See your price
Application

Replacing shutters? Choose the right scaffold.

Replacing shutters starts on the ground, with a tape against the opening and a new leaf you will shortly have to lift two handed. Once the pair sits above the ground floor you want a flat deck beside you, somewhere that leaf can rest while you set the fixings into brickwork. So you hire a mobile scaffold, the RS51 at 75 cm wide, in the build reaching a working height of 6 to 8 metres. Further down: why that model suits, how many hire days to book and which strip must stay clear.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For replacing shutters we recommend the Narrow mobile scaffold.
  • Above the ground floor you hire the RS51 for replacing shutters, a mobile scaffold whose 75 cm width still clears most gateways.
  • The replacement leaf travels up with you, so you want a deck where it can stand on edge against the guard rail.
  • Reckon on two hire days per elevation: old leaves down, ironwork out of the brickwork, repairs, then the new pair hung.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for replacing shutters?

Safe, stable and professional work at height

With replacing shutters it comes down to two things a ladder handles badly, namely accurate setting out and lifting. New pintles or hinges have to land in the masonry to the millimetre, and you only drill straight when you stand still and your weight is not spread over rungs. Every leaf carries weight too, and that weight hangs off your arms at the moment you lower it over the pins. Hiring a mobile scaffold for this job gives you a deck you can crouch on, measure from and park a leaf on in between. That saves mistakes in the sizes, and it saves hire days, since you are not descending for a rule or a different plug every few minutes.

  • Survey each window opening before the scaffold arrives
  • Every shutter leaf goes up under your arms
  • Drilling the wall needs a deck standing dead still
  • Working height of 6 to 8 metres upstairs
Read more about working safely →

Which mobile scaffold to hire for replacing shutters on a house

For replacing shutters the choice lands on the Altrex RS TOWER 51, a mobile scaffold measuring 75 cm across. Leaves nearly always hang on the street side or on a side elevation with a narrow path beside it, and 75 cm is the width that still slips past a planted strip, a gateway or a bicycle rack. That this model runs on to 14.2 metres in the hire fleet says nothing about your own build: for leaves on the first floor you order the range that lands at 6 to 8 metres.

Up on the deck this job asks for more room than paintwork does. The moment the old leaf comes free it has to go somewhere, the replacement is already waiting, and beside those two stand your drill, a box of plugs, a level and a folding rule. A narrow deck copes with that perfectly well, provided you set a leaf on edge against the guard rail instead of laying it flat. Which other models stand ready is set out in the mobile scaffolds we hire out.

Mobile scaffold built up against a house at the level of the upper windows, the position you hire for shutter work

Where the job involves large solid timber leaves that two of you take down together, the wider RS52 at 135 cm is worth a look. You gain deck to lay a leaf flat and to work side by side without catching each other's elbows. The drawback shows up when you carry the parts round the back, since they no longer pass a tight gateway. Both widths sit alongside one another in this explanation of scaffold dimensions.

Which working height to hire when the shutters sit upstairs

What you measure to when replacing shutters is not the head of the window but the upper pintle that has to go into the wall. It sits a fair way above the frame, and you want to stand square to it with a drill in your hands. Measure from the level where the wheels will come to rest up to precisely that point, and add nothing for a roof edge you never have to reach. That figure is the one you fill in when you reserve.

The sum behind it is short. Your platform height plus about 2 metres of reach is what the trade calls the working height, and that combined figure is what you book. Pick 6 to 8 metres and the deck sits at 4 to 6 metres, which puts the window frame at roughly waist level. That is exactly the stance from which you can hold a leaf steady and still judge whether it hangs true. You will find the matching build set out where a reach of eight metres is explained.

Mobile scaffold standing at a front elevation beside the upstairs windows, the reach a shutter change asks for

Underestimating punishes you here. Half a metre short means drilling the top holes above your head with your arms out straight, and that is precisely when a masonry bit wanders off into a soft joint. A moment later the same leaf has to go over that upper pin, hands above shoulder height and the full weight hanging on your arms. Hiring generously costs almost nothing; rebuilding costs a morning. For shutters on the first floor of a house this range is enough.

Where the scaffold stands while you are replacing shutters

The tower ends up directly beneath the window opening, and on a dwelling that is usually the tightest strip available. Think of a pavement with a cycle rack, a front garden full of climbers, a sill lined with pots, or a drive that falls away towards the road. Before you hire, check that a flat, firm strip remains under every pair of leaves, wider on all sides than the build itself, because the four stabilisers splay outwards at an angle.

A planted border or a layer of loose gravel deserves extra attention. If a wheel sinks, the build stands out of plumb, and holes drilled out of plumb only announce themselves when the new leaf hangs skew. Lay stout boards under the wheels where you must, and check with a level that everything really is square before you make the first hole. Getting a build steady on ground that falls away is covered in the article on anchoring and stabilising.

Stabilisers folded out at the foot of a mobile scaffold, setting the build square and still beneath a window opening

Set aside somewhere for the leaves themselves as well. The old pair comes down and has to go somewhere, the new pair is waiting and must not sit in the rain or lean against a wall where it can topple. Two trestles in the front garden, or simply a tarpaulin spread out on the drive, will do, as long as it all lies outside the walking route around the base. Then you never have to steer round your own materials with a leaf in your arms.

How many rental days to hire for replacing shutters

Unscrewing a pair, measuring up, drilling and adjusting costs half a day per window once the first two are behind you. On an elevation with three or four openings that already comes to two days, and nothing has gone wrong yet. Where old ironwork is seized into weathered brickwork or the holes have broken out, repair work joins the list. So hire the tower per elevation rather than per window, and put your days in the diary back to back.

Inside that period sits waiting time you cannot make up. If old holes have to be filled with mortar or a chemical anchor, the new pintle may only take load once that has gone hard, and how long that takes is down to the product you use. Weather counts as well: drilling dust and a wet wall go together badly, and a leaf with fresh finish is better hung dry. Allow a day of slack in the period you give us.

Mobile scaffold assembled along a side elevation, the build that stays up for the full run of hire days

Taking that slack costs little. You pay the whole day rate once, for the opening twenty four hours, after which each additional day of hire is reduced by 95 per cent, so a spare day barely registers beside the transport. Booking too tight does cost something real: if the van is at the kerb while a leaf still hangs off a single pin, you have a problem. Working out a realistic figure is covered in this piece on counting hire days.

Which mobile scaffold suits replacing shutters?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Replacing shutters from a working platform of 245 cm

A platform is 245 cm long. On this job that amounts to roughly one window opening with a leaf on either side, plus the room to step past it yourself. Finish a window completely before you move: leaves off, ironwork out, holes made good, new pintles in and the replacement pair hung. Move halfway and you will be lining up all over again, and that is where errors creep in. Three or four separate positions per elevation is entirely normal on this work.

Gather everything you expect to use at ground level, because climbing down while holding a leaf is not something you do twice. Up onto the deck go a drill with a masonry bit, the plugs, the screws, a level, pencil and folding rule, and a small tub for the ironwork you unscrew. A heavy leaf goes up separately on a rope, or you pass it from below to someone already waiting on the platform. Carrying it as you climb is not an option.

Erected mobile scaffold with a flat working deck along a wall, the position you shift from one opening to the next

What catches people out is the setting out of the old ironwork. The spacing between the pintles of the existing leaf rarely matches exactly what you have bought, and left and right are often not interchangeable. So survey every window separately before the scaffold stands there and write the sizes down. Otherwise you are offering things up at height and measuring while the hire period simply runs on, and that is the dearest place to find out.

Hiring a mobile scaffold with delivery for a shutter job

Nothing turns up assembled: you receive a counted stack of loose parts at your address. Decide beforehand where that stack may land, because the strip right beneath the windows stays reserved for the leaves themselves. A drive, a piece of lawn or the spot beside the front door works better than the narrow pavement where the build will later stand. Book on a working day, keep it inside the 15:00 cut off, and your parts land the following working day.

Both the arrival day and the date on which everything leaves again are yours to set. When replacing shutters it pays to have the parts brought a day ahead of your first working day: you assemble unhurried, you see straight away whether you have landed at the right height, and only the following morning do you unscrew the first leaf. Building it is your side of the bargain, done with the printed manual open and the instruction film running. Half a day with two of you covers it.

Scaffold parts set down on the kerb outside a dwelling, the counted set you build up and take apart yourself

Once the last leaf hangs, you take the build apart and put every part outside complete, so that we can collect it. Count as you dismantle and you spot at once whether a clamp is still lying among the discarded leaves on the drive. Set your collection day one day behind that last leaf and you keep a morning in hand for clearing up. What the outward and return trip costs depends on your province, and the amounts sit with the charges for delivery and collection.

Safety on the scaffold you hire for replacing shutters

Everything in the hire fleet is built to the EN 1004 standard in load class 3, so each square metre of deck carries 200 kg and no more. Replacing shutters brings you nearer that ceiling than you would guess, because two people, a drill, a tool bag and a solid timber leaf all count together. Send the new leaves up singly rather than the whole set in one trip. See also what load and weight mean on a tower.

Beyond that the standing arrangements apply. Lock the wheel brakes before you climb on, never roll the build a metre sideways with anyone or anything aboard, and set all four stabilisers out afresh after every move. In strong wind you stop earlier on this work than on other facade jobs: a leaf lifted one handed behaves like a sail in the gusts, and you feel that in your wrists before your feet. Waiting is then the only sensible course.

Assembled mobile scaffold showing its guard rail and internal climbing frame, the route up when you carry shutter ironwork

Two risks belong specifically to replacing shutters. The first is falling tools, since you are working with screws, bits and ironwork straight above a pavement where people walk past: rope that zone off and keep small items in a tub. The second is the leaf itself, which you should never manoeuvre over the guard rail single handed, however convenient it looks at that moment. Pass it down, or lower it on the same rope that took it up. The wider arrangements sit at the rules for work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for replacing shutters

1

Survey every window on its own before you hire the tower: width, height and the spacing between the pintles. Two openings that look identical differ by a centimetre in an old wall.

2

Pencil on the back of each new leaf which window it belongs to and which side it hangs. Offering leaves up on the deck wastes time, and left and right are seldom interchangeable.

3

Haul a heavy leaf up on a rope instead of carrying it under your arm as you climb. Both hands stay free and the weight lands on the tower more tidily.

4

Drill the upper hole first and hang the leaf provisionally on that one pintle. You can then line it up and only afterwards mark the lower hole, without measuring anything in mid air.

5

Take a magnetic tray or a small tub up for plugs, screws and old ironwork. Anything you let roll off up there lands on the pavement, where a neighbour usually parks.

6

Ask for your collection day one full day after the final leaf goes back on. That gives you an unhurried morning to cart the old shutters off and to dismantle the hired tower complete.

Frequently asked questions

Frequently asked questions about replacing shutters

Which mobile scaffold do most people hire for replacing shutters?+

For shutters on the first floor you take the RS51 tower: at 75 cm across you still get past a front garden strip, a gateway or a parked row of bicycles, and under a window opening that is often all the space there is. Taking down large solid timber leaves with two people works more pleasantly on the wider RS52 at 135 cm, because a leaf can lie flat there. Walk your route to the wall and measure the tightest point before you hire.

How does hiring a scaffold for replacing shutters actually work?+

You pick a model and a build height online, add a delivery day and a collection day of your own choosing and settle a fixed amount including VAT. The parts arrive at the agreed address, you assemble the tower and take your shutters off and on, and on the final day everything stands outside dismantled and counted. We drive it away afterwards. The one thing to have sorted in advance is the survey of the windows, because you want that behind you before the hire period starts running.

How many hire days does a set of shutters on one elevation take?+

Two hire days is realistic for an elevation with three or four windows. Each window takes half a day of unscrewing, measuring, drilling and adjusting, and the old ironwork still has to come out of the wall. Where holes have broken out or mortar is going in, add a day, because you have to wait before the new pintle can be loaded. Working several elevations means an assembly and an extra day with the scaffold per elevation, since moving takes longer than people think.

What does it cost to hire, and why is day two so light?+

Two things drive the figure: which model goes on your order and how high you assemble it. Bringing and fetching sits alongside that as one fixed amount per province. The rental price of each tower appears with VAT included on the page of hire rates, so nothing is a surprise at checkout. That structure is kind on this job: day one carries the weight and what you add behind it barely counts. One generous booking therefore beats two separate periods, certainly if the scaffold would be standing there anyway.

Which working height should you hire for shutters on the first floor?+

Order the 6 to 8 metre build, and the deck of the tower ends up somewhere between 4 and 6 metres. Measure not to the gutter but up to the topmost pintle that has to enter the wall, counted from the level where the wheels come to rest. Where the pavement lies lower than the doorstep, carry that difference into your sum before you order. Which range belongs to which scaffold in the hire fleet is shown on the page about working heights.

Is the hired scaffold delivered, or do you collect it yourself?+

Both routes exist. Choose delivery and the parts are dropped at the house on your chosen day, then taken away again once the last leaf hangs, for an amount fixed per province. Driving over is allowed as well: by appointment you collect the hire set free of charge from Zeeburgerpad 89 in Amsterdam, provided a van or trailer is standing ready that takes the length of the uprights. Most people still have the tower delivered here, because the drive must stay clear for two sets of leaves.

Does erecting come with the hire of this mobile scaffold?+

No, putting it together belongs to your work. We drop the parts and take them back afterwards, while assembling, repositioning and dismantling are yours, with the step by step guide and the video to hand. Two of you will be busy for half a day, and that half day belongs in your schedule as working time. You will find no facade scaffold, system scaffold or cherry picker in our hire fleet, which is why shutters at this height are handled from a mobile scaffold.

Can I hire for longer if replacing the shutters overruns?+

Ring us the moment it becomes clear the work will run over, and the collection day shifts back with it, provided nobody else is booked onto this tower straight after you. Overruns are common on shutters, usually because an old pintle is seized solid or the sizes of the new pair are fractionally out. To get ahead of that, count an extra day in when you hire. Handing back early is fine too, so booking generously costs you nothing but a line on paper.

How much room does the hired tower need under a shutter opening?+

On top of the width of the build comes whatever the stabilisers take up on either side, and then you set aside a strip for the old and the new pair of leaves. Reckon on a couple of metres of level, load bearing ground beneath the whole footprint. If a planter, a cycle rack or a water butt sits directly under the window, clear it before the scaffold is delivered. Shoving a half built tower about can easily swallow an hour of your hire.

Does the hire simply continue on a day when the wind is too strong?+

The tower may stay standing; only the hanging gets postponed. A leaf you lift catches the wind like a sail, and that is not something to experience with your arms extended at six metres. Spend such a day measuring at ground level, chiselling old ironwork out of the wall or preparing the new leaves on trestles. Because the end date is in your hands, a shift like that stays limited in practice to one more hire day, and that one weighs light.

How is the security sum handled after the hire ends?+

A deposit goes with the reservation, and the sum is back with you within 1 working day of return, as soon as the complete tower has been counted through. On this job that means watching the small items: a clamp or a brace lying among the discarded leaves on the drive does not count once the van has left. Walk the parts through while you dismantle the hired scaffold. How the rest of it runs is explained in this note on getting the money back.

Should I hire the same scaffold for replacing shutters as for painting them?+

The model is the same, the use is not. With painting a set of shutters you work light: brush, abrasive paper and a tin, and you shift the tower more often because you progress panel by panel. Replacing sends weight upwards, presses a drill against the wall and demands a build that stands genuinely motionless. So when you hire a scaffold for this job you look harder at the ground and at the stabilisers than you would for paintwork on those same leaves.

Hire a mobile scaffold for replacing shutters today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.