See your price
Application

Spray-painting a facade? Choose the right scaffold.

Spray-painting a facade is not the same as spraying a window frame or a door. This is one continuous surface of tens of square metres that you want to finish in a single unbroken session, because every interruption leaves a visible join. That makes demands on your setup: as little repositioning as possible, a fixed order of faces and everything ready before the dry spell begins. For three storeys you therefore hire the wide RS52 at 135 cm, built to a height between 8 and 12 metres.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For spray-painting a facade we recommend the Wide mobile scaffold.
  • For spraying a facade over three storeys you fix an RS52: a deck 135 cm wide, built to somewhere between 8 and 12 metres.
  • A whole wall wants finishing inside one dry window, so your masking stands ready before the spray gun opens.
  • Decide the order of the faces beforehand, because that order settles how often you have to move the hired tower.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for spray-painting a facade?

Safe, stable and professional work at height

Size is the deciding factor on this job. You do not spray a complete wall in little pieces the way you treat separate parts; you begin at the top and work on without stopping until the whole surface covers. That only comes off if your setup moves along without fuss and if everything you need is already waiting up on the deck. On top of that you have only a limited number of hours in which it is not raining, the wind is kind and the wall is not baking in the sun. Hiring a scaffold for facade spraying is therefore mostly about rhythm: few setups, a fixed route past the faces and enough margin in the number of days you keep it.

  • Few setups, so few visible joins in the coat
  • A fixed order of the faces on the wall
  • Masking finished before the dry window opens
  • Working height up to the topmost edge of the facade
Read more about working safely →

Choose the wide RS52 when you hire for a facade

Anyone treating a complete wall surface takes more up than on small spray jobs. Rolls of sheeting, tape, a knife, a cloth, a spray unit or can, and often somebody walking with you to shield the edges. On the Altrex RS TOWER 52, with its deck of 135 cm, all of that fits and you can still move past each other. Which versions sit in the hire range of mobile scaffolds is listed with every dimension, so you can compare in advance.

Take the narrow 75 cm version only when your route in forces you to. At a front wall on the street that is rare; at a rear wall behind a metre wide gate it is not. So measure the tightest point on your route before you fix anything. If 135 cm will pass, that is by far the pleasanter thing to hire: spraying a facade keeps material, sheeting and tools within reach all at once, from the first pass to the last.

Wide mobile scaffold built along a modern wall, with deck space for masking film, tape and a second person

Keep the model and the ordered build well apart when you reserve. The RS52 as a type reaches 14.2 metres of working height and takes platforms 245 cm long, but you naturally do not order that maximum tower for a house. You fix precisely as much build as the top edge of the surface to be sprayed asks of you, and at three storeys that comes down to 8 to 12 metres. To see the versions side by side, the explanation of scaffold dimensions helps.

Work out the working height to hire for the whole facade

On a wall as a whole the highest point of the surface leads, and it hardly ever lies where you first put it. Above the brickwork there is often still a band under the gutter, a rendered edge or the triangle of a gable. Take those in, because a sprayed face that stops half a metre below the top edge stands out from across the road at once. For three storeys that brings you to between 8 and 12 metres.

Working height follows from the height of your deck plus roughly two metres that you bridge with your arms. Want to be spraying at eleven metres, then your platform sits at around nine. On this job you may not use that reach to the full: working straight ahead of you gives a more even face than aiming the gun upwards, where the film thickness varies. So reckon on the generous side. What a build to eleven metres of working height involves is shown on that page.

Tower carried up a front wall to the topmost edge, the height a complete sprayed surface demands of a hire

Take your starting point where the wheels will stand. If the drive falls away towards the road, your departure level is lower than you judge from the front door and you miss just that bit at the top. Come half a metre short and you can only finish the top band in a second session, and that is precisely when you see the join. If the surface runs on above the second floor, order one platform more.

Position the mobile scaffold where the drift reaches nobody

When spraying a facade you pick your standing places not only on the ground but just as much on the wind direction. Everything you atomise travels with the wind and settles further along, so first walk round the house and look at what stands downwind: parked cars, a conservatory next door, a shed roof, a pond. Move what can be moved and cover carefully what stays, the neighbours' windows included. Only when that round is done do you decide where the first setup goes.

The ground itself asks the usual: level, load bearing and wide enough to set the four stabilisers out fully. Along a wall the familiar spoilers turn up, from a projecting cellar entrance to a row of flower boxes and a low wall round the patio. Clear those away before the parts are delivered, because dragging something off while the tower already stands costs you half an hour you do not have on a spraying day. On sloping terrain there is the article on uneven ground.

Stabilisers swung out beneath a tower on paving, marking the level ground every standing place along the wall needs

Reckon as well on having to walk the wall round at the sides. A sprayed face rarely stops exactly on the corner: there is a reveal, a frame return or a bit of side wall attached to it that has to go too. So keep room free there, so that you can drive the setup round the corner without unscrewing a fence first. If part of it stands on public ground, ask in good time what is allowed in your street before your delivery day is fixed.

Calculate how many days to hire the mobile scaffold

The spraying itself is short, the preparing is long. The wall of an ordinary terraced house is covered in a few hours with a unit working well, but before that lie days of cleaning, touching in bare patches and masking. Windows, doors, the meter box grille, the sills, the downpipe and the plinth all go under film and tape. Four to six days of hire is therefore usual for a complete facade, even though the gun runs for only half a day.

The awkward part is that the spraying day has to fall in a dry window. You need a day on which it does not rain, on which the wind is moderate and on which the wall is not baking in the full afternoon sun. Such a window can be judged a few days ahead at best, so you want to be able to shift your planning without it costing you anything. Finish all the masking before you pin a day, and keep the spraying moment open in your diary as long as you can.

Mobile scaffold built along a side wall, the setup you only put to work on a dry, still day

That is exactly why you book generously here. The opening 24 hours carry the full rate; after that every extra day is added with 95 per cent off, so two or three days of slack cost you almost nothing against the certainty they buy. Have to book again because your window shifted, and you start with a full day and an extra transport once more. On judging such a period there is this article on rental days.

Which mobile scaffold suits spray-painting a facade?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Spray the wall faces in a fixed order from the platform

Divide the facade into faces before you start and settle the order. The usual route is from the top down and away from the windward side, so that fresh drift does not land on what you have just done. Begin at the gable or the top band, finish the full width, drop a level and repeat. A deck of 245 cm sets how wide each pass is and where your vertical joins come to lie.

Put the vertical joins deliberately where the eye does not look for them: behind a downpipe, right on a corner, along a pilaster or against the side of a window opening. Within one setup always finish the full height before you drive the mobile scaffold on, because a horizontal break halfway up a face always shows in raking light. On a wall ten metres wide that gives four or five setups, and those four or five moments are the only stops you have.

Mobile scaffold set against a wall, the platform covering roughly two and a half metres of width per pass

Take up in one climb what has to be up there: spare tape, a cloth, a knife and some sheeting to screen a miss quickly. Climbing down in the middle of a face costs you more than time alone, because the edge you leave behind is drying meanwhile and will show later. What people misjudge most is how many hours the screening swallows against the spraying. Take in spraying the window frames as well and the number of edges to protect doubles.

Arrange delivery and build when you hire for spray work

You receive the mobile scaffold as a complete, counted set of loose parts. Point out a place for that stack beforehand, somewhere outside your spray zone, because anything within a few metres of the wall will catch drift. A closed garage or the side of the house beats the drive right in front of it. Reserve on a weekday and manage it before 15:00, and the set may stand there the next working day, at the moment you named yourself.

Assembly stays your task. You have the manual and an instruction video to hand, and with two people building takes about half a day of work. On this job your delivery date is above all a weather decision: let the set arrive a few days before the expected spray window, so you can assemble calmly and still have all the time to clean and mask. Say at reservation whether the van can get onto your drive, because a set that ends up at the street you drag round yourself.

Scaffold parts delivered on site, ready to be built into a setup well before your spraying day arrives

Once the sprayed face is dry you take the tower down, lay everything out complete and we collect the set on your collection day. Wait with dismantling until it is genuinely hard, because a tube tapping against a fresh coat leaves a mark you will not polish out. Give the platforms a wipe before you hand them in. Which amount applies for the run to your province you find under the delivery rates per province.

Secure the platform before you spray the whole facade

A platform on these scaffolds carries 200 kg for every square metre: load class 3, the level EN 1004 sets for mobile scaffolds. On facade spraying you seldom come near that limit, unless two of you stand up there with a good stock of material. More important is keeping the deck clear, because rolls of sheeting rolling about loose are the real trip hazard here. What the class covers is explained in the article on this standard for mobile scaffolds.

The fixed rules do not bend on this job. Lock the wheels before the first person climbs up, leave deck and rail empty when you move the setup, and get down as soon as it truly blows. That wind limit sits lower on spraying than on other facade work, because even a stiff breeze carries your material away and makes your film thickness irregular. After every pass along the wall check that the four stabilisers stand firm and that all the brakes are on before you climb.

Complete set of scaffold parts laid out side by side, the starting point for a stable setup along a wall

The danger that belongs to this job is your sight. With a mask on and a cloud in front of your face you see the edge of the platform less well than you think, and a deck that material has settled on turns slippery besides. So lay cardboard or thin plastic on it and change that as soon as it starts to shine. Keep the zone straight under the platform clear as well. The remaining agreements you find at the guidelines for working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for spray-painting a facade

1

Walk the facade the day before with tape in hand and note per face what has to be masked. On your spraying day you do not want to think any more, only to keep working.

2

Choose your first setup on the side the wind comes from and work with the wind. Nothing then settles on the faces you have already finished and there is nothing to touch up afterwards.

3

Let the film on the window frames run right down to the ground and fix it at the bottom. Stopping halfway leaves a little ridge at exactly eye level that you have to work back later.

4

Chalk off every standing place of the scaffold before you begin. If the spraying day still falls through, a day later you roll back to precisely the same positions without measuring the wall again.

5

Keep a reserve stock of tape and film to hand on the platform. Mending a tear in your covering from the deck costs three minutes, climbing down for it costs you a quarter of an hour.

6

Look at the forecast before you choose your delivery date and not after. Letting the scaffold come a few days earlier costs little, a missed dry window costs you a whole week.

Frequently asked questions

Frequently asked questions about spray-painting a facade

Which mobile scaffold do you hire for spraying a complete facade?+

For a complete wall surface the wide RS52 is the one to hire, its deck measuring 135 cm across. On facade spraying you drag rolls of film, tape and tools up with you and often somebody walks along keeping the edges. On a narrow scaffold of 75 cm you spend all day shifting those things, and that costs exactly the time your dry window does not have. Only a route in that will not take 135 cm pushes you to the narrow 75 cm version.

How does hiring a scaffold for spraying a facade go?+

Online you fix a version and a build height, state which day it may arrive and which day it goes back, and settle a fixed amount with the VAT included. The parts are set down at your address, you build up, mask and spray, and at the end you put the scaffold out dismantled so we can take it away. The one uncertainty in that chain is the weather, and at hire you tune your whole planning to it.

How many days of hire do you want when you spray a facade?+

Reckon on four to six days when you hire a mobile scaffold for this. The spraying takes half a day at most, but the cleaning, the making good and above all the masking fill the rest of your rental period. On top of that you need a dry, still day and that cannot be ordered. So take a few days of play, because if your window shifts you want the mobile scaffold simply standing there instead of booking again and waiting for another transport.

What does hiring a scaffold for facade spraying cost if it overruns?+

Your rental price follows from the chosen version and build height, with the run to your province on top. All amounts include VAT and sit together clearly on the page with hire rates, well before you have to commit to anything. If it overruns through the weather that is not so bad: only the first day counts in full, every day after it hardly counts. On a job waiting for one dry window that is the reason to reserve the tower generously.

What working height should you hire if the facade runs up into a gable?+

Then you measure to the apex of that triangle and not to the gutter. At three storeys with a gable above you are already heading for 12 metres of working height, with your platform standing at about ten. Always measure from the street level the wheels will come to rest on, and not from your threshold or the patio behind the house. Which build of the tower belongs to which height is worked out on the page with working heights.

Can the scaffold be delivered before the day I spray?+

Yes, you pick the delivery date yourself, and on this job that is a decision you base on the forecast. Let the mobile scaffold come a few days before your expected spray window and you have peace to build, clean the wall and mask everything neatly. Collecting it yourself is possible too, by appointment and free of charge in Amsterdam, provided the longest parts fit in your van or on your trailer. For a spray job most people still choose delivery.

Does building it come with hiring a scaffold for facade spraying?+

No, assembling, moving and dismantling stay your work; we take care of the bringing and the fetching. Plan half a day for it, well before your spraying day, because finishing building, cleaning and masking on the same morning is simply not going to work. You will not find facade scaffolding, system scaffolding or a cherry picker with us at all. For inside work take a room scaffold from the range, which passes through an ordinary interior door.

Can I hire for longer if my spraying day shifts through rain?+

Yes, tell us and the collection date shifts with it, as long as the mobile scaffold has not been promised to somebody else. On facade spraying this happens more often than on other work at the wall, because you depend on one dry, quiet day. So reserve a few extra days in your rental period from the start. Shifting within your reserved period costs you nothing extra, and returning early is always allowed if the window is kind.

How much room has to be clear round the setup when spraying?+

Besides the width of the scaffold you count in the splay of the stabilisers, plus a strip in which nothing stands that could catch drift. In practice you want a level run over the full length of the wall, and outside that a zone where no car, bike or piece of garden furniture is left waiting for damage. Think of the corners too: you must be able to drive the tower on to the reveals and the bit of side wall.

What if it keeps blowing on the days I hire the scaffold?+

Then you do not spray and you leave the mobile scaffold standing. Wind blows your material over the boundary and makes the film thickness uneven, and you do not repair that afterwards. Use such a day to mask further, touch in bare patches or prepare the next face of the wall. Because you settle your own collection date, waiting for a quiet morning usually costs you at most one extra day of hire on your bill.

How does the deposit work when you hire for a spray job?+

A deposit stands open throughout your rental period and is transferred back within one working day of return once the set has been counted. On spray work what counts is mainly whether material has been left on the tubes and platforms, because material bonds to aluminium tubes just as well as to the brickwork of your wall. So lay a sheet of covering on the deck before you start. The settlement is described in the explanation of the deposit.

Do I have to spray the whole facade at once or may I work in parts?+

Working in faces is allowed, provided you choose the boundaries cleverly. Within one continuous face you do not stop: you finish that completely from the top in one pass before you drive the scaffold along a stretch. Between two faces a pause is fine if the division falls on a corner, a pilaster or a downpipe. So reckon at hire with the number of faces, because that number sets the number of setups and with it the length of your rental period.

Hire a mobile scaffold for spray-painting a facade today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.