes the difference between planning tight and working on calmly.

Which working height must you hire for a three storey facade?+

Measure from the pavement to the highest point that gets coating, usually the edge under the gutter or the top of the gable. With three storeys you are soon between ten and twelve metres, so you hire a mobile scaffold with a working height up to 12 metres. Bear in mind that your top platform lies roughly two metres below that working height. Caught between two builds, choose the taller of the two.

Is such a tall set delivered, or do you hire it and drive yourself?+

Having it delivered is the wisest at this height. A build for ten or twelve metres consists of a great many loose parts, and those do not fit in a car or a small van. The driver drops the complete mobile scaffold at the spot you give, and at the end of your rental period he comes to take it away from there. Driving yourself is allowed, but on a facade job only realistic with a trailer or a large van.

Does the hire firm build the mobile scaffold against the facade?+

No, the building you do yourself. You get the mobile scaffold as a complete set with the assembly instructions, and at a tall build you do it with two. Reckon on half a day before you can start, and keep that time apart from your coating planning; dismantling at the end costs a few hours more. We do not build for you, and we have no facade scaffolds or cherry pickers for hire.

What if the coating needs longer to dry and you want to hire longer?+

Then you extend the rental period and the collection day shifts with it. With coating work that is the rule rather than the exception, because how fast a layer cures depends on temperature and humidity. Since each day beyond the first runs at a discount, keeping it is almost always better value than having the mobile scaffold taken away and ordering it again a week later. Report it before the collection round is planned.

How much clear space along the facade does this scaffold hire ask?+

Reckon on a strip a good two metres wide along the whole facade, because the stabilisers of a tall mobile scaffold project a fair way. Where the footway is narrow, part of that strip lands on the road or in the cycle lane, and the council wants to hear about it beforehand. Take account of parked cars under your working strip as well: with coating something always comes down, and you do not want that on the neighbours' paintwork.

What do you do about rain during the days you hire?+

Then you do not coat. A facade must be dry before the layer goes on, and a fresh coating tolerates no shower in the first hours after it. The mobile scaffold itself can happily stay outside; aluminium suffers nowhere from that, only the platform turns slippery and you wipe it dry before use. In changeable weather plan an extra rental day straight away, then you skip a day without your whole schedule collapsing.

What happens with the deposit when you hire for coating work?+

You put down a deposit when booking and get it back as soon as the mobile scaffold is completely returned; after counting through, the amount is transferred within 1 working day. With coating that is a reason to work neatly: cured spatter on uprights and platform sections does not come off easily. Cover the deck where you stand with the bucket and wipe spilt coating away at once, then you hand the set in clean.

Can you really apply a thick coating layer from a mobile scaffold?+

Yes, provided you set the arrangement up for the weight. You work a strip of two and a half metres per position, keep the buckets in the middle of the deck and only move once everything is off it. What you do not do from a mobile scaffold is fill a whole facade in one movement; you accept vertical joins and make sure they fall on a natural seam. Hiring a tower then gives the same result as a fixed stage.

Hire a mobile scaffold for coating a facade today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.