See your price
Application

Inspecting a gutter? Choose the right scaffold.

Inspecting a gutter means checking whether it still does what it should: does the water run away, does it still sit level, are the brackets tight and is anything leaking at a joint. You judge that from close up, because from the ground you only see the outside. For a gutter four to six metres up you take a slim mobile scaffold with a reach of 6 to 8 metres. Below you read which model suits that and why one day of hire is usually enough.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For inspecting a gutter we recommend the Narrow mobile scaffold.
  • For inspecting a gutter the slim tower of 75 cm does the job, reaching 6 to 8 metres.
  • You take little up with you: a torch, your phone for photographs and something to check the fall with.
  • One day of hire is often plenty for an inspection, provided you had the build delivered the day before.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for inspecting a gutter?

Safe, stable and professional work at height

Inspecting is not work where you stay long in one place. You want to go along the whole gutter: at the outlet, halfway, at the joints and on the corner where it sags. That means moving often and standing still each time just to look. A light, slim build suits that better than a heavy one; you roll it on your own and you get past everything. A ladder against the gutter gives you one point only and presses against the very edge you are judging. Anyone who hires a mobile scaffold for this is really renting the ease of looking six times at eye level without leaning on anything.

  • Look along the whole gutter at eye level
  • No leaning against the gutter edge anywhere
  • Quick to roll the tower from point to point
  • Reach of 6 to 8 metres on a normal house
Read more about working safely →

Hiring a mobile scaffold for a gutter inspection: which model

Take the slim version of 75 cm wide for this job, the RS51 in the Altrex range. You need little room up there: a torch, your phone, perhaps a screwdriver to test a bracket and a cloth to wipe a joint clean. What you do need is a tower you can move along the wall on your own. Inspecting a gutter you do that six or seven times in a morning, and then every kilo you do not have to push counts towards your pace.

That slim size helps at the side of the house too. The strip between a wall and the boundary is no more than a metre at many houses, and often there is a downpipe, a tap or a row of slabs against it as well. With a build 75 cm wide you get past there without first having to clear half the garden. You would only choose the wide version of 135 cm if you were taking material and tools up for a repair at the same time.

Slim tower built up along a front elevation as far as the gutter, the position from which you look closely

If the gutter is only three to four metres up, over an extension or a garage for instance, a one person build can do the job as well. On an ordinary house with a storey above it that leaves you a metre short and you end up peering upwards anyway. If you are hesitating between the slim and the wide build, put the different mobile scaffolds you can hire side by side and look above all at the openings you meet on the way.

Which working height to rent for a gutter at five metres

The point that matters is the top rim of the gutter, because you have to see over it. On an ordinary mid terrace house with a storey and a pitched roof that rim hangs at four to six metres. The height you state when you hire is called working height, and it is made up of the height your platform stands at plus roughly 2 metres your arms add to it. For this job that comes out at a reach of 6 to 8 metres.

On an inspection you want to stand a little higher than on most other jobs. If your chest is at gutter rim height you look at it rather than into it, and it is the inside you want to see: the silt in the bend, the stain by a joint, the place where water stands. So choose your build so that your head comes well above the rim and you can look down into the gutter without stretching.

Mobile scaffold built up beside a house along the wall, the kind of stand that puts you above the gutter rim

Measure from the spot where the castors will end up, and note that a drive or a garden path can fall away quite a bit. Choose too low and you miss exactly the part of the gutter you wanted to check, and then you had the build brought for nothing. Which build goes with a gutter at five metres you can see on the page about working at 8 metres of working height, including the platform height that belongs to it.

Where to stand the tower along the gutter you inspect

Because a gutter runs the full width of the elevation, you do not put the build in one place but in a series of places. Walk that route once beforehand and look carefully at where the castors will have to run: over slabs, over grass, past a border or over a lip at the garden path. On a path thirty centimetres wide you get nowhere with a mobile scaffold. So make sure the strip along the wall is passable and reasonably level over its whole length before you order anything.

At the front you are often on the pavement or a drive, and then the question is whether you are in the way of cyclists and pedestrians. Keep a walking route free for people on foot and ask the council whether anything has to be arranged in your street. At the back the obstacles are different: a shed, a water butt under the outlet, a low canopy right beneath the gutter. The notes on standing a build on uneven ground help with a garden that is not level.

Stabiliser legs set out under a tower on slabs, showing what level ground each stopping point asks for

Think as well about where the four stabiliser legs come out. They stick out at an angle and want a level piece of ground at every stopping point, including halfway along a border. It is a shame to be able to look at the gutter by the outlet but not at the corner, because a raised terrace sits exactly there. So walk the whole elevation and decide in advance at which points you want to stop; that saves you a lot of shoving on the day.

How many days of hire an inspection round really needs

Inspecting is short work. Six or seven stopping points along the elevation, a few minutes of looking at each, some photographs and a note of what is wrong. Without the assembly you are round in a couple of hours. So count on one day of hire for the inspection round, with building up and taking down eating the greater part of your time. Anyone who wants to go all the way round a terraced house, front to back, takes half a day longer in practice.

Even so, booking a single day is not always sensible. If your looking turns up something you want to put right yourself straight away, you want the build to stay standing a while. On top of that the weather can spoil things: in a hard wind or slippery rain you would rather postpone. Booking two days and possibly not using the second is therefore rarely a wrong call, even if your inspection is done in a morning in theory.

Frames and orange diagonals on block paving, a hire set that is delivered and collected within a single day

That costs little as well. Over the opening twenty four hours you pay the full amount; from every day after it 95 per cent comes off, so that second day hardly registers in your total. You give the start date and the end date you want yourself, and handing back early is always allowed, even if you are done after one morning. What a short period costs for your model you can work out on the page with the rental price per height.

Which mobile scaffold suits inspecting a gutter?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Checking the gutter from a platform of 245 cm

With a platform of 245 cm you check a good two metres of gutter per stopping point. That sounds like little, but for inspecting it works nicely: you take in a manageable length, note what you see and then shuffle on. Start at the outlet, because that is where you notice quickest whether water is standing, and work from there towards the far end of the gutter. That way you keep track of which part you have had and which is still to come.

Watch a few things per length: is there water in the trough, does the gutter sag between two brackets, has a joint come loose, is moss growing in the bend, is there a bracket you can move with a finger. Push gently against the front of the gutter as well to feel whether the whole thing is still firm. This is emphatically looking work: scooping out and flushing through is cleaning, and adjusting brackets belongs to the yearly service.

Erected tower along a side wall at gutter level, the stand in which you judge one length close up

You move with an empty floor, even if you are only shifting two metres. Take your torch and your phone down with you, leave nothing lying on the rim of the gutter and then wind the stabiliser legs out neatly again at the new spot. If your round shows more is wrong, plan a separate job; repairing a leaking gutter asks for tools, material and above all more days than you have booked for now.

Hiring a mobile scaffold with delivery for one short day

The build comes to you as a set of loose parts that went into the van counted. For a short job that takes some getting used to: you spend more time assembling than looking. That is exactly why it pays to let the delivery fall a day before your inspection day instead of on the morning itself. If your order is in on a working day before 15:00, everything is ready the next working day, and you have the evening before or the early morning to build.

When you reserve you fill in yourself on which date the set arrives and on which date it is collected again. For a gutter inspection in autumn that is handy: you pick a day that is dry and still, and move it if you must. Do bear in mind that a windy day upsets your whole plan, because then you stay below with your notes. A set that reaches eight metres is a manageable build in any case, certainly next to the tall versions.

Delivered set of scaffold parts waiting on site, the pile you assemble before a gutter round begins

When you are finished you only have to take it apart and set it out stacked; we come and remove the parts again. Run through the count while you are stacking, because a brace left lying in the hedge would otherwise only show up at our end. That way you know for certain the set you received goes back complete. The charge for bringing and collecting goes with your province, and that overview is with the rates for delivery.

Working safely along the gutter at four to six metres

The floor you stand on belongs to load class 3 from EN 1004 and holds two hundred kilos per square metre. On a looking round you get nowhere close to it, since almost nothing goes up with you. It is still useful to know where the limit lies, certainly if halfway through you decide to take a bucket or a tool box up after all. As soon as you move from looking to working, what ends up on that floor changes too.

Put the castors on the brake before you go up, never roll the tower while anyone or anything is still on the floor, and in a stiff wind do not climb at all. That last is no theoretical point on a gutter inspection, because you look in autumn and that is the season of squalls. A day's delay costs you almost nothing on the hire, while a wet, slippery floor at five metres is a risk nothing outweighs.

Mobile scaffold with guard rails built up along a house, the safe stand from which you look into the gutter

The particular risk of this job is the leaning. You want to look into the gutter, so you automatically hang over the rail and stretch your neck. Rather set the build a little higher than stretch yourself, and if need be use your phone camera to see into the bend you cannot reach. Keep the ground under you clear as well: a torch that falls lands exactly on the spot where somebody is standing to look up.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for inspecting a gutter

1

Photograph each stopping point with your phone before you move on. At the table at home you often see more on those pictures than you did with your nose against the gutter.

2

Take a small mirror up to see under the gutter rim and behind the brackets. That saves you a second round along exactly the same points of the elevation later on.

3

Begin your round at the outlet and work towards the far end. That way you know at every stopping point which part of the gutter you have already seen and where you still have to go.

4

Do the inspection in autumn once the leaves have just come down. You then see straight away whether the gutter can cope, and you have the rest of the season to plan any work.

5

Have the build delivered a day before the inspection. You are then not still assembling on the morning itself and can start as soon as it is light and dry enough to see anything.

6

Write down per stopping point what you see, with the distance to the corner beside it. Without that note you will not know a week later which bracket it was.

Frequently asked questions

Frequently asked questions about inspecting a gutter

Which mobile scaffold should you hire to inspect a gutter?+

The slim build of 75 cm is the logical choice here. You take almost nothing up, so working room on the floor hardly matters, while you do want to shift six or seven times along the elevation. A slim build you push on your own and it gets past a downpipe or over a narrow garden path where a wide one sticks. Only hire wider if you already expect the inspection to run straight into a repair.

How does hiring a tower for a gutter inspection work in practice?+

Online you set the model and the height range, say on which day the parts should land and on which day they go, and pay a fixed amount with VAT already in it. On the chosen date the set is at your house. You put it up, walk the gutter, take it down again and set the parts together. We only take care of bringing and removing the mobile scaffold; the rest of the day is yours.

Is one day of hire enough to inspect the gutter?+

For the inspection itself it is: along one elevation you are done in a couple of hours. Assembling the tower and dismantling it afterwards asks more time than the looking itself does. If you want to go along the front and the back, or think you may want to tackle something small straight away, book two days instead. Handing back early is always allowed, so a generous reservation risks nothing. You simply pay over the days you actually set.

What does a single day of tower hire cost you in practice?+

Your hire price hangs together with the model and the height you choose, and on top of that comes a fixed transport amount that differs per province. Everything stands online including VAT beforehand. On a short job like this the first day weighs by far the heaviest; what you put behind it almost disappears against that. Two days therefore differ hardly at all from one, and you do have a spare day in reserve.

Which working height do you rent to be able to look into the gutter?+

With a gutter at four to six metres you reserve a mobile scaffold that reaches 6 to 8 metres. What matters is that your head comes above the gutter rim, otherwise you look at the outside instead of into the trough. Start measuring at the ground the castors rest on and finish at the top rim of the gutter, not at your doorstep. The page with every available working height shows which build belongs to it.

Do you have the scaffold delivered when you hire, or fetch it yourself?+

Both routes work. Have the mobile scaffold brought and the set arrives on the date you gave, going back after your inspection for a fixed amount per province. If you would rather come by, the set is ready for you at no cost by appointment at our address in Amsterdam. A set for this height usually fits in a van or on a trailer of ordinary length, so for a gutter inspection that is quite doable.

Is putting the tower up included, or does that fall to me when I hire?+

That is yours to do. A manual comes with the set and there is a film in which the order of assembly is demonstrated. With two people you are at height within an hour or so, even without experience. We take care of bringing and removing the tower, but put nothing up and take nothing down. If you want somebody to take that over, a scaffolding firm suits you better than our hire. That is worth knowing before you plan your inspection day.

What if the inspection turns up more than expected and I want to hire longer?+

That happens regularly: you go to look and discover a loose bracket or a joint that leaks. Give us a shout and we shift the collection day as long as the tower is still free. You can leave the build standing to finish the work straight away. Do remember that a repair usually asks for different tools and more material, and sometimes a wider floor than the slim build you picked for looking.

How much room do you need at every point along the elevation?+

Beside the footprint of the mobile scaffold the four stabiliser legs count, sticking out at an angle. In practice each stopping point needs roughly two by two metres of level ground. Because you want to go along the whole gutter, that has to be possible at each point, and by a border or a raised terrace it is precisely there that it fails. So walk the whole elevation before you fix a date.

Can you inspect a gutter if it rains during your hire period?+

A bit of drizzle is actually handy, because you see at once where the water stands or runs out over the rim. In a heavy shower or a hard wind you put it off, since a wet floor at five metres is slippery. Because you decide yourself when the tower goes back, a day's shift costs little. Do put your notes and your torch indoors rather than leaving them on the platform overnight.

And the deposit, how does that run when you hire a mobile scaffold?+

You pay a deposit along with your reservation; the money is returned within one working day after we have it back, as soon as the scaffold set counts out complete. Because an inspection round involves hardly any dirty work, there is seldom anything wrong with the deck boards. Watch the small parts such as braces and clamps above all, since those vanish into long grass while you dismantle. More on that is under getting your deposit back.

What is the difference from the scaffold you hire for gutter maintenance?+

On an inspection you only look: you go along six points, judge the trough and come down again. That is a job of a day at most, with an almost empty floor under your feet. At the yearly service you scoop the gutter out, flush it through and go along every bracket, with buckets and water on the platform and more days of hire. The same mobile scaffold does for both, but the period and the weight differ.

Hire a mobile scaffold for inspecting a gutter today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.