See your price
Application

Painting a rear facade? Choose the right scaffold.

Painting a rear facade starts with the question of how you get there. The way round the back runs through a gate, along a path beside the shed, or straight through your own hallway into the garden. Once there the scaffold stands on grass, on paving, or on a patio that falls away towards the fence. Two storeys ask for 6 to 8 metres of reach, so you hire the narrow 75 cm mobile scaffold. This page covers which model fits round the back and how many rental days to book.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a rear facade we recommend the Narrow mobile scaffold.
  • A rear facade over two storeys calls for the RS51: 75 cm narrow, with a reach of 6 to 8 metres working height.
  • Measure the gate, the bend by the shed and the narrowest stretch of garden path, because that route decides your model here.
  • Grass sinks after rain, so slide levelling plates or spare paving slabs under the wheels and check the setup every morning.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for painting a rear facade?

Safe, stable and professional work at height

At the back of a house everything that makes a scaffold choice awkward comes together. The wall is busier than the street side, with an extension, a kitchen door, a dormer and sometimes a balcony. The ground is garden rather than paving. Between the wall and the boundary there is usually less room than you expect, with neighbours watching from both sides. That makes the route in, the width and the build order weigh heavier here than on any other elevation. Anyone who hires a scaffold for this picks not only on height, but on what still fits round the back and on what the garden can carry. A ladder on soft ground is no serious alternative.

  • Gate, garden path or hallway as the only route
  • Grass or patio that sinks after rain
  • Roof edge two storeys above the back garden
  • Fence and boundary close behind the scaffold
Read more about working safely →

Which mobile scaffold to hire for painting a rear facade

Round the back it is not the wall that sets the model but the route to it. That is why the Altrex RS TOWER 51 comes first here: at 75 cm wide it passes through almost any garden gate. You reach the back through that gate, along a path between shed and fence, or with every part carried down your own hallway. The narrowest point on the way decides what can stand there at all, so hiring a mobile scaffold for the back starts with a tape measure in the gateway.

On the deck you barely notice the narrow width. Painting asks for a tin, a brush, a roller and a sanding block within arm's reach, and all of that sits happily beside your feet on 245 cm of platform length. That length is what does the work here: along a rear facade you slide from window to window and finish a whole strip without climbing down. Extra width mainly means extra parts to carry through the gate, and you feel that at every bend and every threshold.

Narrow 75 cm parts on a drive, pieces sized to pass a garden gate on the way to the back

Choose the wide RS52 at 135 cm instead and you need a double gate in the fence or a drive that runs right into the garden. With that room the broader deck is pleasant for a lot of joinery or for two painters side by side, and both sit in the same selection of mobile scaffolds you can hire. The RS44 room scaffold slips through an interior door from about 70 cm but reaches only 3 to 4 metres, so it stays indoors.

Which working height to hire for a two storey rear facade

The highest point at the back is usually the roof edge, or the top of the gable on a pitched roof. For two storeys that means a reach of 6 to 8 metres working height, with your platform at 4 to 6 metres, because above that platform you still have roughly 2 metres of reach with a stretched arm. If you are taking in a dormer in the rear roof slope, measure to the top of that and not to the gutter, since it easily costs a whole storey in the build you hire.

Start measuring at the level where the wheels will actually rest, because at the back that is seldom flush with the pavement. A garden half a metre below street level hands you exactly that extra half metre to bridge. If the patio falls away towards the fence, take the lowest wheel point. Standing on grass with levelling plates underneath, count their thickness as well. Which reach matches which build appears on the page for eight metres of working height.

Mobile scaffold built up along a side elevation to just under the roof edge, the reach a rear facade needs

Choosing tight is punished twice round the back. Half a metre short at the roof edge means painting with stretched arms, an uneven coat and a result you look at from the patio every day. Adding something on the spot is not an option either, because the room is not there and the ground is too soft for a loose step. Caught between two builds, hire the taller one. How much a storey adds in metres is set out at the height of a first floor.

Hiring a mobile scaffold for a rear facade: garden setup

Behind a house the ground is rarely as flat as it looks. Grass gives the moment rain has fallen, old patio slabs sit loose and gravel shifts under a loaded wheel. Slide levelling plates, thick boards or spare slabs underneath and check with a spirit level before the second lift goes on. Walk round again after the first night, because a garden that has turned wet lets a wheel drop a centimetre. What to do with a difference in level is explained in the piece on uneven ground.

Around the base you need more room than the tower itself takes up, because the four stabilisers point outwards at an angle. In a back garden they land on exactly what belongs there: the water butt, a canopy, the outside tap, planters against the brickwork and the crawl space hatch. Clear that strip before delivery, because shifting things halfway costs you an hour. An extension or a low kitchen wing pushes you further from the wall you are painting, and you feel that in your reach immediately.

Stabilisers angled outwards beneath the base of a mobile scaffold, showing the space you keep clear in a back garden

The boundary at the back often sits two metres from the wall, so your setup almost certainly touches the neighbours. Tell them when the scaffold arrives and how long it stays, especially when stabilisers reach over the fence or you need their paving to move along. Decide too where the stack of parts lands: not on the grass you have to push the tower across, and not in front of the shed door where your tools are. Half a metre of slack along the fence makes every move calmer.

How many rental days for painting a rear facade

A rear facade is almost never finished in a day. First wiping down and sanding, then repairing rot and sealant lines, then priming and two topcoats, all of it over the full height per setup. For two storeys with four to six window frames you are realistically looking at four to six rental days, spread over three or four positions. Working alone, add a day: moving and levelling again takes longer in a garden than on the street, where you simply roll the tower along.

There are hours in there when all you can do is wait. Before a second coat goes on the first has to harden, and the product sets that pace, not your diary. Then there is the aspect: a north facing rear facade stays damp, dew lifts late in the morning and the fence holds the shade. So do not plan your rental period around the day you could be finished, but around the day it is certainly done, with a morning of clearing up behind it.

Scaffold parts by the front of a house, the load that has to go through to the rear before any painting

Booking generously costs little. The full rate covers the first 24 hours only, and each day after that is 95% off, so one spare day for wet mornings barely shows in the total. It gets expensive only when you book too tight and have to hand the tower back halfway through the second coat. Put your end date a notch behind your last painting day. How to estimate such a period is covered in the guide to rental days.

Which mobile scaffold suits painting a rear facade?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting the rear facade from a 245 cm platform

Per setup those 245 cm of platform cover a good two metres of wall. Finish that strip completely before you shift: first the top edge and the fascia board, then the brick or render, then the window frame within reach. Nothing needs a second visit and your joins stay on one vertical line. Put that line where it disappears, on a corner, behind a downpipe or along the side of a frame. At the back that is usually the corner by the extension or the seam beside the kitchen door.

Before you roll, clear the deck. Tins, brushes and abrasive paper go down first, because a mobile scaffold must never move with materials or a person on it. In a garden there is extra work: levelling plates come along, wheels run heavy over grass, and getting over a patio edge usually needs a second pair of hands. Allow half an hour for each move and plan it for a moment when the paint has to dry anyway, so you lose no working time.

Mobile scaffold with platform and guardrails against a wall, the 245 cm strip you paint from one position

How many positions you need almost always disappoints. Eight metres of rear facade already asks three to four per coat, and an extension or kitchen door adds another because you cannot get flat against it. Doing the window frames at the back in the same visit adds pauses for masking and drying. Every extra position stretches your rental period, and that is exactly the sum behind your delivery date and your collection date, so count the positions out before you fix a period.

Scaffold hire round the back: delivery and collection

What comes to you is a complete set of loose parts, counted. The van stops at the road, so the stretch to the back is your job: frames, platforms, braces and guardrails go through the gate or down the hallway one at a time. Decide beforehand where that stack lands, ideally within a few metres of the build spot. A booking placed before 15:00 on a working day arrives the working day after, and that certainty helps you fix your first painting day.

You put the delivery day and the collection day in the diary yourself. For a rear facade the day before your first coat is usually easiest, so the build can happen calmly. Building is your task, with the supplied manual and the video beside you. Round the back it pays to lay the parts out in build order, because walking around a stack does not happen in a narrow garden. The step by step build guide follows exactly that order.

Counted set of scaffold parts laid out on grass, ready to build behind the house after delivery

We collect, you dismantle. Put the parts complete at the roadside, because carrying them back through the gate takes as long as the way in, so keep half a day free again. Wait until the paint is dry, or you press wet gloss against the tubes. Count the parts as you take it apart and collection day holds no surprises. What delivery and collection cost in your province is on the page with delivery charges per province.

Safe scaffold work at height in a narrow back garden

The deck you stand on is rated for 200 kg per square metre, the limit that belongs to load class 3 in scaffold standard EN 1004. For painting that sounds generous, until two people are up there with a bucket of water, a tin of primer and a toolbox beside them. Add it up before everything goes up at once, and spread it across the floor rather than stacking it against one guardrail. There is more in the explanation of this standard.

The fixed rules apply just as hard round the back. Brake the wheels the moment you take the first rung and never move the tower with anyone or anything on the deck. Stop when it starts to blow hard, and do not underestimate that wind because a garden feels sheltered, since above the ridge and along an open rear boundary there is still a fair flow. Check all four stabilisers again after every move and set them down firmly before anyone climbs.

Tower assembled in a gap between a brick wall and a hedge, the tight kind of spot a back garden gives

The risks on this job sit mostly below. A garden is where children, dogs and visitors walk underneath you, and a brush falling 6 metres lands hard. Fence that zone off with a few garden chairs or a length of tape. Watch for slippery slabs early in the morning and moss along a north facing patio, because a wheel slides away there. Sweep the carrying route before the first parts go round the back. The rest is in working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a rear facade

1

Measure the gate and the bend in the garden path with a tape before you book. A 75 cm frame usually goes through, but manoeuvring a long brace around that corner is another matter.

2

Lay the parts down in build order: wheels and base frame first, then the platforms, then braces and guardrails. In a narrow back garden you cannot walk around that stack to fetch something.

3

Mark with spare slabs where the wheels belong at each position. Come back after a shower or a break and you set the tower on exactly the same point, so your join still runs straight.

4

Warn the neighbours when the scaffold arrives, certainly if it stands against the boundary. That one message beforehand prevents trouble halfway through your rental period, when moving is no longer a realistic option.

5

Haul paint and tools up in a bucket on a rope rather than climbing with a tin in your hand. Both hands stay free and the deck stays clear of anything you could trip over.

6

Book the collection a day after your last coat goes on. That leaves you a morning to dismantle, carry everything round to the road and stack the set dry and complete.

Frequently asked questions

Frequently asked questions about painting a rear facade

Which mobile scaffold is the right hire for a rear facade?+

The RS51 at 75 cm, in almost every case. That width is not chosen for the platform but for the way in, because a standard garden gate and a path beside the shed leave little more. Up top you never miss the extra centimetres, since tin and brush stand beside your feet. If you can get a trailer into the garden, the wide RS52 at 135 cm is still there to hire, for instance when two of you work up there.

How does hiring a mobile scaffold for the rear facade work, from booking to collection?+

You fix the model, the reach and your two dates online, and the price is set beforehand including VAT. On the agreed morning the counted set of your mobile scaffold stands at the street. You carry it round, build it and start painting. Once the last coat is dry you take it apart and put the parts back by the road, after which we take them away. Only the half day for building and dismantling asks for tight planning.

How many days do you need to rent a scaffold for a rear facade?+

Four to six rental days is realistic for two storeys with a few window frames. Sanding, repairing, priming and two topcoats do not fit into a day, and in between you wait for drying. Spread that over three to four positions of the tower. If you take in the joinery of a dormer, add a day straight away. A north facing garden dries slowly, so that margin is rarely wasted on this job.

What do you pay to hire a mobile scaffold along a rear facade?+

The rate follows from which model you pick and how high it has to reach, plus bringing and fetching in your province. Every amount is listed including VAT on the rental price page. For a rear facade it is worth booking one continuous period instead of twice for a few days, because paint on a shaded wall often turns out not to be dry when you planned. Count the transport into your budget once.

What working height should you hire for a rear facade of two storeys?+

Six to eight metres, with the deck at four to six. You measure from the garden level where the wheels will stand up to the highest edge that still gets paint. If your garden sits lower than the street, you hire more height than your neighbour needs for his front elevation. On a patio that falls away, measure at the lowest wheel point and not by the kitchen door. Which tower suits which reach is on the working height page.

Can delivery of a hired scaffold reach into the back garden?+

The driver puts the set as close to your house as possible, but the last stretch round the back you carry yourself, because no van fits through a garden gate. With two people that takes about half an hour. If you would rather drive, you can collect the hired scaffold free of charge by appointment in Amsterdam, at Zeeburgerpad, provided your transport takes the length of the frames. For a rear facade most people choose delivery anyway.

Is building included when you hire a mobile scaffold for the rear facade?+

No, assembly and dismantling stay your work. We bring the parts and take them away afterwards, but in the garden you build it yourself, with the supplied instructions and the video at hand. Allow half a day with two people, plus extra time because in a narrow garden you keep having to go around the stack. We supply no system scaffolds, facade scaffolds or cherry pickers, so at this height a mobile scaffold remains the choice.

What if the painting overruns and you want to hire the scaffold for longer?+

Tell us as soon as you see it coming, and if the tower is not yet promised to another customer we move your collection day. On a rear facade it regularly overruns, because on the shaded side drying sets the pace. If you would rather not depend on that, book an extra day straight away when hiring. You choose the end date yourself and bringing it back early is fine too, so a half glossed frame never stops your day.

How much garden space do you need to be able to hire a scaffold?+

Take the width of the tower and add the spread of the stabilisers on both sides, plus a level run along the wall so you can move along. In practice you want about two metres of clear depth. If a water butt, a barbecue or a bike rack is in the way, clear it before you hire and not during the build. The stack of parts needs somewhere to lie as well, outside the wheel line.

Can you keep the scaffold on hire when it is too wet to paint?+

The tower stands there quietly and you only push the painting back. Nothing bonds to a damp surface, and the back stays clammy longer than the street side. Use such a day for sanding under a sheet, cutting out sealant lines or repairing timber. Because you hold the end date yourself, a delay usually costs no more than one added day. Do take loose material off the deck when you stop, certainly with wind behind the rain.

What happens with the deposit after hiring a tower for the back?+

A deposit is settled in advance when you hire, and the money returns to your account one working day after the counted set comes back. Two things decide whether that runs smoothly: complete parts and clean tubes. Dried paint on platforms counts as heavily as a missing brace, so lay film on the deck while you are painting. Half an hour of cleaning on the last day saves trouble afterwards. Read how it runs at getting your deposit back.

May the tower stand on the boundary or half in the neighbours' garden?+

On your own ground you decide, but as soon as stabilisers stick over the fence or you need their paving to move along, just ask. Most neighbours are fine with it as long as they know how long the mobile scaffold stays and where the parts lie. Agree at once how you will work at a shared boundary. A quarter of an hour beforehand saves an awkward week with an argument over the fence.

Hire a mobile scaffold for painting a rear facade today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.