See your price
Application

Painting a balcony railing? Choose the right scaffold.

Painting a balcony railing is work on two sides of the same rail. The inside face you still reach from the balcony itself, but the outer side of the bars and the bottom rail come within reach only when you stand beside them. That is why you hire a mobile scaffold of just 75 cm wide, standing next to the balcony rather than under it, with a working height of 6 to 8 metres. Below you read which model suits this railing, how many hire days two coats take and where the tower stands.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a balcony railing we recommend the Narrow mobile scaffold.
  • A balcony railing is painted from a hired RS51 of 75 cm wide, with 6 to 8 metres of working height.
  • The mobile scaffold stands beside the balcony and not underneath it, because the outer face of the bars is the real work.
  • Allow three hire days for sanding, priming and topcoat, with drying time between the coats and two sides to every bar.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for painting a balcony railing?

Safe, stable and professional work at height

From the balcony itself you reach only half of this job. The inside face and the top rail are fine, but the outer side of the bars, the corner posts and the bottom edge you cannot even see properly from above. Hanging over the rail is no answer, because then you lean your full weight against the very part you have just painted. Renting a mobile scaffold puts you at eye level beside the railing, with two free hands and your kettle within reach. After that it comes down to three things: the height of the balcony, the clear ground beside it and the number of days your railing may stay wet.

  • Outer face of the bars needs a pitch alongside
  • A balcony railing is no handhold and no support
  • Working height 6 to 8 metres at a balcony railing
  • Three hire days for sanding, priming and topcoat
Read more about working safely →

Which mobile scaffold to hire for a balcony railing with bars

For a balcony railing you hire the Altrex RS51, a mobile scaffold that is only 75 cm wide. That width is no luxury here but a condition, because the tower usually has to travel round the back: through a garden gate or along a path beside the fence. At a block of flats it also helps that this width does not block half the pavement or a whole parking bay. The range is listed with the mobile scaffolds we rent out.

On the platform you never miss the extra width. At a railing you work close to your hands, with a brush, a small kettle and an abrasive sponge beside your feet, and you move mainly sideways along the bars. What counts here is the platform length of 245 cm, because that decides how many metres of railing you finish from one pitch. A wider deck brings you not one centimetre nearer the bottom rail and only leaves you more parts to carry round the back.

Narrow 75 cm mobile scaffold built up beside a house, the pitch you hire for painting a balcony railing

The wide RS52 at 135 cm becomes interesting only if two of you are working, or if the railing is part of a larger refurbishment with sheet material. For a railing alone the access route weighs heavier than the floor area, because a tower that will not fit round the back has been hired for nothing. Measure your narrowest gate against the figures in the overview of mobile scaffold sizes. If it is tight, take the narrow build without hesitating.

Which working height to hire for a balcony railing upstairs

At a balcony railing the highest point is the top rail, so that is what you measure to. With the balcony on the first or second floor that rail sits at roughly 4 to 6 metres and you hire 6 to 8 metres of working height. Those two figures differ because the quoted working height is the height of your platform plus the reach of a person standing on it, roughly 2 metres. The matching build is shown with the towers at 8 metres working height.

For this job you do not want your deck as high as possible, but roughly level with the balcony floor. Then the whole railing stands in front of you: the top rail at chest height, the bars straight ahead and the bottom rail down by your feet. Measure from the ground where the castors will stand, not from your front doorstep. A back garden can easily sit half a metre lower than the street, and that half metre quietly gets hired too.

Mobile scaffold erected along a side elevation to storey height, the reach a railing on the upper floor asks for

Hiring too tight shows up in your back. One deck position too low and you paint the top rail with your arms above your head while the paint runs into your sleeve. Stand too high and you finish the bottom rail bent double all day. A set with several platform positions solves that, because you can hang the deck at whatever height suits the coat you are on. For a balcony on the second floor that makes a real difference.

Hiring a mobile scaffold for a balcony railing: where it stands

The tower goes beside the balcony, not underneath it. Stand underneath and you have the balcony slab over your head and you are looking at its soffit instead of at the railing. Set the pitch just past the side of the balcony, so the railing runs along the edge of your deck and you can get at it from outside. Allow for the slab overhang while you build: you are going up alongside it, so leave a little play between the frames and the edge.

Under that pitch you want a flat, clear strip. The four stabilisers splay outwards and need room on every side, so reckon on more space than the scaffold itself occupies. Check what is in the way: a patio set, a water butt, planters, a bike rack or the lip of a raised terrace. On ground that falls away or on soft garden soil, the piece on setting up on uneven ground explains what to do.

Stabilisers splayed out at the foot of a hired tower, the room that has to stay free beside the balcony

At a flat or a portico block, settle the standing place in advance. The ground under a balcony is often communal, so tell the owners association that a tower will be there for a few days and that the passage gets narrower. That spot stays occupied for the whole hire period, because shifting the pitch in between costs you more time than the painting does. What else comes with such a building is set out in the article on scaffolds at an apartment block.

How many days to hire a scaffold for a balcony railing

A balcony railing looks like an hour of work and never is. Every bar has a front, a back and two narrow sides, and between the bars you get in only with a slim brush. Then there is the preparation: degreasing, rubbing down, touching in loose patches and rust pits and cleaning out the bottom rail where the dirt collects. For an average railing of three to four metres you therefore hire a scaffold for three days, and four if the railing turns the corner.

Those days contain hours in which you can do nothing at all. The primer has to harden before the topcoat goes on, and a metal railing is wet with dew early in the morning while it looks perfectly dry. So you paint in the middle of the day, on a dry surface and with no showers forecast. That rhythm sets your hire period far more firmly than the number of metres does, and it is why the tower stands there a night or two with nobody climbing it.

Tower erected along a modern elevation, standing through the hire days while coats of paint dry on the railing

When you book, that works out in your favour. The cost sits at the front: the first 24 hours are charged in full, and every hire day after that has 95 per cent taken off. Building in a day of slack costs you very little, while a half painted railing without a scaffold can cost you a week. Put your end date well after the day the last coat goes on. What a roomier period does for your planning is set out in the guide to hire days.

Which mobile scaffold suits painting a balcony railing?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting the balcony railing from a 245 cm platform

A 245 cm platform covers a little over two metres of railing per pitch. On a balcony railing of three to four metres that means two pitches for each coat, and on a corner balcony the short side comes in as a third. Work one bay between two posts at a time and finish that bay completely before you move on, so the joint always falls on a post and never halfway along a bar. It also tells you exactly where you left off after a drying break.

The division of the work is simple: everything facing outwards you do from the mobile scaffold, everything facing inwards from the balcony itself. Do those two sides shortly after one another, because paint that is already setting leaves a visible line where the two halves meet. Never reach around the corner of your deck for the next bay either: that saves you a move of two minutes and can cost you a great deal more than that.

Working platform of a rented tower along a facade, the 245 cm pitch you shift bay by bay along the bars

Take up what you need for one pitch and no more: a small kettle, two brushes, a cloth and abrasive paper. Before you wheel the tower along, clear the deck completely, including the kettle you put down for a moment. Do not underestimate the number of bars, because that figure sets your pace and with it the number of days you hire. If the whole balcony is being tackled in the same go, look at the page on balcony work on the whole structure.

Scaffold hire for a balcony railing: delivery, build and collection

The mobile scaffold arrives in parts: frames, decks, braces and castors, counted and complete. Point out in advance where that stack may lie, because you keep the strip beside the balcony free for the pitch itself. A front garden, a drive or a piece of pavement works better, certainly if the frames still have to go round the back afterwards. Booking before 15:00 on a working day means the set comes out to you the next working day, so you can decide fairly late.

You choose the delivery day and the collection day yourself, and with paintwork you let the forecast decide. Have the set arrive a day before your first painting day: assembly takes half a day and after that you want to start rubbing down straight away. You put the tower up yourself, preferably with two of you, with the manual to hand and the instruction video on your phone. Which part goes on when is covered in the step by step build.

Scaffold parts laid out neatly on the pavement, the counted set as it is dropped off on your delivery day

Collecting the set yourself is possible too: by appointment it stands ready free of charge at Zeeburgerpad in Amsterdam, provided your vehicle takes the length of the frames. If you have it delivered, we come back for it after your last coat. You break it down and put everything complete on the agreed spot so the driver can load in one go. The rate for bringing and fetching differs per province and is listed in the overview of delivery costs.

Working safely on the scaffold beside a balcony railing

You stand on a platform built to EN 1004 and rated in load class 3, good for 200 kg per square metre. Painting a balcony railing you are nowhere near that with a kettle of paint and a few tools, so the weight is not your worry here. What does count is that the pitch stays stable while you work sideways along the railing. What that class actually stands for is explained in the article on this scaffold standard.

The balcony railing itself is no support. You do not lean the tower against it, you do not pull yourself up on it and you do not push the pitch straight with it: a railing that is due for painting is often exactly the railing whose fixings have gone. Do not step over your guard rail onto the balcony either. Brake the castors as soon as you climb on, and move the tower only with an empty deck and nobody on board.

Assembled tower reaching first floor level in a side passage, its deck the height a railing job asks for

The risks in this job sit in the gap and in the height. Between your deck and the balcony edge there is always an opening a brush or a kettle can fall through, so keep the ground below clear and warn the people on the terrace underneath. On an open corner of a building there is more wind than you feel below: stop when it picks up. Which rules apply beyond that is set out in the rules for working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a balcony railing

1

Measure the narrowest gate or passage on the route to the balcony before you book. If the 75 cm set will not go through, you are left standing with the parts in the front garden on delivery day.

2

Set the tower half an arm's length back from the railing. With your nose against it you cannot see the bottom rail, and standing too far off means leaning forward all day long.

3

Hang a sheet of plastic over the balcony floor before you start on the outer face. Drips from the top rail otherwise land on the tiles or on the terrace below, and cleaning that up costs half an afternoon.

4

Do the degreasing and the rubbing down on the day you build the tower. You are up there anyway, and you win a whole hire day because you can prime first thing the next morning.

5

Chalk where the castors stood for each pitch. For the second coat you wheel the scaffold back to exactly the same place and your joints line up neatly on the posts of the railing.

6

Set your collection date one day after the final coat. You can then take the tower down without brushing past fresh paint, and you keep time over to count all the parts.

Frequently asked questions

Frequently asked questions about painting a balcony railing

Which mobile scaffold do you hire for painting a balcony railing?+

Take the RS51, the build that is 75 cm wide. It goes round the back through a gate and along a narrow path beside the fence, and at a railing you stand close to your work anyway, so a wider deck buys you little. If two of you are working, or you are tackling more of the balcony in the same go, the wider RS52 is worth considering. Either way, measure the narrowest passage before you book the tower you want to rent.

How does hiring a mobile scaffold for a balcony railing work, from booking to collection day?+

Online you pick the model, the working height and the days you want it for, at a fixed price with VAT included. We drop the parts off on the agreed day, you build the tower beside the balcony and paint your railing within the booked period. At the end you take it apart, put everything together in one place and we carry it off again. The only thing that really has to be timed is the moment your first coat goes on.

How many days do I need to hire a scaffold for a balcony railing?+

For an ordinary railing of three to four metres you land on three hire days: one to prepare, one to prime and one for the topcoat. If the railing carries on round the corner, or there is heavy rubbing down to do, reckon on four. The painting itself goes quicker than expected, but the time between coats cannot be made up and the hired tower stands there through all of it. Book a day too many rather than a day too few.

What does it cost to hire a scaffold for a balcony railing?+

What you pay follows from the model and the height you choose, plus a fixed amount for bringing and fetching in your province. That rental price is shown with VAT included on the page with the rate per scaffold, before you commit to anything. With railings the structure of it is pleasant: after the first hire day an extra day hardly adds up. Finishing a balcony railing calmly in one go therefore beats two short hire periods.

What working height should I hire for a balcony railing on the second floor?+

If the top rail sits at around 6 metres, hire 6 to 8 metres of working height so you can hang the deck level with the balcony floor. You measure from the surface under the castors to the top of the railing, and a sloping garden counts in that measurement. Which mobile scaffold belongs to which height is set out on the page with all working heights. If you fall exactly between two sizes, take the upper one.

Can the hired scaffold be delivered for a balcony at the back of the house?+

Yes, we drop the parts at your address and you carry them through to the back yourself. Bear that in mind: the longest frames have to pass down the hall or through the gate, and with two of you it is half an hour of humping. If the back garden is reachable only along a narrow path, the 75 cm tower stays the only sensible choice. Agree where the driver may leave the set in case you are not at home.

Do you put the scaffold up when I hire it, or do I do that myself?+

Assembly belongs to your side of the job. We bring the mobile scaffold as a counted set of parts and take it away again later, but putting it together, shifting it and taking it down is yours; the manual and the video show the way. With a second person a pitch for a balcony railing stands within half a day. We do not deliver assembled, and facade scaffolds and cherry pickers are not in the range.

What if the job overruns and I want to hire the scaffold a few days longer?+

Let us know the moment you see it coming, and we move the collection day, provided the tower is still free afterwards and not down on someone else's booking. Painting outdoors rarely runs to plan: a wet morning or an unexpected shower easily costs you half a day. To stay ahead of that, book one extra day when you hire, because handing the set back early is always allowed. Then you never have to stop with a railing that is only primed.

How much room do you need beside the balcony to hire a scaffold here?+

Work from the width of the tower, plus what the stabilisers stick out all round, plus a strip of walking room for your kettle and your tools. In practice that is a flat piece of ground a couple of metres wide beside the balcony. If a patio set, a water butt or bicycles are standing there, move them before the delivery day. Reserve a place for the stack of parts as well, because it lies longer than most people expect.

Can I keep the mobile scaffold on hire if it stays too wet to paint?+

The tower simply stays where it is; only the painting shifts. A railing wet from rain or from dew will not take the paint properly, and you notice that only once the coat has dried. Use such a day to rub down, to degrease or to do the inside face from the balcony, and pick the painting up again the next day. Because you set the collection day yourself, that delay costs you at most one more day of hire.

Do I get the deposit back after hiring a scaffold for this railing?+

Yes, you pay a deposit when you hire, and as soon as the complete set has been counted back in and found in order the amount is on your account one working day later. With paintwork, watch two things: hand back every part you were given, and leave no dried splashes on the decks and the frames. An old sheet over the platform saves you that cleaning. The rest is explained in the piece on the deposit.

May I stand the mobile scaffold on the balcony itself instead of beside it?+

Rather not. A balcony floor is not made for the point load of four castors with a tower on top, and up there you have no room to set the stabilisers out either. On top of that, from the balcony you never get at the outer face of the bars, which is precisely the part you are renting for. So put it on firm ground alongside. Working on a roof terrace? Read about a scaffold on a balcony or roof terrace first.

Hire a mobile scaffold for painting a balcony railing today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.