See your price
Application

Balcony work? Choose the right scaffold.

Balcony work is about the whole structure, not just the railing on it. You have to get at the underside of the slab, at the nosing that projects all round and at the outlet, and those are precisely the places you never reach from the balcony. For that you hire a mobile scaffold of only 75 cm across, so it fits under the slab as well as beside it, with 4.2 to 6.2 metres of working height. Below you read which size fits, how many hire days this takes and where the pitch goes.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For balcony work we recommend the Narrow mobile scaffold.
  • For balcony work you hire the RS51 of 75 cm, good for 4.2 to 6.2 metres of working height at a first floor balcony.
  • You put the tower down twice: under the slab for the soffit and the outlet, beside it for the nosing and the railing.
  • Under a concrete slab your reach counts for nothing, which is why you rent a set that stands one notch higher.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job4.2 to 6.2 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for balcony work?

Safe, stable and professional work at height

With balcony work most of the job sits on the side you never see from indoors. The underside of the slab flakes, the nosing crumbles along its drip edge and around the outlet the water lingers longer than it should. From the balcony you cannot get there, and propping a ladder against it does not help, because working above your head asks for two hands and a solid floor. Renting a tower gives you that floor, at exactly the height where your arms still have force in them. The rest of the choice is about the clear height beneath the slab, the ground under it and the days your mortar and coating need.

  • Soffit, nosing and outlet need a pitch underneath
  • Reach counts for nothing once you work under concrete
  • Working height 4.2 to 6.2 metres under a balcony
  • Four to five hire days because repairs must harden
Read more about working safely →

Which mobile scaffold to hire for balcony work below the slab

For balcony work the choice falls on the Altrex RS51, 75 cm across. That narrow base is decisive here, because the pitch has to end up under the slab, where a low garden wall, a border edge or the corner of a shed is usually in the way. The narrower the foot, the closer to the wall beneath the balcony you can bring it. All the widths on offer sit with the mobile scaffolds you rent from us, ready to hold against your own situation.

The platform length of 245 cm is good news for this job. An ordinary balcony slab is three to four metres wide, so a single pitch already puts the greater part of the soffit above you. You shove the tub of mortar or coating along with your feet as you shuffle sideways, which beats climbing down and up again when everything happens overhead. A 135 cm deck adds nothing to that and fits beneath the slab far less often.

Slim 75 cm hire set laid out on block paving, narrow parts chosen because the footprint has to go under a balcony

The wide RS52 comes into view when two people are under the slab at once, or when you bring in sheet material and props. A room scaffold drops out, because that model is meant for indoor work and never reaches this far. A ladder drops out as well, since balcony work means both hands above your head. What a tower at this kind of structure involves is set out in the piece on scaffolds at balconies and roof terraces.

Working height to hire for balcony work under the slab

With the balcony on the first floor, the underside of the slab sits at around three metres and the top of the railing at around four. A working height of 4.2 to 6.2 metres belongs with that, the range in which a narrow tower still stands comfortably. The number you order is not the height of your feet: about 2 metres of reach is added to the height of the deck, and the two together are called working height. What that build looks like is shown on the page for towers reaching 6 metres.

Beneath a balcony slab that sum stops working. You do not reach two metres upwards there, because after half a metre your knuckles meet concrete. For the work under the slab you therefore reckon with the platform height and not with the working height: the deck has to come high enough for you to hold your arms up and still be comfortable. In practice that means renting a set one size larger than the top of the railing would suggest.

Tower built up against a front elevation with the deck at the height balcony work under the slab asks for

Choose too tight and you notice it at once. Standing low under the slab you work with straight arms above your head, your pace drops away and everything runs down your sleeves. If the highest deck position leaves you short of the nosing, you miss exactly the edge that most needs attention. Measure the clear height beneath the balcony beforehand, and if in doubt use the figures for the first floor as your starting point.

Where the mobile scaffold you hire for balcony work stands

Balcony work uses two kinds of pitch. The first stands under the slab, deck just below the concrete, and you need it for the soffit, the outlet and the joint with the wall. The second stands just beside or in front of it, so that the nosing and the railing lie in front of you instead of above you. Count on shifting the whole tower at least once during the job, and keep clear ground available at both places.

That ground has to be level and the stabilisers have to swing out on four sides. Under a balcony that is harder than beside it: there you often find a cycle store, a border, a shed or the very rainwater gully where a foot now has to go. Look at the clear height too, because you build up to just below the concrete and still have to tilt the top parts into place. On loose or falling ground the explanation of stabilising a mobile scaffold helps.

Stabilisers of a mobile scaffold swung out on the street, the footprint a pitch under a balcony needs

In a block of flats the strip under the balcony is usually communal ground. Tell the manager or the residents committee that a pitch is going up and how many days it stays, certainly where a footpath or a bike store runs past. Ask the neighbour above not to mop the balcony for a while either: whatever goes over the edge lands on your fresh coating. Those arrangements are better made before the tower is delivered than on your first working day.

How many days to rent a tower for balcony work

Balcony work is hardly ever a single operation. You start by cleaning and hacking away loose concrete, you repair the nosing and the drip edge, you make good the soffit, you tackle the railing and finally you check the outlet. Each of those steps asks for its own pitch and its own waiting time. For one balcony you therefore rent a tower for four to five days, and with two balconies above each other you can safely add another two.

The waiting time is in the material, not in you. Repair mortar has to harden before coating can go over it, and a coat on the soffit needs drying while no dust may blow up from below. On top of that, work above your head goes more slowly than you are used to: your arms tire sooner and you cover smaller areas. Plan in half days rather than in hours and your hire period will still be right at the end.

Tower erected at a modern building, left standing through the hire days while repairs to the slab cure

For the booking that turns out well. You pay the full rate only over the first day, and every following day of the hire period has 95 per cent knocked off it, so an extra hardening day weighs almost nothing. What you do feel is a scaffold collected too early while the nosing is not finished. How many days other people allow for this sort of job is set out in the overview with guidance on the length of a hire.

Which mobile scaffold suits balcony work?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Balcony work from a 245 cm platform: underneath and alongside

Under the slab you work in strips. With a deck of 245 cm you have a good two metres of soffit above you per pitch, and on an average balcony that is most of it in one go. Finish each strip completely, from the wall out to the nosing, and only then move along. That keeps you on top of what has already been repaired, because seen from below a half treated slab looks finished long before the corners are done.

After that the tower goes outwards, to the pitch alongside. From there you do the nosing, the drip edge and the railing, and the work feels entirely different: you look straight at it and can simply carry on sideways. Save the outlet for the moment you are still standing underneath, because flushing it through is better done before the new coating is in place. Every move costs a quarter of an hour, so set the order down on paper first.

Mobile scaffold against a side wall with the 245 cm deck that you shift along during balcony work

Take up only the material you will use in the next half hour. Working above your head means every surplus comes back on your sleeve or on the deck, and a full bucket does nothing but stand in the way. Safety glasses and a cap are no luxury on this job. If only the railing is going into paint and the slab is left alone, look instead at the page about painting a balcony railing.

Renting a mobile scaffold for balcony work with delivery

A complete set is dropped off, every piece counted: uprights, decks, braces, guard rails and castors. Pick a place for that stack in advance and do not put it under the balcony, because the first pitch belongs there. A drive, a parking bay or the edge of the garden works better and saves you dragging things later. Order on a working day and stay under 15:00, and the delivery can be with you the next working day rather than a day later.

You decide yourself on which day the set arrives and when it goes away again. With balcony work you tie that to the repair sequence: build first, then hack and make good, and only afterwards coat. The assembly is yours to do, with the manual in the set and the video that runs through the steps. Under a balcony, remember that you cannot lift the top parts straight up, so fix your deck height before you begin stacking.

Scaffold parts delivered on site in a counted set, the way a tower for balcony work arrives with you

Collection by appointment is possible as well, free of charge, at Zeeburgerpad in Amsterdam; for that you need a vehicle the longest tubes will go into. If you choose to have it brought, we come back for the set when you have finished. You take the pitch apart and lay the parts out complete at the agreed spot. What bringing and fetching costs in your province is listed with the rates for delivery and collection.

Working safely under a balcony slab on a hired tower

The deck you stand on falls in load class 3 within EN 1004, which means every square metre carries 200 kg. With balcony work you come nearer that figure than with painting, because a bucket of repair mortar, a bag of material and two people soon add up. Spread the weight over the deck and do not leave hacked off lumps lying until there is a heap. What the class means in practice is covered in the article on load and weight on a mobile scaffold.

The balcony structure is no part of your tower. You do not fix the pitch to the railing, you do not prop it against the slab and you do not climb over the rail onto the balcony. Brake the castors the moment you step on, and move the scaffold empty: no buckets on the deck and certainly nobody riding along. Walk round all four stabilisers after every move, even when you have gone no more than half a metre.

Narrow hired tower assembled between a brick wall and a hedge, a separate sliding ladder resting against the same wall

Here the risks are above you and below you. Hacking and brushing at the soffit brings all sorts of things down, so wear goggles and keep the zone under the deck empty. Warn the people who have to pass, especially at a shared entrance or a bicycle store. And stop in strong wind: under a balcony it feels sheltered, yet on the corner of the building the wind still pulls through. The further arrangements are at the rules on working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for balcony work

1

Measure the clear height under the balcony slab before you book a set. Your deck has to fit just below it, and that figure decides the build you hire better than the height of the railing does.

2

Spread a sheet over the ground beneath the pitch before you start hacking. Concrete rubble and coating leave stains on paving that no amount of scrubbing will get out afterwards.

3

Flush the outlet through while you are standing under the slab anyway. It is a five minute job that you would otherwise have to organise all over again once the tower has gone.

4

Put the order of your pitches on paper: underneath first for the soffit and the outlet, alongside afterwards for the nosing and the railing. That way you move the tower once instead of four times.

5

Fill your tub only half full when everything happens above your head. Whatever is too much on the brush ends up on your arm, on the deck and finally on the paving under the scaffold.

6

Ask the neighbour upstairs to leave the plants unwatered for a few days. Water running down the face of the slab arrives exactly on the section you have just made good.

Frequently asked questions

Frequently asked questions about balcony work

Which mobile scaffold should you hire for balcony work on the underside of the slab?+

The RS51 at 75 cm wide is the logical answer, because that narrow foot still gets you under the slab and past whatever stands around it. The deck holds a tub and your tools, and with everything happening above your head you would not take more up anyway. Working with two people or with heavy material, you can rent the wider RS52, provided it fits beneath the balcony. Measure the clear space on the spot where the tower will stand first.

How does renting a mobile scaffold for balcony work go in practice?+

You choose a model and a working height online, pin a delivery day and a collection day and fix that at a set price including VAT. We drop the complete set with you, you build it under the balcony and work through the slab, the nosing and the railing. When you are done you dismantle the tower and gather the parts, after which we take them away again. Booking is best done as soon as you know when the repair starts.

How many days do I have to hire a tower for balcony work?+

For a single balcony you usually sit at four to five hire days. That is not because the work takes so many hours, but because mortar has to harden and a coating on the soffit has to be dry before the next layer goes on. If the railing is coming along in the same round, add a day. Better a day of slack than standing with a half repaired nosing and no scaffold on site.

What does hiring a scaffold for balcony work cost, and how does day two work?+

The rental price is set by the tower you need and by how high it must reach, plus what bringing and fetching costs in your province. All the rates stand with VAT included at the prices per mobile scaffold. The bulk of it is paid for the first day; the days you put behind it count for only a fraction. With balcony work and its hardening times that suits you, because those waiting days are exactly the cheap ones.

What working height should I rent when I work under a balcony?+

For a balcony on the first floor you rent a build that reaches 4.2 to 6.2 metres of working height. More important than that figure is the platform height: under the slab you work with your arms up and never use your reach, so the deck must come just below the concrete. Measure from the ground to the underside of the slab and add the height of the railing. The page about working heights shows which tower matches.

Can the mobile scaffold be delivered if the balcony faces an inner courtyard?+

Yes, we unload the set at the address you give and you carry the parts through to the courtyard. Do say where the van can stop when you book, because an inner courtyard is sometimes reachable only through a gate or a passage. Reckon on half an hour of carrying with two people. If you cannot be present, name a place where the driver may leave the scaffold parts safely.

Do you erect the scaffold for balcony work, or do I hire it unassembled?+

You hire it as a set of parts and put it together yourself. With balcony work that needs extra thought, because you are building under a slab and cannot raise the top sections straight upwards. Decide your deck height before you start stacking. The manual and the instruction video walk you through the steps. Delivering a tower ready built is not part of our hire, and neither are facade scaffolds or cherry pickers.

What if the repair overruns and I want to rent the tower for longer?+

Call or mail as soon as you notice you need more time and we shift the collection day to match, provided the scaffold has not been promised elsewhere. With balcony work that happens regularly: hacking into an old slab often brings more away than the first day suggested. Anyone wanting to head that off books a spare day at the outset and hands the set back early if it is not needed.

How much room do I need under the balcony to hire a scaffold there?+

You need the footprint of the tower plus the swing of the stabilisers all round, and that is more than the 75 cm of the deck. The clear height counts as well: under the slab you still have to place the last parts. If bicycles, planters or wheelie bins are standing there, take them away before the delivery day. Where the strip really is too tight, you end up working from the side and the job takes longer.

Can I carry on hiring if it is too cold or too wet for repair mortar?+

The tower can stay standing even when the work lies still for a few days. Repair mortar and coating make demands on temperature and on a dry surface, and under a balcony things dry more slowly than on an open wall. Use such a day for hacking, brushing or rubbing down the railing, because that sort of work usually carries on. Since you fix the collection day, a delay costs you only those extra hire days.

Do I get my deposit back when I hire a mobile scaffold for balcony work?+

You pay a deposit at the start of the hire, and it is transferred back one working day after the set has come in and been counted. With this job the thing to watch is mortar and coating residue: once dried on decks and tubes, it will not come off later. Lay a piece of sheeting or cardboard on the platform before you begin. The rest of it is set out in the piece on the deposit on a hired scaffold.

Can I put the tower on the balcony below instead of on the ground?+

That is not a good idea. A balcony floor is not calculated for the point load of a scaffold with material on it, and you cannot set the stabilisers out properly up there. The slab you would be standing on is often the very one due for repair as well. So put the tower you rent on firm ground and work upwards from there. Unsure about the bearing capacity? Ring our hire staff for a moment.

Hire a mobile scaffold for balcony work today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.