See your price
Application

Hanging a curtain rail? Choose the right scaffold.

Hanging a curtain rail is interior work where you are genuinely up in the air for only a few minutes per window. You drill three or four holes, fix the brackets, click the rail in and you are down again to roll the build on to the next window. Shifting it through a living room full of furniture is the real work here. For ceilings up to four metres you hire the RS44 room scaffold, a model that passes an interior door and reaches 3 to 4 metres indoors.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For hanging a curtain rail we recommend the Room scaffold.
  • For hanging curtain rails indoors you hire the RS44 room scaffold, a model that reaches four metres of working height under tall ceilings.
  • It goes through an interior door from about 70 cm, so you travel from room to room without taking anything apart.
  • You are up only briefly per window, so floor protection and shifting the build decide your pace and your hire period.
  • First 24 hours from €50 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldRoom scaffold (Altrex RS44)
Working height for this job3 to 4 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €2.50 a day
Why a mobile scaffold for hanging a curtain rail?

Safe, stable and professional work at height

With curtain rails the difficulty lies not in the height but in the moving. A living room with four windows means setting up four separate times, and between those positions stand a sofa, a coffee table and a cabinet nobody wants scratched. On top of that you are working on parquet, laminate or tiles, where castors roll sweetly and every dragged leg leaves a mark. Hiring a scaffold to hang curtain rails therefore comes down to three questions: does the model pass the doorway, can you roll it smoothly between the furniture, and is your floor protected against castors and dropped tools. Those three weigh heavier here than the metres you bridge.

  • Room scaffold passes an interior door from 70 cm
  • You are up high only briefly at each window
  • Three to four metres of reach is plenty here
  • Floor protection underneath and the furniture moved away
Read more about working safely →

Which room scaffold to hire for hanging curtain rails indoors

Indoors the Altrex RS44 is the model you reserve for this, a room scaffold that still goes in through a doorway from about 70 cm. That sounds like a detail, but on this job it makes an enormous difference: you roll it in one piece from the living room to the hall and from the hall to the study, without dismantling in between. Outdoors you would hire a mobile scaffold, but inside that leaves you with parts that fit nowhere. More about this model is at the room scaffold in our hire range.

Little has to go up on the deck for a curtain rail. A cordless drill, a masonry bit, plugs, screws, the rail brackets and a pencil is the whole list, plus the rail itself, which you usually pass up in lengths of two to three metres. That fits comfortably, even if you lay the rail at an angle over the guard rail while you make the first bracket fast. Generous work space is not the criterion here; nimbleness through a house of doors and thresholds is.

Scaffold parts set down by a front door, the set you carry inside piece by piece through the doorway

For a rail in an ordinary living room or bedroom a bigger build is actually a nuisance. You want to be able to swing it round on your own between a sofa and a dining table, and you do not want the base catching a skirting board every time. If your rail sits higher than four metres, in a void or a stairwell, the RS44 stops and another model takes over. Where the line falls is explained in the comparison of mobile and room scaffolds.

Which working height to hire for curtain rails under high ceilings

You measure on this job to the place where the rail brackets go, which for a ceiling fixing is the ceiling itself and for a wall fixing a little above the frame. In a house with plastered ceilings of three metres the RS44 gives you plenty, because this model builds a working height of 3 to 4 metres. Add about two metres of reach to your platform height and you know at once how far your hands come. The page on four metres of working height shows how that is put together.

Indoors you measure from the finished floor and not from the screed, because a thick underlay with laminate on top easily costs a few centimetres. If the room has a dais, a podium or a stair opening, your measuring point changes per window. Write the height down window by window before you book, certainly in an older house where the ceiling in the bay hangs a touch lower than in the rest of the room. A difference of ten centimetres only shows once you are up there.

Erected scaffold with platform and guard rails, roughly the height at which you reach a rail bracket indoors

Watch the distinction between what this model can do and what you enter when reserving. The RS44 goes no further than four metres of working height, so for a rail in a void or above a stairwell it is simply the wrong model. If you are only going round the rooms on the ground floor with normal ceiling heights, this room scaffold is exactly right and no heavier build is needed. Hiring more height has no use whatever indoors.

Hiring a room scaffold for curtain rails: its place indoors

Unlike outdoors, inside there is no garden or drive where you can set something down for a moment. The build stands in the middle of a furnished room, and the spot you need is usually under the window where the sofa or the dining table happens to be. So clear a strip of a good two metres in front of the window completely, the edge of the rug included, and put the furniture on the other side of the room rather than half a metre aside.

The ground indoors is slippery instead of soft. On laminate, parquet or a poured floor the castors roll nicely, and precisely for that reason the brakes go on the moment you stand still. Lay a piece of hardboard, an old carpet or thick floor protectors under the castors and the stabilisers, because one castor with a bit of grit under it scores a parquet floor in a single movement. Underfloor heating, a floor hatch or a thin loft floor wants extra thought, since the weight lands on four small points.

Castors and stabilisers at the foot of an erected scaffold, the parts that must grip on a smooth floor

Think as well about what hangs above and beside you. A ceiling light, a smoke alarm, a sloping bay corner or a pelmet limits where the build can stand. Sooner take the lamp out of its fitting than clip it while rolling past. Finally, measure the doorway to the next room before the delivery arrives, because a threshold strip or a door post that comes out slightly narrower brings your whole plan to a halt. What else interior work involves is worked out in this piece on scaffolding indoors.

How many days to hire a room scaffold for curtain rails

The work at each window is short. Marking, drilling, making the brackets fast and clicking the rail in costs you half an hour to three quarters in an ordinary situation. What fills the day is everything around it: moving furniture, laying floor protection, rolling the build along, locking the brakes and tidying up after every window. For the four or five windows of a ground floor that adds up to one solid working day, and it is exactly why people pitch the hire period too short.

Going through the whole house adds a day. The room scaffold passes from room to room, but a staircase is another story: there you take it apart and put it together again upstairs. Count that separate half day in as it comes, along with the carrying up and down the stairs. Drilling into concrete rather than plasterboard, or an old wall where the first plug gets no grip at all, also costs time you could not possibly have foreseen beforehand.

Complete checked set of scaffold parts, counted and marked as you receive it for your hire days

So there is no need to be mean when you reserve. You pay the whole rate for the first twenty four hours, and on every day you tack on to that you get 95 per cent off, which makes a spare day cost almost nothing and lets you plan calmly. An extra day is welcome if you only notice after hanging that one rail still has to be shortened. To judge such a period, the overview of hire days helps you along.

Which mobile scaffold suits hanging a curtain rail?

Most chosen
Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Hanging curtain rails from the room scaffold platform

What is peculiar about this job is the ratio between climbing and working. On a facade you stand an hour in the same place; here you are up a few minutes per window and then down again. So take everything up in one go and do not lay it loose on the deck, but in a small tub or a tool bag hooked over the guard rail. A plug bouncing off a wooden floor from three metres is lost among the furniture in no time.

With a long rail, fix the middle support first and work outwards from there. The rail then hangs while you shift along and you are not balancing three metres of aluminium above your head. With a ceiling fixing, mark all the drill points in one go while you are up there anyway, so you do not have to measure afresh for every hole. Over four or five windows that saves you more minutes than it sounds.

Assembled tower against a brick wall, a loose ladder leaning apart, the 245 cm deck you climb briefly at each window

You roll on with an empty deck and a clean floor. Look before you push whether a screw or a plug is lying under a castor, because that is exactly what draws a line across a parquet floor. Never let somebody else shift the build while you are still up there, not even over two metres. If you are painting the ceiling in the same round, plan it as a separate pass with the rails not yet in.

Delivery and building of the room scaffold you hire

The room scaffold is supplied as a counted set of loose parts, complete and ready to be carried inside. Work out in advance where that stack may lie: a corridor, the hall or an empty corner of the room where you start. Leaving it outdoors is seldom clever for interior work, certainly if it rains and you then carry the parts over your own floor. Anything confirmed before 15:00 on a working day is on your doorstep the next working day.

You choose yourself which day the delivery happens and when we come to fetch it again. With interior work the weather hardly matters, so you mostly plan around the day the curtains arrive or the floor fitter finishes. Building is your work, with the paper manual supplied and the video beside it; for this model two people are comfortably done inside an hour. The right order runs through step by step in the assembly instructions.

Delivery van with scaffold parts at the door of a house, the way the set arrives for an indoor job

Once every rail hangs, you strike the room scaffold and put the parts together somewhere we can get at them. Carry them out in two trips rather than dragging a whole frame down the narrow corridor. Bringing and fetching together carry a fixed amount per province including VAT, and the rate matching your address is listed with the costs of delivery and collection. Collecting it yourself is possible too, provided your transport takes the parts.

Working safely indoors on a hired scaffold at curtain rails

EN 1004 applies indoors just as much: your platform sits in load class 3, which stands for 200 kg on each square metre. With curtain rails you come nowhere near it, since you plus a drill and an aluminium rail amount to very little on that score. The real point is a different one: because you are up only briefly, people are tempted to leave the stabilisers folded in. Fold them out anyway. What the standard covers is in the note on the load classes.

On a smooth indoor floor the brake matters more than it does outside on grass. Four castors on laminate roll away at the slightest sideways shove, and you give that shove yourself the moment you press a drill against the ceiling. So lock every castor before you step on, check them again after each move, and never roll the build along while somebody or some tool is on it. Shifting even two metres counts fully as moving.

Scaffold parts bundled ready for transport, among them the guard rail sections you need for indoor work at height

The risk belonging to this job is standing beneath you: furniture, a glass coffee table, a television. A falling drill does more damage there than to the floor itself. Cover what you have not pushed aside, and keep pets and small children out of the room for as long as you are up. If you are drilling into a ceiling, allow for services in it and for dust dropping into your eyes. The general rules are gathered under working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for hanging a curtain rail

1

Measure every window and order your rails well before the room scaffold is delivered. Waiting on a rail that still has to be cut down can easily cost you a whole hire day standing idle.

2

Lay a run of hardboard or thick cardboard along the route through the room. You then roll the build over a level surface and keep sand and grit off your parquet.

3

Fold the stabilisers out indoors as well, however briefly you are up there. It is precisely on a short job that people forget them, and then you shove yourself sideways while drilling.

4

With a ceiling fixing, mark all the drill points for one window in a single go while you are up. Walking down for each hole separately costs you an hour over five windows.

5

Take the ceiling lamp out of its fitting before you slide the room scaffold under the window. Catching a lamp while rolling along is by far the commonest damage on interior work of this kind.

6

Keep the corridor between two rooms clear. You push the model through the doorway in one piece, but only if no shoes, boxes or threshold strips are lying in the way.

Frequently asked questions

Frequently asked questions about hanging a curtain rail

Which scaffold should you hire for hanging curtain rails?+

Indoors you hire the RS44 room scaffold. That model is meant for interior work, tops out at 4 metres of working height, and passes an interior door from about 70 cm. Because of that you roll it from room to room without dismantling, which is just what you want with curtain rails, since you are up only briefly at each window. A larger build gives you no advantage inside and will not fit between your furniture either.

How does hiring a room scaffold for curtain rails go from A to Z?+

You reserve the model and the height you want online, decide yourself which day the delivery falls and when we collect, and settle a fixed price with VAT beforehand. We unload the complete set, you carry it inside and put it together. After that you hang all the rails, strike the build again and set the parts ready. In the meantime the room scaffold is above all a rolling work platform through your house.

How many hire days do curtain rails take in one house?+

For the windows of a single floor one working day is usually enough. Going through the whole house, count on two days, partly because you take the scaffold apart for the stairs and build it up again above. If there is concrete in your ceiling or rails have to be shortened, it stretches further. Since an extra hire day barely counts in the total, you would rather book roomy than have to stop halfway.

What does hiring a room scaffold cost for this indoor job?+

You pay according to the scaffold model chosen and the height you end up at, plus the bringing and fetching to your province. The full rental price is listed with VAT on the page with our rates, so nothing is added afterwards. With interior work it usually stays modest, because you keep it to one or two days. The first day weighs most; whatever you attach behind it hardly registers in the total.

Which working height do you hire for a three metre ceiling?+

Then the room scaffold suits you well, because this model covers 3 to 4 metres of working height. Your platform stands at around a metre and a half and from there you reach a three metre plastered ceiling without stretching. Measure from your finished floor, so including the underlay and the laminate already down. If you are unsure about the build, the page with working heights shows which reach belongs to which model in our fleet.

Is the room scaffold delivered, or do you collect it when hiring?+

Both work. If you choose delivery, we unload the parts on the day you name and come for them afterwards, at a provincial rate known in advance. If you would sooner drive, the set is ready without charge by appointment at our address on the Zeeburgerpad in Amsterdam. This model is more compact than an outdoor tower, so it goes into a large car more often than people expect. Do measure your load space first.

Is building included when you hire the room scaffold?+

No, assembly is on your list. With this rental we look after bringing it and taking it away again. For this model that is no hardship: two people are ready inside an hour, and that hour counts within your first hire day. It helps to build it in the room where you start rather than in the corridor, where there is less space to turn the parts. We hire out no facade scaffolds, system scaffolds or cherry pickers.

What if it takes longer and you want an extra hire day?+

Tell us, and the collection day shifts along as long as the set is not yet fixed for somebody else. With curtain rails the overrun usually comes from a plug that will not grip in old plaster, or from rails that have to be shorter than ordered. Anyone who would rather not run that risk books the extra day straight away when hiring the room scaffold. Handing back sooner than agreed is always fine.

How much room must be free in the room for the build?+

Count on a clear strip of a good two metres in front of the window, wide enough to fold the stabilisers out without meeting a skirting board or a radiator. Put your sofa and dining table right out of the way rather than a little to one side, because you have to walk round the room scaffold the whole time you have it on hire. Keep the route to the next room clear as well, doorway included.

Can you keep hiring and work on indoors in bad weather?+

Yes, and that is the advantage of this job. Wind and rain do not reach you inside, so your hire days are fixed and nothing has to be postponed. Only watch the delivery day: the scaffold parts come off the van outdoors and you carry them through your hall. Lay down an old towel or a run of cardboard on that day, so that no wet streaks end up on your own floor.

Do you get the deposit back after a few days of room scaffold hire?+

You settle a deposit when reserving the room scaffold. You have it back within a working day of the set returning, once every part has been counted. With interior work watch for drill dust and for scratches from dragging: wipe the footplates and castors before you set everything ready. Loose plugs or screws left lying in a frame are worth taking out too. The check then goes smoothly and no argument follows.

Why hire a scaffold for curtain rails instead of using a stepladder?+

Because with a rail of two to three metres you need to work with both hands above your head and to move sideways along the rail at the same time. On a ladder you stand at one point and climb again for every hole. From a room scaffold you have a level platform, a guard rail and your tools within reach, and over four or five windows that saves you half a day of climbing and fiddling.

Hire a mobile scaffold for hanging a curtain rail today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.