See your price
Application

Cleaning glazing? Choose the right scaffold.

Cleaning glazing is not the same job as running a squeegee over the panes. Once limescale, cement haze or dried builders' dirt has settled on the glass you stand still at one window for minutes on end, with a product, rinsing water and sometimes a blade in your hand. So you want a firm deck underfoot and two buckets within reach. For windows up to the second floor that means the narrow RS51 from the hire fleet, 75 cm wide, built to somewhere between 6 and 8 metres.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For cleaning glazing we recommend the Narrow mobile scaffold.
  • Heavily soiled glazing is cleaned from the narrow 75 cm RS51, built to a working height between 6 and 8 metres.
  • You stand still at each pane for a long stretch, so two buckets, cloths and your product all have to fit on the deck.
  • Allow two to three hire days, because scale and cement haze go pane by pane rather than elevation by elevation.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for cleaning glazing?

Safe, stable and professional work at height

On an ordinary wash you stand somewhere briefly and move straight on. With scale, cement haze or building dust on the pane it goes quite differently. You put the product on, wait for it to bite, rinse off, look at the glass against the light and start a second round on some of the windows. Meanwhile wet gear stands beside your feet and you need both hands free. A ladder will not carry that: no space for a bucket, no space to step sideways. Hiring a scaffold for cleaning glazing is therefore mostly about what goes up with you and how many panes one position gives you.

  • Limescale and cement haze cost time per pane
  • Product, rinsing water and cloths go up with you
  • Six to eight metres of working height over two floors
  • A narrow build alongside borders and window sills
Read more about working safely →

Which mobile scaffold to hire for cleaning glazing with limescale

On a two storey house the Altrex RS TOWER 51 is the obvious model here, a mobile scaffold that builds only 75 cm wide. Windows rarely sit above an empty stretch of wall. There is a border under the sills, a downpipe running past, and the path round to the back is often barely wider than a wheelbarrow. That slim width gets you along there without half the garden ending up on the drive. Which other builds stand ready is listed at the mobile scaffolds in the hire fleet.

Up top it is not the width of the deck that counts but what has to fit on it. Badly soiled glass takes a tub of product, a second tub of clean rinsing water, a squeegee, a stack of cloths and usually a holder of fresh blades. All of that stands on the boards while you still have to shuffle past it yourself. On 75 cm that works, provided you park the tubs in a corner behind you and leave the middle of the deck clear.

Frames on the pavement by a front door, the slim 75 cm RS51 kit that fits a path round to the back

The 135 cm wide RS TOWER 52 only comes into it when two of you are up there, or when a jerrycan has to go up because there is no tap nearby. For a single house that is rare, so most people rent narrow for this. If you take the frames back with abrasive paper and varnish afterwards, the roomier deck is welcome. To set the models side by side first, look at the comparison of scaffold sizes.

Which working height to hire for glazing on the second floor

Measure to the top edge of the highest pane that is still dirty, and not blindly to the gutter. If that window is on the second floor you are right with 6 to 8 metres of working height. On top of the platform height comes roughly 2 metres of reach, which puts your boards at 4 to 6 metres. That range is what you enter when you book. How many frame sections belong to it is shown on the page about 7 metres of working height.

Your zero point is where the castors will end up standing. If a raised terrace runs under the back elevation, or the garden drops away towards the fence, that zero point shifts and so does the build you order. Look as well at an extension or a conservatory roof jutting out below the windows. You cannot get the base tight against the wall there, so you stand a good deal further off the glass and want to come out a notch higher.

Mobile scaffold built up past the top windows of a front elevation, exactly the height this cleaning work asks for

Choose too tight and you feel it in your shoulders the moment you hit scale. Limescale only lets go when you can bear down on it with a flat hand, and that does not happen with your arms straight above your head. The top band then comes half clean, and later that line shows up neatly against the light. When in doubt take the roomier build. For windows on a second floor that is almost always the sensible call.

Hiring a mobile scaffold for glazing work: where it stands

The strip under the windows is usually the most cluttered piece of ground a house has. That is where the border sits, where the hedge stands, where the terrace ends or the gravel path to the shed begins. The four stabilisers want free room on every side, and their spread is a good deal wider than the build itself. So walk the elevation before you hire a mobile scaffold and pin down, per window bay, the spot where the base can stand flat and unobstructed.

Then think about the ground, because on this job litres of water come down. Rinsing water soaks into the soil, and a border that looks firm enough when dry has gone soft under the castors after an hour of polishing. In such places lay wide boards or thick slabs under the footplates and check them again after every coffee break. For level differences and a garden path that falls away, the piece on working over uneven ground gives you the method.

Stabilisers swung out under an erected mobile scaffold, showing how much clear ground the base needs beneath the windows

Finally, watch the small obstacles that belong under a window by nature. A low hedge, a garden lamp, the grating over a cellar light and the raised edge of a terrace sit exactly where a stabiliser wants to swing out. Set the build so the glass stays within arm's length, because leaning towards a pane on this job guarantees trouble. Anything that can be moved you clear a day earlier, so nothing has to be dragged about during your hire period.

How many days to hire a scaffold for heavily soiled glazing

This job estimates badly from the number of panes. What decides it is how stubborn the soiling turns out to be. A thin film of building dust rinses off in a couple of minutes, while burnt in scale streaks under a sill can take three treatments before the glass looks even again. So start on an inconspicuous pane and time what it asks. It is a different job altogether from a plain wash of the panes, where you never stop moving.

For a terraced house with builders' dirt on the windows you generally land on two to three hire days. Waiting is built into that and nobody can shorten it. Product has to soak before it does anything, and on glass in full sun it evaporates before it gets that far. So you work round the house with the sun and leave the south side until late in the afternoon. That spreads your work over more half days than you expected.

Mobile scaffold erected against the side elevation of a house, left standing while a treatment soaks on each pane

The way the tariff is stacked works in your favour here, so booking generously costs you next to nothing. You settle the opening twenty four hours at the full figure, and each further hire day comes with 95 per cent knocked off it. A spare day is therefore near enough free, while cutting it fine leaves you staring at the calendar with half clean windows while the van is already on the road. For rules of thumb, the guide to hire days helps you plan.

Which mobile scaffold suits cleaning glazing?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Cleaning glazing from a hired platform of 245 cm

With 245 cm of deck length you are looking at a good two metres of elevation per position. At most houses that is one window bay, sometimes two narrow windows side by side. Finish that strip completely before you move, and start at the top so dirty rinsing water does not run over glass you have just done. Count the strips in your elevation beforehand. Ten metres of wall soon costs four positions per lift, and on a corner house the side wall still hangs behind that.

You move with a bare deck. Put the tubs down below first, even if you are only shifting two metres along, because sloshing water moves your centre of gravity at the exact moment you are pushing. Run through your list before you climb: product, rinsing water, squeegee, cloths, blades and a scraper. Whatever you forget you fetch by climbing, and five trips up and down per window quietly costs you half an hour of your hire day.

Mobile scaffold in front of a plain modern elevation, where one position brings about two metres of glass within reach

What people misjudge is the blade. Over flat, uncoated glass it is allowed, provided the pane stays wet, you keep it flat and you work in one direction. On coated, toughened or sandblasted glass you leave it in the box, and on a dry pane certainly. Always try a corner first and take that test seriously, because a misjudgement costs you a whole pane. That difference sets your pace, even if you go straight on to cleaning the windows at the back.

Delivery and building of the mobile scaffold you hire for glazing

You get a complete, counted set of loose parts delivered. Point out in advance where that stack may land, because you would rather keep the strip under the windows empty and a border is no base for tubes. A drive, or the edge of the terrace well away from the borders, suits far better. Confirm the reservation before 15:00 and, on a weekday, the parts arrive the next working day; the glass then gets started a day after that.

You pick your own delivery and collection date, and here you mostly watch the temperature. In frost your rinsing water sets on the pane before you have it dry, and on a wall in burning sun your product does very little. A mild, overcast day is the best moment. Putting it together stays your job; the printed instructions and the film that come with the set show you how. The order runs through step by step in the build guide.

Counted set of scaffold parts delivered beside a house, ready for you to build up before the glazing work starts

We collect again as soon as you are done. You dismantle everything and lay the parts together somewhere the van can pull up alongside. Rinse the tubes and the boards off if product has splashed on them, certainly with an acid product that attacks aluminium and leaves a dull grey mark. Bringing and fetching together carries a fixed price per province including VAT, and the figure for your address is listed in the overview of delivery charges per province, so your budget holds.

Working safely on a wet platform when cleaning glazing

Every mobile scaffold in our fleet belongs in load class 3 of EN 1004, which is a deck that takes 200 kg on every square metre. On this job you creep towards that faster than expected, because two full tubs already weigh twenty kilos together and a jerrycan of rinsing water piles a good deal more on top. If two of you are up there with a water supply as well, count it through before you climb. What load class 3 covers is unpacked in the article on this scaffold standard.

The ordinary rules obviously still apply. Put the brakes on before you set a foot on the lowest rung, never move the tower with a person or gear aboard, and come down once the wind picks up in earnest. That moment arrives sooner on glass than elsewhere, because a cloth behaves like a sail in the wind and wet hands keep little grip on a blade. Check after every reposition that the stabilisers are firmly back down on the ground.

Mobile scaffold built up in a side alley, an extension ladder leaning free against the wall, decks holding 200 kg apiece

The danger that really belongs to this job is under your soles. A deck with rinsing water standing on it goes glassy, and rinse aid or soap makes it worse. So use a tub you can close, pull a squeegee over the boards now and then, and put on shoes with a tread. Keep the zone below clear, because a blade that shoots loose or a falling squeegee is not something you want on anyone's head. The rest is in this guidance on work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for cleaning glazing

1

Pick one inconspicuous pane as a trial and time it with a watch. Multiply that single result by the number of similar windows and you get a fairer hire period than any advance guess.

2

Keep your two tubs strictly apart: one with product, one with clean rinsing water. Mix them halfway through and you simply smear the limescale across the pane and start again from the beginning.

3

Leave the sunny side of the house until late in the afternoon. Product drying on warm glass does nothing at all and leaves hazes behind that only a second round will shift for you.

4

Take a box of fresh blades up with you. The moment a burr gets on one it scores your pane in a single pass, and that scratch never polishes out again.

5

Lay an old towel on the sill under the pane you are working on. It catches the dirty water that would otherwise run down the brickwork and leave brown streaks there.

6

Set your collection day a full day after your last working day. That leaves you a whole morning to check every pane in daylight and to dismantle the hired tower without rushing.

Frequently asked questions

Frequently asked questions about cleaning glazing

Which mobile scaffold should you hire to clean glazing on a house?+

For the windows of a two storey house the RS51 is your model, a mobile scaffold that builds just 75 cm across. That size slips past borders, hedges and a tight side path, and you push it from bay to bay on your own. Up top, 75 cm is ample for you plus two tubs of water. If two of you are working, or a water supply has to go up as well, the wider RS52 at 135 cm gives more room to move.

How does hiring a scaffold for glazing work run from start to finish?+

Online you book on model and working height, name the date the set should arrive and the date it goes back, and settle a fixed amount up front with VAT included. We drop the parts on the spot you point out, you build the tower and work the elevation pane by pane. At the end you set everything dismantled and complete ready and we drive it away again. What you time yourself is the weather, because that decides whether your product bites.

How many hire days does badly soiled glazing usually take?+

With cement haze or burnt in limescale on the panes you usually end up on two to three hire days. If it is loose building dust, a single day often does it. The difference lies not in the number of windows but in the number of treatments per pane. If you are unsure beforehand, book the tower a day longer than you suspect, because having it delivered and built a second time costs far more than that extra day.

What will it cost to rent a tower for this glazing job?+

That follows from the scaffold model you choose together with the height you enter, with bringing and fetching in your province on top. Every rental price is listed with VAT included on the page with our rates, so nothing about the cost stays unclear when you book. Useful on this job: day one counts heavily and every day you tack on behind it barely registers. One generous period beats two short ones.

Which working height should you hire if the top windows sit on the second floor?+

Aim at 6 to 8 metres of working height, which leaves the deck standing at 4 to 6 metres. You measure from the ground where the castors stand to the top edge of the highest dirty pane, not to the gutter. If an extension juts in between and keeps you further off the wall, add a little. Which build suits which tower is shown on the overview of working heights.

Do you assemble the hired mobile scaffold yourself, or do we do it?+

That stays your task. We arrange the transport there and back; putting the tower together is your work. Two people are half a day at it, and you plan that half day separately, because on assembly day you rarely get to the glass. We do not supply facade scaffolds, system scaffolds or cherry pickers; for windows at this height a mobile tower is the right tool to get on with yourself anyway.

What if the panes disappoint and you want to hire the scaffold longer?+

Ring us the moment that becomes clear and we shift the collection day along, provided the set has not been promised to somebody else for those dates. With stubborn scale it regularly overruns, because a second or third treatment per pane only proves necessary once you are underway. To avoid that, book the extra hire day straight away. You choose the collection date yourself, and handing the tower back earlier than agreed is no trouble either.

How much clear room must there be under the windows for the build?+

Take the width of the mobile scaffold, add what the stabilisers swing out to left and right, and then count in a walking lane for yourself with two tubs. In a garden that comes down to a clear run of several metres along the wall. If planters, a low hedge or garden chairs are in the way, move them before the transport arrives. Dragging things about halfway through your hire period easily costs you an hour.

May you keep the hire running if it freezes or blows hard?+

The tower may perfectly well stay standing; only the cleaning itself gets pushed back. In frost your rinsing water freezes on the glass while you are still lifting it off; in a strong wind your product blows away before it soaks in. Use such a day to check frames over or degrease sills, and pick the glass up again the next morning. Since you decide how long you keep it, that delay costs one hire day at most.

Does the deposit come back quickly after a glazing hire?+

As soon as the returned set has been counted the deposit goes back, and that happens within one working day of return. On glazing watch two things: hand over every part you received, and leave no dried cleaning product on tubes or deck sections. An acid product marks aluminium quite quickly. Rinsing off now and then during the work easily saves you an hour of scrubbing on the day we come for the tower.

May you take a blade to the glass while standing on a scaffold?+

Over flat, uncoated glass you may, as long as the pane stays wet, the blade lies flat and you keep to one direction. On coated, toughened or sandblasted glass you do not, because every pass shows up. So always test a corner first. From a mobile scaffold that goes considerably better than from a ladder, because you can put both hands to it and keep your whole body behind the blade.

Hire a mobile scaffold for cleaning glazing today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.