See your price
Application

Painting a gate? Choose the right scaffold.

Painting a gate means working on something low but wide that needs paint on both faces. A double drive gate soon measures three to four metres across the leaves, while its highest point stops level with the piers beside it. On top of that the gate has to keep opening for the car, the post and the neighbours. For this job you fall back on the Altrex MiTower, a one-person tower just 75 cm across. Below is the build to order and what two faces cost you in hire days.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a gate we recommend the 1-person scaffold.
  • For painting a gate you hire the MiTower: 75 cm wide, for one person, built to 4 to 6 metres of working height.
  • The gate is wider than it is tall, so a platform of 245 cm wins you the time a ladder loses.
  • Reckon on two faces and several coats, and keep the leaves usable meanwhile for the car, the bikes and visitors.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for painting a gate?

Safe, stable and professional work at height

On a gate the difficulty is not the height but the width, and the fact that the thing moves. You are working on a plane a few metres across that you want to finish evenly from top to bottom, and at the same time that plane has to swing, because people need to get through. With a ladder you shift yourself every half metre and stand squarely in the path of the leaf. Anyone weighing up scaffold hire for painting a gate is mainly buying calm: one fixed position beside the opening, clear of the swing, from which a whole leaf gets worked. That leaves the working height to order and the days both faces will need.

  • Painting a gate means a wide, low plane
  • Leaves that must still open meanwhile
  • Two faces, so every round done twice
  • A stand clear of the swinging leaf
Read more about working safely →

Which scaffold to hire for painting a gate

The Altrex MiTower is the model that suits here: just 75 cm across, sized for a single user and light enough to shift unaided. That last point is the strongest argument on gate work, because you keep nudging the build along a plane wider than your reach. Choosing to hire a mobile scaffold of the broad sort would only add hauling on a drive where space is short as it is. The versions available are shown under the MiTower we hire out.

The 75 cm this base measures often drops in exactly between the gate opening and whatever stands next to it: a hedge, a low wall, a wheelie bin or the car still parked in front of the house. Stand on the street side and that width leaves a footway clear for people going past. On the garden side you usually get in between a border and the path as well, without treading a single plant flat. A wider base would plant one leg in the border at every position.

The 75 cm frames of a one person hire set leaning on the pavement outside a house, ready to be built.

The platform of 245 cm is the measurement that really counts on a gate. A single leaf of a double drive gate is often just as wide, so you work it top to bottom from one standing position. On a narrow garden gate set in a fence you even keep room for your kettle and your abrasives. That is the difference from a ladder, where you move every half metre and carry the tools in your pocket. Caught between this model and an ordinary wheeled one, the comparison of the two settles it.

Working height to hire for painting a gate

Working height on this job is your platform height with something like two metres of reach on top, and on a gate that sum lands lower than it does on facade work. The leaves themselves usually stay under two metres. What rises above them are the piers, the head rail or the arch the gate hangs in, and now and then a cap or a lantern on top of that. It is the highest of those that decides what you order, not the top edge of the gate.

The model spans 4.2 to 6.2 metres, and on a gate you work in the lowest stands: a build reaching 4 to 6 metres of working height covers everything here. Even for a low garden gate you hire that bottom stand, simply because it is the smallest build this model has. Where the gate sits in a brick wall with tall piers and an arch above it, you touch the six metres. Order that stand and the cap on top of a pier is still within comfortable reach.

Mobile scaffold erected against a side elevation, the modest build height a gate with piers actually calls for

Take your measurement from the paving the castors end up on, and allow for a drive that generally falls away towards the road. Set the build on the low side and thirty centimetres of reach vanish at the top. Choosing too tight bites you in exactly one place, the head of a pier, which you then end up doing off a stepladder after all. Hiring one stand higher costs you nothing in build time. The page on a six metre reach shows what such a build delivers.

Where the hired tower stands clear of the gate leaves

The first question is not where it stands most conveniently but where the gate can still pass. Chalk the swing of both leaves onto the paving if that helps, and keep that area free. Put the build alongside it, on the hinge side or just outside the furthest point the leaf reaches. Then you need not move anything the moment somebody wants to get through. It also saves your fresh paint, since a leaf scraping a standard hits precisely the work you have just done.

The ground at a drive is usually block paving, slabs or concrete, and all three serve well. Watch for the rebate or the track of a sliding gate, a drainage channel running across the entrance and a threshold a castor can drop into. Gravel is more awkward: the wheels sink in and boards have to go under the stabilisers. On grass beside a garden gate the same holds, certainly after a wet week when a leg settles a few centimetres unnoticed.

Stabilisers projecting at an angle under an erected tower, held outside the path a swinging gate leaf has to take

Then look at what surrounds the opening. A letterbox, an intercom post, a low hedge, bins or a parked car together decide how much room is left for the stabilisers. If the gate gives onto a public road, keep a way past for pedestrians and check whether your council has rules about it. Shift the bin and the bikes the evening before, because doing it on the morning itself eats into your first coat. How to cope with a sloping entrance is described under working on uneven ground.

How many hire days painting a gate takes

Cost this job by face and by coat and your planning will hold. First you sand the existing work back, lift off loose paint and deal with rust spots or rotten timber. Then comes a primer and finally two covering coats. Every round runs on the street side and again on the garden side, so you have passed the same plane six times before it is finished. A gate with bars or slats adds four sides to every element on top of that.

Between those rounds sits drying time that refuses to be hurried, and out of doors the weather hangs on it as well. A morning with rain or too much wind you simply skip. In practice a double drive gate lands on three to four hire days and a single garden gate on two, and that is before you have allowed for a single setback. Book the whole stretch at once rather than as two separate bookings. What others allow for a period like this appears in the overview of hire periods.

Inspected scaffold parts checked over between hires, the set booked for the days both faces of a gate take

Those extra days weigh lightly in what you pay. Day one alone goes at the full rate, and each day after it is counted with ninety-five per cent taken away, so booking wide is cheaper here than taking the tower twice in short blocks. That is welcome, because a gate stranded halfway through its primer is not something you want hanging there. Set your collection a day past your final coat and spend that morning striking the build and clearing the drive.

Which mobile scaffold suits painting a gate?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting a gate from the 245 cm platform

Work leaf by leaf and from the top downwards. With 245 cm of platform you usually stand right for a single leaf of a drive gate in one go, finishing the head rail, the middle field and the bottom rail one after another without shifting anything. On bars or slats you work vertically, element by element, because half a slat drying off leaves a line you will never lose again. A double gate therefore means two positions per face, with the joint on the closing gap.

For the second face you do not move the scaffold, you move the gate. Swing the leaf open until it stands beside your build and the back is within reach, or fix it in whatever position you are working in. That way the tower shifts only once per face. Do not forget the closing edges and the hinge side either: those two narrow faces show themselves only with the gate half open, and that is exactly where paint begins to let go.

Assembled tower against a brick wall in a narrow passage, with a separate ladder resting on the bricks rather than fitted.

Take little up with you, because this is a one-person build and everything you set on the deck comes out of your own space. A kettle, a brush, a block of abrasive and a rag will do. The number of positions catches people out: two leaves, two faces and three coats runs to dozens of fresh starts, each one a set of brakes off and brakes on again. If the railings beside the opening go in the same round, see painting railings, which adds a day or two.

MiTower hire and delivery before your first sanding day

The scaffold turns up at the kerb as separate parts, counted and complete. Say in advance where they may lie, and make sure that spot is not inside the swing of the gate, or you will be moving the whole stack before you begin. A drive, a garage or a strip of grass beside the entrance answers well. Reservations that come in on a weekday ahead of 15:00 travel out to you on the next working day. Pick a date that lands the set before your first dry morning.

Assembly we leave to you. A manual comes in the load, and the video runs through which part goes where; this build goes together single-handed, which suits a job you are standing outside on your own for anyway. We deliver nothing erected. Delivery day and collection day are both yours, so you can match the drop to the first day dry enough to sand. Collecting it yourself costs nothing, by appointment, from the yard at Zeeburgerpad in Amsterdam, provided the long parts fit your vehicle.

Loose scaffold parts set out on the street ready for assembly, the counted drop you keep clear of the driveway

Once the final coat is on we return for the material. Striking the build and stacking it complete is yours to do, preferably within carrying distance of the road, so the gate need not stand open all morning waiting for the van. Hold off until the paint is hard enough to walk past carrying scaffold tubes, or you will read that day off your leaf later. Count the parts through as you stack them. What the run to your province costs is under the delivery and collection rates.

Painting a gate safely on a hired one-person tower

The platform takes 200 kg on a square metre and no more, that being load class 3 in EN 1004. On gate work you never come near it, standing up there alone with a kettle of paint and some abrasive. More to the point is that this model is built for a single person: let nobody climb up beside you to pass something, not even for a few seconds. Handing up is done from the ground, with a bucket on a rope if it comes to that.

Brakes on before you climb, and the build moves only with nothing and no one on it. Obvious enough, but on a gate you reposition more often than you would guess. There is a risk of its own here as well: a leaf pushed open by the wind or by a passer-by and slammed against the standards. So fix the gate in the position you are working in, with a hook, a wedge or a rope, and warn the household that the drive is out of use.

Scaffold parts lying beside a house on the street, the material you keep outside the swing of the gate

Outdoor work also means stopping once it starts to blow hard, since an open gate leaf catches every bit as much wind as you do. Watch for wet paving, moss along the boundary and spilt paint on your platform, which turns glassy the moment you pivot on it. Keep the ground beneath you free of tools and buckets, however wide the entrance looks, since a bucket left on the drive is what a swinging leaf finds first. More on steadying a build sits under bracing and anchoring a tower.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a gate

1

Chalk the furthest position of both leaves onto the paving before you set anything down. Everything inside that line, from scaffold parts to paint kettles, otherwise gets shifted back and forth all day long.

2

Do the closing edges and the hinge side first, with the gate half open. Those narrow faces are the hardest to reach and the slowest to dry, and afterwards you can shut the leaf again.

3

Put boards under the stabilisers if you are standing on gravel or grass. That stops the legs settling during the job and saves you levelling the build again halfway along a leaf.

4

Choose a day with little traffic over the drive for your first top coat. Every time the gate has to open you lose your rhythm, and sometimes a start you will still be looking at afterwards.

5

Take the tower for one day longer than your arithmetic suggests. On outdoor work with two faces, a shower at the wrong moment is enough to push a whole coat into the next day.

6

Never leave the paint kettle standing on the platform during a break. This is a tower for one person, so anything left up there is in your way the moment you climb back with wet hands.

Frequently asked questions

Frequently asked questions about painting a gate

Which scaffold should you hire for painting a gate?+

The MiTower is the practical model here: 75 cm wide, sized for one user and light enough to reposition unaided. That fits gate work, where you are often busy alone and keep shunting the build a little along a wide plane. Its 245 cm platform covers a whole leaf of a drive gate as well. Taking a heavier tower on hire mostly earns you extra hauling about on the drive, and gains you nothing on a plane this low.

How does hiring a tower for gate work actually go?+

You pick a model and a build online, decide yourself when we call to deliver and when to collect, and pay a fixed amount that has VAT counted into it. The set arrives at your address counted, you assemble it on the drive and work through both faces of the gate. On your last hire day you stack everything dismantled and we drive it away again. There is no more to this rental than that.

How many hire days does a double drive gate take?+

For a double gate you usually come out at three to four days, and for a single garden gate at two. That is not down to size but to the number of rounds: sanding, priming and two top coats, each of them on both faces. Drying time between coats depends on your material and the weather. Because the hired tower simply stays put between rounds, you can plan those days back to back. One continuous hire period is simpler here than two short ones.

What decides the rental price for painting a gate, and how does the discount run?+

It follows from the scaffold you choose, the build you need and the province the van has to reach. The amounts, VAT included, are on the page listing our prices. On gate work the thing that counts is ordering your drying days with the rest: the opening day weighs heavily and the ones behind it hardly at all. Fixing one period costs you less than booking two separate blocks. Delivery to your province is a fixed amount on top of the hire.

Which working height do you hire if the gate is only two metres?+

Even then you hire the lowest build of this model, which brings you to a good four metres of working height. Lower is not on offer, and you need that margin for the piers, the head rail and any cap above the opening. Measure from the paving the castors stand on to the highest point that gets paint. The page about working heights shows which stand goes with that. State the platform stand you need at the booking stage, not simply the height of the gate itself.

Is the hired set delivered at the gate or do you fetch it?+

You weigh that up yourself when you book. Have the set brought and it lies by the entrance on your chosen date, and we drive it away again after your last top coat, for an amount fixed per province. Prefer your own transport and the scaffold stands ready by appointment at no charge, provided the long parts will fit. With delivery, agree where the material may lie, because right in front of a gate is exactly the wrong spot.

Do you put the tower up when I hire it for painting a gate?+

No, that work stays with you. We bring the components complete and counted and fetch them afterwards, but assembling, wheeling and striking are not part of the rental. On this model one person manages the build, with the manual and the video to hand, and it takes about half an hour, so you are on the deck long before the kettle is open. Handing it over erected is not possible, and facade scaffolds or cherry pickers are not something we run at all.

Can I extend the hire if painting a gate overruns?+

Yes. Pass it on in good time and the collection date moves along, as long as that same tower is not already down for another hirer. On outdoor gate work this happens regularly, because you depend on dry weather and on the time every coat needs to harden through. Anyone wanting to cover that takes a spare day at the moment of booking. If it goes well you hand back early without any trouble.

How much room beside the gate does the hire need?+

Besides the footprint of the tower itself there is the reach of the stabilisers, and then the full swing of the leaves, which has to stay clear. On a double drive gate that means a strip beside the opening you will not be using for the car for a few days. Bins, bikes and a hedge belong in the same sum. Clear it before the scaffold is delivered, because shifting halfway through your primer costs half a morning.

May the hired tower stand idle when it is too wet to paint?+

Certainly, the scaffold stays exactly where it is; only the painting slides. Damp timber and a cold morning give you a coat that bonds badly, and on a gate that shows at once. Use such a day for sanding, filling or going over the hinges, then carry on with paint the next morning. Because you set the end date of your own hire period, that shift costs you no more than a day. The hire simply runs on across a wet morning like any other.

How does the deposit work on a hire like this one?+

Your deposit comes back to you one working day after we have collected the scaffold set, as soon as everything has been counted through. On gate work watch two things: hand in every component, the small ones included, and leave no dried paint on the tubes. A cloth over the guard rail where you rest your brush saves you sanding afterwards, and a damp rag at the end of each day does the rest. The rest of the conditions sit in this explanation of the deposit.

Does the gate have to come off its hinges during the hire?+

It can stay hanging, and that is usually the easiest course. By fixing the leaf in a series of positions you reach the front, the back and the narrow edges in turn from the tower. Taking it off costs two people, somewhere to lay the leaf down and the risk of an open entrance overnight. Only with serious rot along the bottom is unhanging it worth the trouble. Leaving it hung also keeps the tower in one spot for longer.

Hire a mobile scaffold for painting a gate today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.