See your price
Application

Applying spray coating? Choose the right scaffold.

Applying spray coating moves fast as long as you never have to stop, which makes your choice of tower matter more here than it does with a brush. The pump stays on the ground, the hose travels upwards with you, and both hands are occupied at the top. For a two storey elevation you therefore hire a mobile scaffold only 75 cm wide, whose build carries you somewhere between 6 and 8 metres. Which model suits, how many hire days it takes and where the tower ends up are all set out below.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For applying spray coating we recommend the Narrow mobile scaffold.
  • For applying spray coating across two storeys you book the RS51: 75 cm narrow, with a reach somewhere between 6 and 8 metres.
  • The pump stays at the foot beside the tower, so allow ground for the machine and the four stabilisers together.
  • Reserve two to three hire days, since masking the windows and frames eats far more time than the spraying itself does.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for applying spray coating?

Safe, stable and professional work at height

With spray work the tower decides how smoothly you keep going. Every interruption to reposition shows up later as a join in the finish, so you want to cover as much wall as possible from one stand and then carry on calmly. Meanwhile a hose hangs off you running down to the pump, and it has to travel freely without catching under a wheel or against a stabiliser. A ladder answers none of that at all: you need both hands free and the ability to walk sideways. Hiring a tower for applying spray coating is therefore a matter of height, of clear ground at the foot, and of the number of days you put on the booking.

  • A narrow route through to the elevation itself
  • Pump left below, hose running up to the gun
  • A working height of 6 to 8 metres
  • As few repositions as the wall will allow
Read more about working safely →

Which mobile scaffold to hire for applying spray coating

For spray work on a two storey house the tower to hire is the Altrex RS51, no more than 75 cm across. That narrow width works in your favour, because you nearly always have to get past a gate, through a garden door or along the thin path between the wall and the neighbour's boundary line. Once it is round the back you also reposition it more easily on your own. The rest of the fleet appears in the overview of towers you can hire.

On the deck itself you hardly miss the extra width. Spraying keeps your arm at a distance from the surface, you move sideways from corner to corner, and very little tooling has to sit within reach. The measurement that counts is the 245 cm platform, since that is precisely the width of the pass you are working. A broader deck changes nothing about how far you reach and simply hands you more parts to carry round the back of the house before anything gets built.

Narrow mobile scaffold standing along a facade, the 75 cm stand rolled sideways band by band across the wall

The wide RS52 at 135 cm earns its keep only when a good deal has to travel up with you: buckets, a second person touching in with a brush, or a stock of masking film. Where you are repairing first and applying spray coating afterwards, that extra floor is worth weighing. For pure spray work fed by a hose from below, the narrow tower beats the wide one at every gateway on the route. The two sizes stand together in the table of tower dimensions, weights and builds included.

Choosing a working height when you hire for spray coating

On two storeys the coated surface nearly always carries on right up beneath the roof edge, so that is what your tape runs to. Getting a gun there means a working height in the range of 6 to 8 metres, the deck itself landing on four to six, since a standing adult adds roughly two metres of reach above whatever the platform stands at. That figure goes on the booking, and the matching build is set out at an eight metre build.

Measure to the highest edge the gun still has to touch, rather than automatically to the gutter. Where fascia and overhang stay outside the job you stop half a metre lower and can sometimes leave a platform out of the build entirely. Measure from the level the wheels will sit on as well. If the drive falls away towards the street, your starting point lies below the front door threshold, and you hire a touch more height than the elevation appears to need.

Mobile tower standing at a front elevation with its top deck near the eaves, the reach a two storey job asks for

Choosing tight punishes you faster here than in brush work. Stand too low and the top strip gets worked with your arm above your head, film thickness turns uneven, and you catch a great deal more of the mist yourself. The last metre then needs a further stand, which is exactly the interruption you were trying to avoid in the first place. One lift more costs little; a second assembly day costs plenty. Torn between two builds on a wall of two storeys, take the taller without hesitating.

Where the tower you hire stands while the pump runs

Ground at the foot is claimed twice over on spray work. Four stabilisers angle outwards there, and your pump stands there too, with a bucket of material beside it that you would rather not shift at every single stand. Reckon on a strip of free, level ground that runs wider on all sides than the tower itself does. Put the pump next to the stand rather than underneath it, so moving on never begins with lifting a loaded machine out of the way first.

Check where the tower will actually stand before the parts are delivered. Slabs, a drive or a raked gravel path are fine enough; a lawn that sinks beneath the wheels after a week of rain is not. Watch for level changes between garden and terrace, and for the obstacles that live along every wall: a water butt, an outside tap, planters, a bike rack, the drain cover a stabiliser wants to occupy. Ground that runs away downhill is dealt with under uneven ground beneath a tower, remedies included.

Stabilisers set out at the foot of a mobile tower, showing how much level ground a single stand actually claims

Think about where the mist travels when you settle on a position. Overspray drifts further than most people expect, so pick a stand with no neighbour's car standing anywhere inside range, and warn the household well before you begin. Where the tower sits partly on the pavement, keep a walking route open and ask the council what your particular street allows. Sort all of that out before you hire the tower rather than on the morning of your first spraying day, with a pump already running.

Hire days needed when applying spray coating to a wall

Spraying a wall in passes goes surprisingly quickly. Time is eaten before and after: cleaning down, touching in bare patches, masking windows and doors, running film the whole way down to the ground and stripping the lot off later without dragging fresh coating along with it. Masking has to be neat as well, since a ragged edge shows up at once on a sprayed surface. Two to three hire days is the practical figure for a two storey terrace, masking included.

Inside those days sit waits you cannot make up. Between coats the surface has to dry, and the material decides how long that takes rather than the schedule you would prefer to keep. Weather sits on top of it: rain, hard sun on the wall or too much wind and you postpone. Plan around the day you are certain to be finished, plus a morning for clearing up, instead of the day you could in theory stop with the last pass laid on.

Mobile scaffold left standing along a side elevation, the position kept between coats through the booked hire days

The way the rate is arranged helps here. It is the opening 24 hours that carry the full figure; from day two onwards 95 per cent comes off, which makes a spare day held back against poor weather nearly free. Book tight instead and you find yourself waiting on a collection van with half a wall coated. Setting an end date for a longer job is covered in working out how many hire days you need.

Which mobile scaffold suits applying spray coating?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Applying spray coating from a 245 cm deck per stand

With a platform 245 cm long you finish a band of wall a little over two metres wide from each stand. Work that band over its full height before you do anything else at all, top down in horizontal passes that overlap generously. The only visible join then falls on the vertical line between two stands, and you put that on a corner or behind a downpipe wherever the wall allows. The more often you reposition, the more hire days it takes.

Repositioning starts at the bottom, not at the top. Switch the pump off and set the gun down before you descend, since both hands are needed to roll the tower. Then look at where the hose lies, because it must not run under a wheel or stretch tight between wall and frame. Take it along in a generous loop in the direction of travel and pay it out again only once the brakes are back on and the stabilisers are down.

Guardrail frames on a pavement outside a dwelling, the hire set built up before the first band of wall is covered.

What goes up with you stays limited: the gun on its hose, a cloth, some tape and a spare filter. Anything forgotten means climbing all the way back down, so run that list through in your head before you step on at all. The number of stands is nearly always underestimated when applying spray coating. Eight metres of wall already means three to four stands per coat, and a corner house adds an entire flank to that total. Bring spraying the window frames into the same visit and your hire period stretches once more.

Delivery: where the parts go when you hire for spraying

What arrives is a loose set of frames, braces and decks, counted through and complete. Nominate a spot for that stack beforehand, since the strip beside the wall already belongs to the pump and the buckets. The drive or the front garden works well; the stretch you mean to mask that same day certainly does not. Wrap the order up on a weekday while the clock still reads before 15:00, and it reaches you on the next working day.

Choosing when the set turns up and when it leaves again is yours alone, and on spray work you read the forecast before deciding. Plan delivery for the day before your first spraying day, so you build calmly and begin masking straight afterwards. Assembly is your part: two people, no rush, manual and instruction video within reach of the stack. Pick a delivery day at the start of a dry spell, because building frames in the rain is slow going. The sequence sits in the assembly steps.

Van at a house unloading scaffold parts, the drop off booked a day ahead of the first coating morning

We come for the tower afterwards; you only dismantle it and stack the set complete. Do that once the coating has dried, or you glue mist onto the tubes and spend longer cleaning than breaking down. Tally the components while the tower comes apart in your hands, and the set is whole by the time it reaches the kerb for collection. What bringing and fetching costs in your province sits in the overview of delivery charges.

Safe work on a tower while applying spray coating

Towers in this fleet answer to EN 1004, load class 3, and a class 3 deck may carry 200 kg on the square metre. For spray work that is generous indeed: you, the gun and a stretch of charged hose stay comfortably beneath the figure. Where tins of material and a second person also travel up, add the whole lot together, since a charged line is heavier than the eye suggests. What the class means in practice is at this scaffold standard explained.

The standing rules apply here as everywhere else. Wheels get braked as you step aboard, the tower is never rolled with a person or a load on the deck, and work halts once the wind rises. That limit arrives sooner in spraying than in other trades, since mist then goes everywhere and settles on the very cars and windows you had kept clear. Check all four stabilisers after each move and set them out hard again before anyone climbs.

Assembled tower in a sheltered passage between brickwork and a hedge, with a ladder propped on the wall beside it.

The hazard genuinely belonging to spray work is the floor beneath your boots. A platform turns treacherous once mist settles on it, so lay cardboard or film down and replace it the moment it glistens. Remember too that the hose keeps tugging at your arm and can hook behind the guardrail. Keep the zone under the platform clear, because a falling gun takes the hose down with it. Everything else that applies while applying spray coating aloft is at height work regulations.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for applying spray coating

1

Measure your hose length before choosing where the pump stands. Fall just short at the final stand and shifting the pump once beats putting the hired tower down in the wrong place entirely and having to strike it again.

2

Hang the hose over the guardrail in a wide loop rather than running it tight down an upright. It then stops tugging at your arm while you work sideways along the wall from one corner to the next.

3

Mask the windows and frames on the day you assemble the tower. Once the first coat is on you will not want to climb through fresh coating carrying rolls of tape and film in one hand while the gun waits.

4

Chalk on the paving where the wheels sit at each position. Following a break or a shower, the tower goes back on those marks and your passes stay in one continuous line with no shadow at the joins.

5

Lay a sheet of card or thin film on the platform against settled mist and swap it as soon as it feels slippery. A minute of work, and it saves a slip with a gun under pressure above the border.

6

Set your collection date a day later than your last day of applying spray coating. That leaves a morning to strip masking and break the tower down dry and complete without hurrying over the last frames.

Frequently asked questions

Frequently asked questions about applying spray coating

Which mobile scaffold do you hire for spray coating a wall?+

For a two storey house, hire the RS51, the narrow tower at 75 cm across. That width passes a gate and crosses a slender path where a broader scaffold jams, and up on the deck you never miss the centimetres, since spraying is done at arm's length anyway. Where plenty of material goes up, or two of you work aloft, the 135 cm RS52 is the better hire. Measure the narrowest gap on your route to the wall before you book anything at all.

How does hiring a tower for spray work run from start to finish?+

You reserve online by model and working height, name a delivery date and a collection date of your own choosing, and pay a fixed sum including VAT. Parts arrive counted; you assemble the tower, coat the wall, and on the last day set everything out dismantled and complete. We take it away after that. The single item needing tight planning is the moment masking begins, because that governs the whole run of hire days that follows it.

Over how many hire days does applying spray coating usually run?+

Two to three hire days suits a two storey elevation. Spraying each wall takes only a few hours, but masking, drying between coats and clearing up fill the remainder. Working several elevations, or adding repairs, means hiring the tower a day longer from the outset. Delay through rain or wind is then absorbed without your plan collapsing around you. Indoors, or on a single dormer, one hire day sometimes does it; across a full elevation it never will.

What is included in the rental price when you hire for spraying?+

Two things drive the rental price: which model you take, and how tall you build it. The journey out with the set and the journey back with it carry a fixed figure set by province. Everything shows VAT and appears in front of you before confirmation. No extra is charged for the number of passes sprayed or coats applied. Booking online lets you weigh builds and hire periods against one another calmly before committing to a date.

Which working height do you hire for spray coating two storeys?+

Two storeys asks for 6 to 8 metres, the platform sitting on four to six. Run the tape from the point the wheels will occupy up to the highest edge the gun still has to touch. Where coating carries on beneath the roof edge, take the top of that surface as your figure. Check whether an overhang intrudes as well, since that settles which tower build you hire rather than which one you fancy. Half a metre of spare reach never went to waste on a sprayed elevation.

Can the hired tower be delivered, or must I collect it myself?+

Either route works and you settle it as you hire. Delivered, the set arrives on a date you name and is fetched after your last coating day, at a figure fixed for your province. Driving yourself costs nothing by appointment from Zeeburgerpad 89 in Amsterdam, assuming your transport handles the parts. Most people spraying let the scaffold come to them, because parking a car beside drifting mist for two days holds little appeal.

Does the hire include assembly of the tower for spraying?+

No, you build it yourself. The tower arrives as a complete set of parts and leaves the same way afterwards, but assembling, repositioning and dismantling belong to you. Two people spend a couple of hours at it, with the video showing the order things go together. Count those hours into the schedule, because building and masking in the same morning already fills it. Cherry pickers and facade scaffolds are not hired out here, so the mobile tower is the tool.

Can I extend the hire if my spray work overruns by a day?+

Give us warning in good time and the collection date shifts, so long as that tower is not already promised to the next hirer. Spray work overruns more often than other trades, because you depend on weather and a second coat waits on the first drying. To stay ahead of that, reserve an extra day at once; you choose the collection date and bringing it forward is allowed too. Nobody wants to stop halfway across a wall for want of a day.

What clear space does the foot of a hired tower want?+

Allow for the width of the tower plus the reach of four stabilisers on every side, and on spray work add the ground the pump and the buckets occupy. In practice you want a flat, clear strip a few metres long beside the wall. Water butt, shed or bike rack standing in the way? Move it before delivery day, since shuffling round obstacles mid job costs you an hour you will not get back. The stack of parts belongs inside that space as well.

Can I keep the hire going when it is too windy to spray?+

The tower may simply stay standing; only the spraying waits. Mist carries well over a boundary in a breeze and film thickness turns irregular, so those hours are never recovered. Use such a day to sand, mask or touch in bare patches and spray on the following one. Since the length of the booking is yours to set, a shift of that sort generally costs a single further hire day. Still mornings remain the best hours for this kind of work.

What happens to the deposit after a spray job on hire?+

A deposit is paid at the time of hire and comes back within a working day of return, once the set of parts has been counted through. On spray work two things matter: hand back every component you were given, and leave no dried mist behind on the tubes or the platforms. Covering the frames as you go saves an hour of cleaning on collection day. More on this sits in the piece about getting a deposit back, worth a read first.

Does the hired tower stay in place between two coats?+

It does, which is precisely why spray work gets counted in hire days rather than in hours at the gun. The tower sits where it is while the first coat dries off, wheels braked and stabilisers set. Do take loose material off the platform when you stop, particularly if wind is forecast. Next morning you spray on from precisely the same stand without measuring or repositioning, which saves half an hour of setting up at the start of every morning.

Hire a mobile scaffold for applying spray coating today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.