See your price
Application

Coating a roof? Choose the right scaffold.

Coating a roof means going over the covering coat after coat, and all of that material has to travel upwards in buckets. You do not walk the roof surface on a scaffold: the tower stands at the edge and works as your supply point. That is where you step up, where the buckets sit and where your tools stay. On a house of two storeys that comes down to hiring a wide mobile scaffold with 8 to 12 metres of reach. Below you read which model fits and where to stand it.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For coating a roof we recommend the Wide mobile scaffold.
  • For coating a roof you take the wide model at 135 cm across, built to a working height of 8 to 12 metres.
  • The scaffold stays at the roof edge as the supply point for your buckets, because the coating itself is applied walking over the tiles.
  • Three to five rental days is normal, because a coating goes on in layers with drying time between each one.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for coating a roof?

Safe, stable and professional work at height

With roof coating most of the effort goes into getting material up. A full bucket of coating is heavy, you need several of them and they all travel the same route upwards. On top of that the work goes on in layers, so you walk that route again on different days. A ladder does not solve it, because with a bucket on your arm you cannot climb safely and you cannot put anything down. Hiring a mobile scaffold gives you a deck the material can stand on and lets you work with both hands free. Renting a scaffold for roof coating is therefore about width and standing room first, and only after that about height.

  • Buckets of coating lifted to the roof edge
  • Wide 135 cm deck for your coating material
  • Reach of 8 to 12 metres on two storeys
  • Layers with drying time need several rental days
Read more about working safely →

Hiring a wide mobile scaffold for coating your roof

For roof coating you take the wide Altrex build, the RS TOWER 52. That frame measures 135 cm between the uprights and carries a platform length of 245 cm, and you choose those dimensions here for what has to fit on the deck. Two buckets of coating, a stirrer, a roller or a lance, and then room to get past all of it towards the ladder hatch. On a cramped deck everything is in the way after the second bucket, exactly when you want to squeeze by with wet hands.

A narrow 75 cm model stays thinkable when the only way to the back of the house is a path a metre wide. You give up deck space, and on this job you feel that at once: every bucket you cannot put down sits where your foot belongs. So measure the tightest passage to the roof edge before anything else. The widths available in our mobile scaffold hire range are listed per model together with their reach.

Wide mobile scaffold erected beside a modern house, the model you hire for coating a roof from the edge

Do not pick the model on the roof surface. The coating itself happens walking over the tiles with the proper roof gear, while the tower stays at the edge to step off and to hand material across. What you hire is about supply and access, not about how far you reach across the roof. To lay the sizes beside each other before you commit to a width, use the overview of scaffold dimensions, because swapping on the working day itself is not possible.

Which working height to hire for coating to the roof edge

The highest point on this job is not the ridge but the edge or the gutter where you step across. You want your hips above it, otherwise you are scrambling at the moment somebody hands you a bucket. On a house of two storeys that edge sits around 6 to 8 metres, so you hire a working height of 8 to 12 metres. Add roughly 2 metres of reach to your platform height, which puts your deck somewhere between 6 and 10 metres.

The measuring point below is the ground under the castors, not the doorstep at your front door. If the garden lies half a metre lower than the terrace, that half metre counts in full towards what you book. Check as well whether an overhang projects past the gutter, because that decides how close your deck can come to the edge and whether the step across stays comfortable. The page on mobile scaffolds with 10 metres of working height shows which build belongs to that reach.

Mobile scaffold reaching to just under the gutter along a front elevation, the height that roof coating asks of you

Hiring too low bites quickly here. One platform short and the buckets go over your head and across the gutter, which is exactly when coating runs over the edge. The step onto the roof surface becomes needlessly awkward as well. One level extra adds little to the rental price and saves you a whole week of fiddling about. If your gutter hangs at the height of a second floor, hold the top of the range.

Where the hired scaffold stands when you coat a roof

You stand the tower along the elevation that gets you nearest the roof edge, usually the side with the lowest gutter and the most room beside it. At the base you need more space than the frame itself takes, because the stabilisers splay outwards and you want to walk between them with full buckets. Keep a flat patch free as well for the stock of coating, out of the sun and covered against a shower, so you are not dragging buckets through the garden halfway through the day.

Look at the ground before the van arrives. Paving and a driveway are fine, a border that sinks after a wet night is not. If the terrain falls away, take that up in the build and not with a plank under one castor. Count on the obstacles that stand along a roof edge anyway: a downpipe, an extension with a small flat roof, a shed against the wall, a hedge that has run away with itself. For a sloping surface, the explanation on uneven ground helps.

Stabilisers splayed out at the foot of an erected mobile scaffold, the room to keep clear beside your coating buckets

Think about what happens below you while you are busy above. Coating dripping off a roller or a lance lands on the paving, so put sheeting or cardboard under your access point and along the wall. If part of the scaffold ends up on the pavement, leave room for people passing and check with the council what is allowed in your street. Something like that is better arranged a week before delivery than on the morning you want to begin.

Rental days for a roof coating that goes on in layers

A roof coating is not an afternoon job. You begin with cleaning and drying, then usually a primer or a thinned first coat, and only after that the finish. Between those coats sits waiting time that nothing can shorten, and it is exactly that waiting time which decides how long you hire a mobile scaffold. For an average pitched roof on a terraced house you land on three to five rental days, while the application itself fills only part of them.

The weather counts for more on this job than on most other maintenance. The roof surface has to be dry before you begin, it must not turn too cold while the coat cures, and a shower on fresh material means starting again. So do not look at the first day it could be done, but at a run of days that are usable back to back. Add the build day to that, plus the morning when you clear up and clean the deck.

Scaffold frames along a house front at the kerb, arriving before the string of rental days a coating asks for

The way the hire is priced means planning generously costs little. You are charged the whole rate for one 24 hour period, and any day you hang behind it carries a 95 per cent discount. A spare day for disappointing weather barely shows on your invoice, while booking tight means standing beside a half coated roof waiting for the collection van. Working out such a period is set out in this piece on rental days, with rules of thumb per job.

Which mobile scaffold suits coating a roof?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

The scaffold as supply point for coating buckets at the edge

From the platform you do three things on this job: step across to the roof, take material in and hand it on, and bring everything back down at the end of the day. That 245 cm of platform length gives you room for two buckets and your tools with space to stand beside them. Put the bucket you are working from on the ladder side, so you are never shuffling past your own stock with wet hands and a loaded roller.

How often you reposition depends on how far up the roof you work from the edge. Most people pick out the spot where the step across is calmest and then leave the tower standing there until that roof surface is finished, rather than shunting it along behind the work. If you do move it, clear the whole deck first. A scaffold with buckets on it does not get pushed forward, not even across two metres of paving.

Mobile scaffold built up to the gutter along a side wall, the supply point where coating buckets are set down

What people misjudge is the quantity of material. A roof surface is bigger than it looks from below and the coating goes on in several layers, so you go up and down more often than you expected. Work out beforehand how many buckets one coat costs and set them ready at the foot of the tower. That saves an unplanned trip to the builders merchant halfway through a coating day. If it is specifically about coating roof tiles, the cleaning beforehand comes on top of that.

Hiring a mobile scaffold with delivery for your first coating day

The scaffold arrives as a set of loose parts, complete and counted, laid down on the spot you point out. Decide that spot in advance, because on a roof coating job the strip along the wall is already taken by buckets and sheeting. A corner of the driveway works better than the path you walk with material all week. An order placed before 15:00 on a working day leaves the depot the following working day.

The arrival day and the day it leaves again are both fixed by you when you reserve. Let that choice follow the forecast: have it delivered the day before your first coating day, so you build calmly and can get onto the roof the next morning. If a cleaning round comes before the coating, simply count those days in as well. The rates for delivery and collection are listed per province, so you can put that item in your budget straight away.

Van with scaffold parts in front of a house, the delivery you time just before your first coating day

Once the final coat is on we come and take the lot away again. You make sure the scaffold is dismantled and complete on the same spot where it was dropped, so the driver can load it in one go without you needing to be there. Do not break it down until the roof is dry and walkable, otherwise a spattered set stands on the pavement. Check the parts off as you dismantle and nothing stays behind the fence.

Safe hire and safe work on the scaffold during roof coating

Every platform in the hire fleet is approved to 200 kg per square metre, the limit of load class 3 within EN 1004. On roof coating you come closer to it than on other maintenance, because two full buckets plus yourself plus somebody handing up adds together fast. Spread the weight over the full platform length instead of piling it all at the access point, and send empty buckets straight back down. The explanation of loading and weight sets out the figures.

The fixed rules apply now as well. Lock all four castors before you start climbing, never push the tower forward with anyone or anything on it, and stop work as soon as it begins to blow hard. On this job the step across to the roof surface is added: that is a separate moment with its own risk and you do not take it with a bucket in your hand. Only set foot on the roof surface itself with the equipment that is meant for the job.

Erected mobile scaffold whose ladder sits inside the frame, the climb nobody takes while carrying a full coating bucket

The risk that belongs to coating is a slippery deck. Spilt material dries to a glassy film you notice only when you slide on it. Lay cardboard down, sweep spatters away the moment they land, and keep the zone under the tower clear of people, because a falling bucket brings its lid and its whole contents down with it. What else is agreed while you are working at this height is written out in the rules for working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for coating a roof

1

Hoist your buckets up the outside on a rope instead of carrying them. Both hands stay free on the ladder and it saves you dozens of climbs on a coating day.

2

Put an empty bucket with a lid on the deck as a bin for rollers, cloths and tape. Nothing blows off the platform and there is no separate clear up at the end.

3

Chalk the paving where the castors stood before you move the tower. Come back for the second coat and your access point sits exactly right against the roof edge again.

4

Stir the coating down at the base and not up on the deck. A toppled bucket at height costs you half a day cleaning platform, tubes and the wall underneath.

5

Mask the top edge of the gutter at the point where you step across. That is where you cross most often while coating, and where most of the mess off your soles lands.

6

Set your collection date a day behind your last coat. That leaves you a morning to let the roof dry and to dismantle the scaffold clean and complete without hurrying.

Frequently asked questions

Frequently asked questions about coating a roof

Which mobile scaffold should I hire to coat my roof?+

Take the wide RS52, because roof coating is all about deck area for buckets, a stirrer and tools. The scaffold serves as a supply point at the edge and you want to put things down without stepping over them. If your only way round the back is a narrow gate, the slim RS51 is what remains and you keep less stock up top. Measure that passage before you reserve, because a wide frame will not fit through it afterwards.

How does hiring a scaffold for roof coating work from start to finish?+

You fix the model and the reach online, pick your own delivery day and collection day, and see a fixed price including VAT straight away. The parts are dropped off by us, and you assemble the tower at the roof edge to use as an access point while the coats go on. On your last day it stands dismantled and we drive it away. The rest of the procedure is covered in the answers to common questions.

For how many days should I rent a mobile scaffold for roof coating?+

Reckon on three to five days of hire for an average pitched roof. Cleaning beforehand, waiting between coats and the curing of the finish together fill more days than the application does. If you are doing two roof surfaces or repair work comes with it, add a day on top. You set the end date yourself, so rather a day too generous than just short, because stopping halfway through a coat is not what you want.

What does it cost to rent a scaffold for roof coating from day two?+

The amount depends on the model and reach you choose, and the bringing and fetching to your province comes on top of it. Everything is listed including VAT on the page with rental rates. For coating work the structure falls out well: that first day weighs heaviest and what you stick behind it hardly registers. One continuous period is therefore cheaper than two short bookings in a row, certainly when you are waiting on drying time.

Which reach do I hire for my roof and how do I measure it?+

Measure to the gutter or the edge where you step across, and start measuring at ground level under the castors. On two storeys that gives you a working height of 8 to 12 metres. If a substantial overhang projects past the gutter, hold the top of the range when you hire rather than the bottom of it. Which build belongs to which height is shown on the page about working heights.

Delivery or collecting it myself: which is handier when hiring for coating work?+

Either works. With delivery we set the mobile scaffold down on your day and drive it away after the final coat, for a fixed amount per province. If you own a trailer that can take the parts, you may fetch them yourself: free of charge, by appointment, at Zeeburgerpad in Amsterdam. For coating work most people still choose delivery, because there is already enough material waiting to be hauled about that week.

Is putting the tower together included, or does building it come with the hire?+

You do that yourself. We only bring and fetch; assembling, moving and dismantling sit on your list. With a second pair of hands you are busy for half a day, and the manual supplied plus the instruction video walk through the order step by step. Plan that half day separately when you hire, because you rarely reach the first coat on your build day. The step by step build guide helps a lot there.

What if the coating is not dry and I want to hire for longer?+

Let us know in time and we move your collection day, as long as the scaffold is not already reserved for somebody else. With coating that happens regularly, because a coat cures more slowly at low temperatures than the packaging promises. To stay ahead of the risk, book an extra day at once: returning early is always allowed. That way you never skip a finishing coat because the van is already on its way to your address.

How much clear space does the standing position need for roof coating?+

Reckon on the width of the frame plus what the stabilisers project on either side, and keep a strip beside that for your stock of coating and the sheeting. Along the wall you want a flat piece a few metres long in practice. Move a water butt, bicycles or planters out of the way before the scaffold arrives, because shuffling an erected tower about later easily costs you an hour of working time.

Can I keep the scaffold on hire if the weather turns while I am coating?+

The mobile scaffold can quietly stay where it is, you only postpone the coating. A wet or too cold surface will not take the material and a shower on a fresh coat undoes your work. Use such a day to clean, to cover up or to lay tools ready, and pick the thread up again as soon as it dries. Because the end date is in your own hands, a shift like that costs at most one extra day.

What happens to the deposit when you hire a mobile scaffold for roof coating?+

You settle a deposit at the reservation, and once the returned set has been counted the money reaches your account again one working day later. With coating you watch two things: hand in every scaffold part complete, and leave no dried material on decks and tubes. Cardboard laid down while you work saves scrubbing on collection day. A knocked over bucket earns you that scrub anyway. More stands in this article about the deposit when you hire.

Can I get onto the roof surface from the hired scaffold to coat it?+

The tower brings you to the edge and works as an access and supply point, but the coating goes on while you walk the roof itself, with the equipment meant for that. From the deck you reach only the bottom row of tiles and the gutter. So never climb over the guard rail with a bucket in hand, and read what is possible on a pitched roof before you start on the surface.

Hire a mobile scaffold for coating a roof today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.