See your price
Application

Spray-painting battens? Choose the right scaffold.

Spraying battens looks like any other spray job until you ask where the mist ends up. A batten screen holds more air than timber, so everything you miss carries straight through and settles on whatever stands behind it. This job therefore starts with masking and only then with the gun. Along a house or a garden you hire the 75 cm RS51 and set the reach between 6 and 8 metres. What follows covers which build fits, how many rental days are realistic and where the tower can stand.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For spray-painting battens we recommend the Narrow mobile scaffold.
  • Spraying battens calls for the narrow 75 cm RS51, and you book 6 to 8 metres of working height.
  • Allow half a day for masking behind the battens, because the mist travels through every gap to the far side.
  • Every batten has four sides, so you pass the same strip several times and keep the tower longer than on solid cladding.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for spray-painting battens?

Safe, stable and professional work at height

A solid wall catches everything you aim at it. A batten screen does exactly the opposite: it lets most of your mist through and shares it out over the fence, the planting or the car behind. That changes what you ask of a scaffold. You do not only need to get alongside the screen, you need to stand at an angle to it as well to catch the sides of each batten, and you have to reach the masking behind without clambering over the path. A ladder will not do: two free hands are the minimum here, and shuffling sideways is not on the list. Hiring a scaffold for spraying battens is about spray angles, not only about metres.

  • Mist passes straight through the open batten screen
  • Four sides per batten demand several spray angles
  • Top batten sits six to eight metres up
  • Masking everything that stands behind the battens
Read more about working safely →

Which mobile scaffold to hire for spray-painting battens on a facade

A batten screen or slatted frame is hardly ever in a roomy spot. A path runs alongside it, a fence stands behind it, or the whole thing is fixed to a carport. That is why the choice here falls on the narrow Altrex RS51, a tower that builds up only 75 cm wide. With that width you get through a garden gate and past a boundary where a broader frame jams, and you only shift it once a strip is finished. The range of mobile scaffolds for hire sets the models side by side.

Up top you barely miss those extra centimetres. On this work you stand a little back from the battens, because the mist needs room to spread before it reaches the timber. You shift sideways more than anything and carry little kit up with you. What you do notice is the platform length: 245 cm of deck, and that is exactly the run of battens you can finish from one stand without rolling along or going back down.

Mobile scaffold built up against a modern facade, the narrow model you hire for spraying batten screens

You only start on the 135 cm RS52 when more has to go on the deck than you and your gun. If you hang sheeting behind the slatted frame first, or somebody works with you cutting in the end grains with a brush, that roomier deck is welcome. As soon as the way through to the battens turns out narrower than a metre, the option drops away by itself. Both towers appear with their measurements in an overview of mobile scaffold sizes.

Which working height to hire for spraying a batten screen

Measure on this job to the top batten that still needs a coat, and not automatically to the roof edge above it. Where the slatted frame runs on to just under the gutter, the working height you want lies between 6 and 8 metres. The deck then hangs somewhere between 4 and 6 metres, because on top of the platform height another 2 metres of reach counts before your hands are at that top batten. That figure goes into your booking, and an eight metre reach shows how such a build looks.

Take as your zero point the height the wheels will rest on, not your back doorstep. Batten screens often start on a low wall, on a border edge or on a terrace a step below the rest of the garden. Every difference you skip is added at the top, and you notice it precisely on the last two battens. Where the path falls away towards the street, work from the lowest point you still have to pass with the tower.

Tower built up the full front elevation to just under the gutter, the height you book for tall battens

Choosing too tight bites harder here than on a closed face. Stand too low and you spray the upper battens from underneath, the mist shoots up through the gaps and part of it lands on your own face and arms. The top edge of every batten then stays half untreated, and from the garden that is the first thing anyone sees. If you are torn between two builds along a wall of two storeys, take the higher one.

Hiring a mobile scaffold for battens: where the tower stands

The standing place half chooses itself, because you have to be in front of the battens and that is usually where the space runs out. Look first at whether the ground can carry the four stabilisers: paving and hard surfacing are fine, a border that sinks after rain is not. Where a strip of gravel lies in front of the frame, rake it level before the van arrives. A foot that settles askew only shows once you are up top, and by then you are working out of true.

Then think about the other side of the screen. Whatever stands behind the battens catches part of your mist: the bikes, the patio table, next door's lawn, the side window of a parked car. Clear away what can go and hang sheeting over what stays, and do that before the tower is in position. Otherwise you are wrestling between the stabilisers with a roll in your hand. Where the boundary lies within a few metres, warn the neighbours a day ahead.

Four stabilisers swung out under a mobile scaffold, marking the strip that stays clear beside a batten screen

Look as well at what runs along under the frame. A batten screen often hangs above a planter, an outside tap or a water butt, and that is exactly where a stabiliser wants to swing out. Such things are better moved a day early than worked around by standing the tower askew. What to do with a sloping terrace or an uneven garden floor is set out in setting up on uneven ground. Measure that strip now rather than on the morning itself.

How many rental days for spray-painting a batten screen

Spraying itself is not the long part on battens. The days go on masking beforehand, clearing up afterwards and the fact that you pass every strip several times to catch all the sides. For a screen of eight metres or so along a house you come out at two to three rental days in practice. Take in the top of a pergola or the edge of a carport and half a day is added for the extra shifting and lining up.

Inside that period sit hours you cannot fill. A coat has to flash off before the next can go on, and how long that takes is decided by your material and not by your diary. The weather comes on top: wet timber will not take a spray and in wind your mist blows over the boundary. So do not plan on the outcome where everything goes your way, but on the day the job is certainly finished, and add a morning for stripping off sheeting and tape.

Mobile scaffold left standing along a side elevation, as it is during the flash-off time between two spray coats

The way the rental price is put together rewards booking generously. Only that opening 24 hours counts in full; every following day the tower stays with you comes with 95% off. A spare day for a wet morning therefore costs you next to nothing, while booking tight leaves you with half-sprayed battens and a driver already on his way to your address. To make that judgement calmly, working out your rental days lists the rules of thumb.

Which mobile scaffold suits spray-painting battens?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Spraying battens from the platform: four sides to every batten

A batten has a face, two flanks and a top edge, and only the face is caught when you stand square in front of it. So you work a 245 cm strip in several passes: first at an angle from the left, then at an angle from the right, then straight ahead for cover. The underside of a horizontal batten you take by dropping through your knees. Anyone who sprays straight ahead only will see after a few seasons exactly where the timber went bare on the flanks.

Spraying in passes decides how often you shift. On a closed face you are done as soon as the strip has a coat; here you are done only when every angle has been covered. Go down before you roll along, because a tower like this is moved with both hands and with the hose off the wheels. Then set the brakes again and fold the stabilisers back out before you climb up, even after a move of less than half a metre.

Narrow mobile scaffold along a facade with a 245 cm platform, the strip of battens you finish per stand

Before you climb, run through what has to come up: the gun, a cloth, tape and a strip of card to shield the edge of the batten screen. Every forgotten item costs you a trip down and back. The number of stands is almost always underestimated, because eight metres of battens is already three to four positions per pass. If you follow on with the window frames in the same colour, count extra stops into your planning.

Hiring a mobile scaffold delivered on the day you mask up

No assembled scaffold is delivered but a stack of loose parts, counted and complete, so work out in advance where that stack goes. On this job the run in front of the screen is usually already taken by sheeting, tape and tins, so lay the tubes and deck boards on the drive or further along in the grass instead. If your order comes in on a working day and it is not yet 15:00, everything is there on the next working day.

You pick the day the set pulls up and the day it goes away again, and here you match those two dates to the forecast. The handiest is to hire from the day you start masking: in the morning you put the tower together, in the afternoon you hang sheeting behind the slatted frame. Putting it together is your own work, preferably with two of you, and the manual and video that come with it walk you through the order. That is also covered in building up step by step.

Counted scaffold parts stacked on the pavement, where a delivery lands when the run in front is already masked

With the final coat on the battens, you strip the tower down and gather every part in one place; we drive round to pick the set up again. Only do that when the battens feel dry, because fresh mist keys to the tubes and then you spend longer cleaning than dismantling. What the run to your province costs can be read on the page of delivery charges by province, so it does not surface in your budget later on.

Working safely on the tower while spraying open battens

You are standing on a deck in load class 3 of EN 1004, good for 200 kg per square metre. For this job that is generous, because you, a bucket and a gun stay well under it. Climb up with two of you and a stock of material and it is worth adding up. Otherwise the usual agreements apply: brakes on as soon as you step aboard, never roll with anyone or anything on it, and stop when the wind picks up.

This job carries a temptation you do not get on a closed facade: the batten screen is right in front of your nose and feels solid. It is not a handrail, though. A slatted frame hangs on a few screws and will not resist a sideways shove, so pulling on it or leaning against it goes wrong. Stay inside the guardrails of your deck and shift along once more rather than stretching out to that one batten at the end.

Guardrails right round a tower and a ladder running up inside it, the safe climb when your hands hold a gun

Look as well at the deck under you and at the ground below. Settled mist turns a platform greasy, so lay card over it and change that once it begins to gleam. The zone at the foot wants to stay free of children and pets, since a cap or a roll of tape drops straight through open battens onto whoever is standing there. The rest of what applies to work like this sits in the rules for working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for spray-painting battens

1

Hang the sheeting behind the batten screen before the tower goes into position. Once it stands there you can no longer get at it properly, and the top runs end up crooked with too little overlap.

2

Spray a test strip on a couple of battens down low, then walk round the back to see how much mist comes through. That tells you how far the masking behind the frame has to run.

3

Chalk a cross on the paving at each wheel before you shift along. If rain sends you back to a strip later, the tower goes straight back onto that exact position.

4

Take a narrow piece of card up with you to hold behind the outermost batten. With it you catch the mist that would otherwise land past that last batten on the fence behind.

5

Finish every strip in the order left angle, right angle, straight ahead. Keeping to that sequence stops you losing track halfway through the day of which flanks have already had a coat.

6

Ask for your collection date a day after your last spraying day. That leaves you a morning to strip sheeting and tape and to take a dry tower apart without rushing.

Frequently asked questions

Frequently asked questions about spray-painting battens

Which mobile scaffold should I hire for battens and slatted frames?+

Along a house or a garden that is nearly always the RS51, the mobile scaffold 75 cm wide. That measurement is the decider here, because you have to get through a gate and along a path where a broader frame jams. On the deck you barely feel the difference, since on this work you stay at arm's length from the battens anyway. If tins and a second pair of hands go up, the 135 cm RS52 is the better hire.

How does hiring a scaffold for a batten screen actually work?+

In the webshop you pick a model and a reach, name two dates for the drop-off and the collection, and see straight away what the hire costs, VAT included. The parts then arrive with you, you put the mobile scaffold together, mask up and spray the battens. On your last day everything lies dismantled ready and we drive it away. Only your masking day really has to be right, because you do not do that job with a tower already standing in front of it.

How many days do you want to hire the tower for a batten screen?+

For a screen of around eight metres, allow two to three days. Spraying one pass does not take long, but you go along the same strip a few times for the flanks and the top edges, and masking and clearing up swallow the rest. If the frame turns the corner, or a pergola joins in, put the mobile scaffold down for a day longer straight away. That stays cheaper than stopping halfway and hiring again later.

What sets the amount for the hire, and how does day two work out?+

Two things set the amount: which model you pick and which reach goes with it. The run to your address is added per province. Everything is listed with VAT on the page of hire rates, so nothing surprises you at booking. For this job the shape of the tariff is the interesting part: day one is the expensive day and all the days after it barely weigh in. Put the tower down for the whole period at once and you pay less than for two separate blocks.

Which working height should I hire and how do I measure it on battens?+

For a screen running on to just under the gutter, allow 6 to 8 metres, with your deck at 4 to 6 metres. Measure from the ground where the wheels land to the top batten that still needs a coat. If the frame stands on a low wall or a raised terrace, add that on. Which build goes with it you look up through the overview of working heights before you commit to the scaffold.

Delivery or collecting it yourself: which suits this spray job better?+

Both routes are open, though most people choose delivery. The driver appears on the date you gave and comes back after your last spraying day, at a rate per province that is fixed in advance. Drive yourself instead and a complete mobile scaffold stands ready by appointment at Zeeburgerpad in Amsterdam, at no charge, assuming your car or trailer copes with tubes this long. With a gun going in the garden you would rather park your own car a street away.

Do you put the scaffold together, or do I build it myself?+

The second. We see to it that a counted stack of parts lies ready and we take it away again afterwards; putting up, shifting and breaking down are yours to do. Working with somebody else it fills half a day, and the video shows you the order to follow. Allow for that half day, because spraying seldom still fits in on your build day and the whole schedule slides on. Neither system scaffolds nor facade scaffolds nor cherry pickers sit in our fleet.

Can I keep the hire going if the spray work on the battens overruns?+

Tell us as soon as it is clear the work will run past your end date; the collection day is then shifted, unless that same mobile scaffold is already promised to the next hirer. Battens overrun more often than people expect, because the extra passes along the flanks eat time and a fresh coat waits on the last one flashing off. Booking a spare day at the outset saves that phone call. Bringing it back sooner is never a problem.

How much clear space is needed where I want to hire the scaffold?+

Work from the tower itself plus the swing of the four stabilisers all round, and add a walkway you can pass along with sheeting and materials. In practice you want a flat run a couple of metres wide in front of the screen. If a water butt, a planter or a bike rack is in the way, move it before the delivery day; shuffling round with a tower already built costs you an hour.

May the mobile scaffold stay up on a day it is too windy?+

Standing is fine, spraying is not. Wind is doubly awkward on open battens, because everything that shoots between them blows straight across the garden and lands on the fence or the car behind. Fill a morning like that with sanding, masking or cutting in edges with a brush, and pick the gun up again the day after. Because you choose your own end date yourself, that costs you a day of hire at most.

What happens to the deposit after I hire a tower for this?+

You pay a deposit when you hire a mobile scaffold. We transfer that back within 1 working day of the return, once all the delivered parts have been checked over. On spray work we look at two things: is everything back that you were given, and is there no dried mist on the tubes and deck boards. A sheet of card on your platform saves cleaning time on collection day. What else applies is explained at getting your deposit back.

Do I have to hire a second time for the back of the battens?+

Usually not. If there is room behind the screen you roll the tower round it within the same period and take the back in a second round; only a properly enclosed courtyard makes it difficult. Do bear in mind that such a round sometimes means dismantling and building up again. Count those hours into the number of days you put the scaffold down for, and then you need not book anything extra.

Hire a mobile scaffold for spray-painting battens today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.