See your price
Application

Painting a bay window? Choose the right scaffold.

A bay window juts forward out of the wall and so has three faces with two external corners between them. You will not get round it with a scaffold that stays in one spot: you have to work right round, and the little roof of the bay sits exactly where you want to pass. For that you hire an RS51, the narrow 75 cm version, built up so the working height lands between 6 and 8 metres. Below: where to measure, which pitches you need and how many hire days go into it.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a bay window we recommend the Narrow mobile scaffold.
  • For painting a bay window you hire the RS51 of 75 cm, because the side faces leave little room to the boundary.
  • Three faces and two corners mean at least three pitches, so you shift the tower more often than along a flat wall.
  • The bay roof projects, so the mobile scaffold always stands a way off the surface and that eats into your reach.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for painting a bay window?

Safe, stable and professional work at height

At a bay window the problem is not the height but the shape. A flat wall you do in bands beside one another; a bay forces you to stand square to a different face each time, with two external corners where the paint has to meet from both sides. On top of that the little roof gets in the way as soon as you climb: you can no longer bring the tower up to the wall, so you stand further off and reach at an angle. Renting a mobile scaffold for a bay window therefore means choosing narrow, choosing a model you shift easily and choosing a bit of extra working height, because that distance to the surface eats your reach.

  • Three faces with two external corners between them
  • A narrow strip along the side faces
  • Working height 6 to 8 metres above the bay roof
  • The projecting roof costs you reach height
Read more about working safely →

Which mobile scaffold to hire for painting a bay window

The measurement that counts at a bay window is the width of the strip beside the side face. Between the bay and the hedge, a low wall or the boundary there is often not even a metre left, and the pitch has to fit there with its stabilisers out. That is why the choice falls on the Altrex RS51, the model that comes out at only 75 cm wide. Survey that narrowest spot before you commit, because it governs your whole layout. Which reaches are available shows at the range of narrow mobile scaffolds.

The front face of a bay is usually two to three metres wide, so a 245 cm platform puts you in front of it in one go. The two side faces are a good deal narrower and each asks for a pitch of its own in which you use only part of that platform. That is not waste: you need the length to take the external corner and the piece of frame around it from one fixed spot without stretching.

Narrow mobile scaffold pitched along a side elevation, the width that still fits beside the side faces of a bay

The wide RS52 of 135 cm is mostly a millstone here. On the sides it often will not go between the bay and the boundary, and every time you have to get it round a corner you spend longer lifting than painting. If you work in pairs and a lot of material goes up, you could consider that width for the front face alone. The size difference between the models is laid out in the dimensions of mobile scaffolds.

Working height to hire above the roof of a bay

At a bay window you seldom measure to the bay roof itself. That flat little roof sits around three metres, but the paintwork nearly always carries on: the frame of the floor above, the fascia of the bay roof, the cheeks and sometimes a stretch of wall up to the gutter. Take the highest point that goes in the colour as your measuring mark. If that brings you out between four and six metres, a reach of 6 to 8 metres sits comfortably around it.

That booked reach is your platform height with about 2 metres on top that you bridge standing with your arms up. At a bay you mentally take something off again, because you are not up against the surface: the bay springs sixty to ninety centimetres forward and pushes the tower away. What you win vertically you lose on the diagonal. So take the top of the range rather than the bottom, certainly if you are taking in the floor above as well. Otherwise look at working on the first floor.

Mobile scaffold assembled at the front of a house, the sort of reach you need above a bay window

Measure from the place your castors end up, not from the sill of the front door. In a front garden the paved path often lies a step lower than the doorstep, and a border again lies higher than the path. Get it tight and you find yourself at the top fascia of the bay roof with your arms stretched over a projecting edge, exactly where you need the most sight and the most control. The page on 8 metres of working height shows that build.

Hiring a tower and pitching it round a projecting bay

A bay window stands almost always in the front garden, and that makes the standing place harder than at a straight wall. For the front face you are usually on slabs or a path, but for the two side faces you end up in the border, on gravel or on grass. Put slabs or stout planks under the castors there, because a scaffold foot that sinks into wet garden soil while you work pulls the whole pitch out of true. Check as well whether a soakaway lies underneath.

Count on the four stabilisers splaying outwards at every pitch. At the front face that usually works; at a side face one of them sticks over the hedge, over the wall or over the neighbours' boundary. Walk that through beforehand and prune or move whatever is in the way, because you do not want to discover halfway that a leg cannot come out. How to set a pitch firmly when not everything is clear is in the piece on stabilising.

Stabilisers at the foot of a mobile scaffold, which in a border beside a bay have to rest on planks

Look too at what sits on the bay itself. A drip mould, a projecting plinth or a sill that stands proud decides how close you can get. The same question applies to the downpipe on the corner and to the cables of a sun blind. Survey the clear space at the narrowest of the three places, because that decides which pitch you hire. If it will not fit there, you do that face from a lower setting and that costs you an extra build.

Bay window scaffold hire: how many days to reckon on

At a bay window do not count in square metres but in transitions. Three faces, two external corners, the underside of the bay roof, the top fascia, the cheeks and the frames with their junctions: those are all edges where you have to be precise, and edges cost time. The real painted area is perhaps twenty square metres, yet you are half a day on it per coat purely through the number of times you change posture.

Add the pitches to that. Three positions is the minimum, four or five is more realistic if you carry on above the bay as well, and every move costs you half an hour including the re-levelling. With sanding, a primer and two finish coats you land on four to five hire days. Rot in the cheeks brings repair with it and one more day of rental. An estimate per job you will find in the piece on how many hire days a job takes.

Assembled mobile scaffold along a modern house, standing as it does at a bay between two coats of paint

At a bay a generous booking costs you almost nothing. In your rental price only the first twenty four hours count at the full rate, and every day you stick behind that gets 95 per cent off. That means a booking of five days differs little from one of three, while you do get the calm to let a coat harden through before you touch in the corners. So plan the collection day behind the day you think you will be finished.

Which mobile scaffold suits painting a bay window?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting a bay window: three faces and two corners

From a platform you cannot work round a corner, and at a bay window that is the heart of the planning. Finish every face right into the corner and stop there with a tight, wet edge. Begin at the side face that is least in view, then go to the front face and end with the second side face, so the visible join lands on the least conspicuous corner. The difference in colour between two pitches then stays invisible.

The bay roof itself is your biggest obstacle up high. As soon as you want to get past it, the scaffold stands half a metre or more off the wall and you are working over the little roof. Lay a sheet or an old rug on it first: every drop that falls comes down on that flat surface and stays there in plain sight. Make sure you have everything with you in one climb, because coming down at a bay usually means realigning the whole pitch again.

Mobile scaffold set against a wall with window frames, the pitch you realign for each face of a bay

Moving is seldom done by rolling here. Getting from the front face to a side face often takes the upper frames off, because you have to bring the pitch round a garden wall or a border. Reckon on that in your day, and not on five minutes of pushing. What people underestimate is the number of small surfaces: the reveals of three frames, two corner beads and the underside of the little roof weigh more together than the big front face.

Renting with delivery at a bay in the front garden

The parts come to your address as a complete, counted set and that stack needs room. A front garden with a bay in it is usually just too small, so choose a spot in advance: the drive, a piece of pavement beside the hedge or the garage at a pinch. Do not lay the frames in the border where the pitches are going, and not against the bay either, because that is precisely the timber you will be sanding first.

When the mobile scaffold arrives and when it is fetched again you fill in yourself at the booking. Order on a working day while it is not yet 15:00 and your order rides out the next working day, so the delivery can be planned tight against your starting date. For outside work at a bay you look at the forecast as you do it: a dry run of days is worth more than an early start, because a wet corner costs you a whole coat.

Counted scaffold parts dropped off at a house, the set you hire for painting a bay window

The rigging falls under your tasks. A manual goes along and an instruction film is ready, but we do not come and stand it up for you; with two people a pitch at this height takes about an hour. Once the last coat is on you take the lot apart and lay all the sections together, after which we come to fetch them. Want to skip the bringing? Then you can pick the set up yourself at Zeeburgerpad in Amsterdam, by appointment and at no cost.

Working safely on the tower beside a bay roof

A mobile scaffold from hire is built to EN 1004 and its platform belongs in load class 3: two hundred kilos per square metre. That applies to the platform and to nothing else. The little roof of the bay below you is not a working floor: thin roofing on light boarding, never meant to carry someone with a bucket. Setting a foot on it can easily cost you a leak above the bay windows. What the class involves you can read in the explanation of this standard.

The basic rules stand here too. Lock the castors before you go up, let nobody stand on the mobile scaffold while it is being rolled, leave no tin of paint on the platform when you move it, and get off it once the wind starts to pull. At a bay that last one applies sooner than you think, because the moment you rise above the little roof you also rise above the shelter of the hedge and the front garden. After every move, check that all four stabilisers press firmly on their ground again.

Scaffold tower with double guard rail and built in ladder, the safe way up for paintwork round a bay

Two risks belong specifically to this job. The first is glass: a bay is window on three sides, and a scraper or a tin falling four metres goes straight through. The second is the temptation to step onto the bay roof for that one edge; do not, but move the pitch instead. Keep the path beneath you clear as well, since a front garden is after all the route to the front door. What else has been agreed you can read at working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a bay window

1

Number the three faces of the bay in chalk on the pavement and write beside each which pitch belongs to it. With four moves per coat you otherwise lose track of which corner has had two coats already.

2

Lay an old rug or a sheet on the bay roof before you do the top fascia. Everything that drops lands there, and a spot on roofing will not come off again without sanding.

3

Sand and prime all three faces first and only then start finishing. That way you move the mobile scaffold through two rounds instead of six, and it saves you close to a whole hire day.

4

Measure the narrowest way through to the side of the bay before you book. If the pitch will not go between hedge and wall there, a wider model gets you something you cannot use.

5

Finish the external corners with a wet edge you pull through in one go from the same platform. A corner done in two sessions always leaves a line that shows in low sunlight.

6

Put the wheelie bin and the bikes somewhere else for those days. Around a bay you shift the tower more often than at a flat wall, and each time you want a clear route round the house.

Frequently asked questions

Frequently asked questions about painting a bay window

Which mobile scaffold should you hire to paint a bay window?+

Take the RS51, the narrow version at 75 cm wide. What decides the fit is not the front face but the strip along the sides of the bay, and there a hedge, a low wall or the boundary usually sits right beside you. To hire a mobile scaffold in the wide build makes little sense if you cannot get it into two of the three places. On the front face you hardly miss that extra width, since you work with brush and roller.

How does hiring a scaffold for a bay window run exactly?+

You pick a model and a reach online, choose your own delivery date and your own collection date and pay a fixed rate including VAT. The counted set arrives at your door, you put the mobile scaffold together, paint the bay in stages and shift the pitch per face. At the end you break it down and put everything together, after which we fetch it. The handiest thing is to set your pitches out on paper first.

For how many days will you hire a mobile scaffold at a bay?+

Four to five hire days is realistic for most bays. You have three or more pitches, and per coat you are longer at it than the area suggests because of all the corners, fascias and frame junctions. Drying time between the coats comes on top and cannot be compressed. Rot in a cheek adds a day for the repair. Since you choose the collection date yourself, take that margin along as you book.

What does a bay window cost in mobile scaffold hire?+

The hire depends on which model and which working height you take, and beside that stands a fixed fee for bringing it and taking it away again within your own province. All the rates appear with VAT in them on the page with the prices. The nice thing at a bay is that the first day weighs most and the days after it barely count, so booking one longer period is cheaper than two short hires with a gap.

Which working height to hire if the bay sits under an upstairs window?+

Measure to the highest point you are still putting in the colour, usually the top of the frame above it or the junction with the wall. If that sits around four to six metres, take a reach of 6 to 8 metres. Add something because the bay projects and the scaffold therefore stands further off the surface than at an ordinary wall. Which frames you need for that is on the working height page.

Is the mobile scaffold delivered or do you collect it from the rental?+

Both routes exist side by side. Choose delivery and the mobile scaffold drives to you on the day you pinned and goes away again after your last coat, for an amount that is fixed per province. Want to drive yourself and the set is ready for you by appointment, provided your van can take the length of the frames. At a bay in a front garden many people go for having it brought, because the drive then stays free for the rest of the job.

Do you put the mobile scaffold up if I hire it for the bay?+

No, you arrange that yourself. With the hire the full set goes along with a manual, and online you can look the build order over again. With two people a first pitch round a bay takes about an hour, and of every move after that you repeat a part. Cherry pickers, facade scaffolding and system scaffolding are outside what we do, so a bay at this height brings you to the mobile scaffold anyway.

What if the work on the bay runs on and I want to hire longer?+

Ring or mail as soon as you notice it will not work out, and we move the collection day if the mobile scaffold is not yet planned for someone else. At bays it overruns more often than expected, usually because more rot turned out to sit under the fascia of the little roof than was visible. If you want that covered, simply add a day when you book. Returning it earlier is allowed too.

How much room must be free beside the bay when you hire?+

Take the width of the tower and add what the stabilisers stick out on both sides, then survey that at the narrowest of the three places. In a front garden that comes down to about two metres of free, reasonably flat ground along each face. Hedge, wall, water butt and planters you take away a day before delivery. Do not forget that the stack of parts also needs a place for as long as you hire.

Can I hire on if rain falls inside my hire period?+

The mobile scaffold can quietly stay where it is; you only push the painting back. Damp in an external corner of a bay dries away slowly, and a coat laid on clammy timber you will see back later as a dull patch. Spend such a day on sanding, sealing or the timber repair, and pick the finish coat up again on the first dry morning. Because the end date is in your hand, that delay costs a day at most.

And the deposit, when is it back after the hire?+

A deposit stands against the mobile scaffold while you hire, and as soon as everything has been counted back that amount returns within one working day. So watch the small parts: the stabilisers and the castors you took off while moving round the bay are the quickest to go missing in a border. Paint on the platforms counts too, so cover them while you work. More on that in what happens to the deposit.

Can I take the front elevation above the bay in the same hire period?+

You can, and it is often sensible because you already stand high for the top of the bay. Bear in mind that you must then be able to pitch the mobile scaffold beside the bay instead of in front of it, and that the reach you hire has to get to the roof edge. Two extra hire days are usually enough. How that job hangs together is on the page about painting a front elevation.

Hire a mobile scaffold for painting a bay window today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.