See your price
Application

Installing gutter brackets? Choose the right scaffold.

When you fit gutter brackets for a brand new gutter there is nothing hanging yet to line up on. You begin by setting out the fall over the full length of the elevation, and only once that line is right does the first screw go in. So you have to be able to travel to and fro along the whole wall, rather than settle into one spot. For a gutter line at four to six metres you book a narrow RS51 with 6 to 8 metres of working height.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For installing gutter brackets we recommend the Narrow mobile scaffold.
  • Fitting new gutter brackets starts with setting out: stretch the whole line first, drill afterwards, and that calls for a movable build.
  • The 75 cm RS51 fits along the wall and rolls back easily to any point you still want to measure again.
  • Allow two to three hire days, because setting out, drilling and hanging the gutter are three separate passes along the same wall.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for installing gutter brackets?

Safe, stable and professional work at height

Anyone replacing existing brackets has it easy: the gutter is already up and hands you the line. With new gutter brackets that reference is missing altogether. You decide for yourself where the high point sits, how much it may drop per metre and where the outlet ends up, and that line has to be right over the whole elevation before anything is fixed. The only way is to walk the wall with a taut string, follow it at eye level and roll back without fuss to a point you want to check. Hiring a scaffold to fit gutter brackets is therefore about moving, about height and about the clear run at the base.

  • Setting out the fall across the full elevation
  • Rolling back to a point that needs measuring again
  • Working height of 6 to 8 metres under the eaves
  • Drill, brackets and gutter all go up with you
Read more about working safely →

Which mobile scaffold to hire for fitting new gutter brackets

Along a house the Altrex RS TOWER 51 is the model for this, a mobile scaffold that builds 75 cm wide. Setting out a gutter line means rolling up and down the same strip for an afternoon, and every centimetre of width you do not actually need costs you time at every single move. On top of that you have to steer past an extension, a shed or a low lean to that often sits directly under the new gutter. Compare the builds at the mobile scaffold hire fleet.

More ends up on the 245 cm deck than you might expect. A cordless drill, a box of plugs, a handful of brackets, a level or a laser, a roll of setting out line and the gutter profile itself, which usually turns up in lengths of several metres. That length lies neatly along the long side of the boards, and it is exactly why deck length weighs heavier here than width. Once that lot is up, you do not want to climb down for every bracket.

Orange braces and grey frames on a drive outside a home, the 75 cm RS TOWER 51 kit you build yourself

If you would rather rent wider, the 135 cm RS TOWER 52 is meant for the case where two of you work and the gutter goes straight in while the brackets are still being levelled. Two people with a gutter section between them have too little slack on 75 cm to pass each other. Working alone and fitting all the brackets first, the narrow build wins on every passage. Both are set out in the overview of scaffold sizes.

Working height to hire for new gutter brackets on the fall

What settles this job is not the gutter but the topmost bracket of your line, and that one sits at the high end of the fall. If it lands four to six metres above the paving, you order 6 to 8 metres of working height. Take the height of your platform, allow another 2 metres of reach beyond it, and you know where your hands will actually get to. Which sections make up that build is laid out on the page covering eight metres of working height.

Do not forget that your line does not run level. Over ten metres of elevation the fall drops noticeably towards the outlet, so at that end you are working lower than at the starting point. You absorb that difference in the build you hire: better one notch roomier than drilling at the highest bracket with your arms stretched right out above you. If the paving underfoot also slopes away from the house, that difference simply adds to it.

Erected mobile scaffold reaching to just under the eaves of a front elevation, the height the top bracket asks for

Going too tight bites you in an unpleasant way here. You drill with both hands above shoulder height, and that costs you precisely the accuracy a gutter line cannot do without. A hole a centimetre out of place pulls the whole bracket askew, and you see that back later in the way the water runs along the trough. For a gutter along the floor above the ground floor take the higher build whenever you are in any doubt.

Hiring a mobile scaffold that travels the whole gutter line

On many jobs you look for one good spot and stay put. Here it is different: the entire length of the elevation is your work area, because while setting out you run from one end to the other two or three times. So walk that whole lane before you hire a mobile scaffold, not only the stretch where you mean to begin. The ground has to be flat enough everywhere and the four stabilisers have to swing out everywhere without fouling something.

Under a gutter there is seldom an empty strip. A water butt stands beneath the outlet, a gravel trap lies against the wall, a terrace begins, or a fence stands less than a metre away. Look especially at the point where the outlet will come, because that is where the obstacles gather and where you need to work most precisely. For a garden path that sinks or slopes, the explanation of ground and level differences offers a workable answer.

Stabilisers folded out under a mobile scaffold beside a house, the clear lane needed along the whole elevation

Think about the string you stretch as well. It runs at eaves height from corner to corner and must not snag anywhere on a standard, a guard rail or a stabiliser that is swung out. Stretch it a little outside the lane you roll along, or unhook it whenever you move and put it back on the same marks. A string that has shifted by accident costs you half a day of setting out again, so take a few minutes over it.

How many hire days new gutter brackets take from start

This job breaks into three passes along the same wall, and that explains the hire period better than any bracket count. In the first pass you settle the high point, stretch the string and mark off every fixing point. In the second you drill and make the brackets fast. In the third you hang the gutter profile and check the whole run for fall. On an average elevation that adds up to two to three hire days.

There are waits in it you cannot skip. Working with chemical anchors in old brickwork, you have to let them cure before you dare hang a gutter full of water on them. Weather plays a part too: a stretched line bobs in the gusts and then you are simply fooling yourself with the measurements. Such a day is better spent laying out material than pressing on with the line. Those hours count in your hire period all the same.

Mobile scaffold standing along a side elevation, set up for a job that wants several passes over the same wall

Booking roomy is hardly dearer with this rental. The opening twenty four hours are settled at the whole amount, after which each following hire day carries 95 per cent off. So a day too many almost always turns out better than a day too few. An extra day for a windless morning costs little, while hiring too short means leaving the gutter half levelled and coming back later. How to judge such periods is set out with examples in the piece on hire days.

Which mobile scaffold suits installing gutter brackets?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Setting out gutter brackets from a platform of 245 cm

Each position puts a good two metres of elevation within reach. How many fixing points fall inside that depends on the spacing your gutter profile wants, but in practice you place a handful per position. Work those points right through before you roll on: mark, drill, plug in, bracket on, and check straight away that it sits on the string. Coming back because one hole is missing costs you a move you could easily have avoided.

Take everything belonging to those two metres up in one go. A drill with a charged battery, the correct bit, plugs, screws, the brackets for this bay and a short level to check each point. Hang a small tub from the guard rail for the little bits, because a plug that drops five metres is never found again in the grass. That keeps your deck clear and keeps you on top of the job. A second battery up there saves a trip to the charger.

Frames leaning by a front door with a cargo bike alongside, one hire position covering a good two metres of elevation

Where this job goes wrong is the order of work. Plenty of people start at the corner and screw brackets home as they shift along, after which the fall no longer comes out at the outlet. So set out the full length first and only then drill. That is precisely the difference with swapping the brackets under an existing gutter, where the hanging trough already dictates your line and you can work point by point.

Delivery of the mobile scaffold you hire for bracket work

The set turns up as loose, counted parts on the spot you point out. Steer clear of the strip directly under the new gutter line, because that is exactly the lane you will be running along several times. A drive, a piece of pavement or the side of the house works better, as long as the van can reach it. Anything settled before 15:00 on a working day heads your way the next working day, so delivery ties neatly to your first setting out day.

You name the day it arrives and the day it goes, and on this job you let the forecast weigh heavily. Still air is worth its weight in gold when a string has to be pulled taut over ten metres, so put a calm morning down as your first working day. Building is your own task, using the supplied manual and the video; reckon on half a day and do not start setting out that same afternoon. The steps in order are in the assembly instructions.

Counted scaffold parts set down on the pavement by a house, well clear of the lane the build later runs along

Once the gutter hangs and everything has been checked, you strike the build and we load it back into the van. Lay the parts together complete, so the counting goes quickly. We then take the lot in one run, stabilisers, castors and loose couplers included. Allow for bringing and fetching in your planning, which together cost a fixed amount per province including VAT; the figure for your address sits with the rates for delivery and collection.

Working safely while drilling gutter brackets on a hired tower

The deck under your feet falls into load class 3 of EN 1004 and therefore carries 200 kg on every square metre. Add that weight up calmly before you haul everything aloft in one trip. On this job it mounts: a cordless drill, a box of plugs, a stack of steel brackets and a gutter section of several metres come to more than they look, certainly with somebody standing beside you. What the class means is explained quietly in the article on this scaffold standard.

Drilling above your head carries a risk of its own. You push hard against the wall, and that force pushes you the other way. Check that the brakes really are locked before you start, keep your hips inside the guard rails, and never use the build as something to prop a gutter section against. Drill with a short machine rather than a long one, because it pushes back less. Do not move the tower with tools or a person on it, and stop when it begins to blow hard.

Built up tower against a brick elevation with an extension ladder standing apart, deck capacity two hundred kilos a square metre

Below you on this job there is always something sharp. A bracket that drops, a bit that shoots out of the chuck or a length of gutter that slides off lands precisely on the path the rest of the household walks along. Cordon that strip off while you are up there and work with a lanyard on your drill. Tell the people indoors that nothing may be put down under the gutter line either. More rules are in the safety guidance.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for installing gutter brackets

1

Settle the high point of your gutter line before the tower is even standing. From the ground, a long batten and a level show you far better whether the eaves themselves already run out of true.

2

Mark every fixing point on the brickwork with a thick marker and not only on the string. If the string works loose you then avoid setting out the whole elevation a second time.

3

Drill all the holes for one position first and only then put the brackets in. That way you handle the drill just once before you roll the build on to the next stretch.

4

Do not lay the gutter profile loose on the deck but tie it to the guard rail. A three metre length sticks out and taps against a roof tile the moment you start moving.

5

Check the line from ground level by sighting along the stretched string before you drill. Small kinks show up far better from five metres away than they do from close up.

6

Put your last hire day well after the gutter goes in. You want to test with a bucket of water that everything really runs to the outlet before you start striking the build.

Frequently asked questions

Frequently asked questions about installing gutter brackets

Which mobile scaffold do you hire to fit new gutter brackets?+

For a gutter line along a house the RS51 is the model to hire, a mobile scaffold only 75 cm wide. This job has you moving often, because you go the length of the elevation several times over, and a narrow build you can shift on your own is much pleasanter then. If two of you are working and the gutter goes straight in, the 135 cm RS52 gives you room to pass each other on the deck without the profile in the way.

How does hiring a tower for a new gutter line work in practice?+

Online you pick the model and the working height that suit the job, mark a day for delivery and a day for collection, and pay a fixed rate in advance with VAT in it. We unload the parts, you build and set out your gutter line. After the final check you take it apart, lay everything together and we come and fetch it. In those days the scaffold is your measuring platform, not only somewhere to drill from.

How many hire days do new gutter brackets need on a normal elevation?+

Reckon on two to three hire days for an ordinary wall. Setting out is day one, drilling and fitting day two, and hanging the gutter plus testing takes the remainder. A long rear elevation or a double corner adds a day. If you are working with chemical anchors, curing time comes into it as well. Booking roomy is rarely an expensive choice with this rental and spares you a rush at the end.

What does renting a scaffold for gutter bracket work come to?+

What you are charged follows from the model and the build height, with bringing and fetching to your province on top. Every rental price is shown with VAT included at the current rates, so you can work out beforehand exactly what the scaffold side of the job will cost. Since day one carries the weight and the days that follow add almost nothing, one generous booking almost always beats two separate periods.

Which working height should you hire if the new gutter sits at five metres?+

You hire a build of 6 to 8 metres working height, which puts the platform between 4 and 6 metres. Measure to the highest point of your future gutter line, so to the side where the fall begins, and not to the outlet. If the paving under the wall slopes away as well, count that difference in as you order. The overview of working heights shows which build belongs to which reach per tower.

Can the tower be delivered, or would you rather collect it when hiring?+

You may do either. With delivery we bring the mobile scaffold as loose parts on your date and come back for everything afterwards, at an amount fixed per province. Driving yourself is fine too: by appointment you load the set at our address on the Zeeburgerpad in Amsterdam at no charge. For a gutter at five metres the part count is considerable, so check first whether your trailer takes that volume.

Do we put up the hired mobile scaffold, or is that your job?+

Building does not come with the hire; you arrange that yourself, just as you do the setting out and the drilling. With two people it takes half a day, and you count that half day separately, because setting out and building on the same afternoon turns into a rush for everybody. System scaffolds, facade scaffolds and cherry pickers are not part of what we hire out, but for a gutter line at this height a rolling tower suits better than a fixed structure anyway.

What if the fitting overruns and you need to hire the tower longer?+

Let us know as soon as it starts to feel tight, and collection of the tower moves back with you, provided the set is still free for those extra dates. Fitting gutter brackets does overrun regularly, because an elevation turns out to be off true or the brickwork proves softer than expected. Anyone wanting to avoid that books an extra hire day at the outset. Handing back early is always fine and costs you no trouble.

How much clear room does the build need over the whole elevation?+

Not just at the starting spot, but along the entire length you roll. Work from the width of your mobile scaffold, add what the four stabilisers stick out, and keep a path free besides so you can walk past with a gutter section. Shrubs, a water butt or a bike rack you move before the delivery arrives. Steering between obstacles halfway through is exactly where mistakes creep into a set out line.

Can you keep the hire on when it is too windy to set out?+

The tower may stay standing; only the setting out gets postponed. A string swaying about at ten metres gives you no line you can trust, and you only find that out when the water later runs the wrong way. Use a day like that to lay brackets ready, mark the wall or sort plugs. Because you decide when we come to collect, that delay costs you one extra hire day at most.

When does the deposit return after hiring for bracket work?+

The deposit comes back to you within one working day of return, as soon as all the parts of the tower have been counted and found complete by our people. On fitting work watch out for drill dust and cement crumbs above all: a deck you have been hammer drilling over is covered in grit sooner than you think. A quick sweep out before you set it ready saves any discussion.

Why do new gutter brackets take more hire days than replacements?+

Because with new brackets you have no existing line to go on. When replacing, the trough is still hanging and you prop it temporarily while working point by point, and the build stays roughly where it stands. On a new gutter the complete fall has to be set out before a single screw goes in, so you run the mobile scaffold over the whole elevation several times. Those extra passes are exactly the extra hire days.

Hire a mobile scaffold for installing gutter brackets today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.