See your price
Application

Painting a bike shed? Choose the right scaffold.

A bike shed is low and open, but it hardly ever stands somewhere you can simply put a tower down. Usually it sits in a communal courtyard or beside a block of flats, so you need permission, the way through has to stay clear, and the bikes have to come out before you start. For this job you take a MiTower of 75 cm, meant for one user, built up to somewhere between 4 and 6 metres of working height. Below: measuring, where the scaffold ends up and how many hire days it costs.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a bike shed we recommend the 1-person scaffold.
  • For painting a bike shed you take a MiTower, 75 cm wide and light enough to carry in through a gate.
  • Arrange permission with the association or the manager first, because the courtyard and the passage belong to all the residents.
  • Every bike goes out and stays out: only when the last coat is hard may the racks fill up again.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for painting a bike shed?

Safe, stable and professional work at height

Painting a bike shed is child's play as far as height goes, but the circumstances make it awkward. It is an open structure of posts, rails and mesh, so you paint four sides of every member instead of one flat wall. You are also standing on ground that belongs to everybody: residents have to reach their bikes, the postal van has to get by and the association wants to know what is happening. Hiring a scaffold for a bike shed therefore turns on a tower you can get through a gate, that you move on your own, and that you can roll aside at the end of the day so the courtyard belongs to the neighbours again.

  • An open structure, four sides to every rail
  • Permission from the association or the site manager
  • The way through for residents stays clear
  • Working height 4 to 6 metres at a low shed
Read more about working safely →

Which scaffold to hire for a bike shed in a courtyard

What decides matters here is not the height but the route to it. You reach a communal courtyard through a small gate, an undercroft or a passage that is sometimes not even a metre wide, and everything you hire has to pass through it. The MiTower of 75 cm is built for that: narrow, light and with parts one person can carry alone. Measure that passage before you commit to anything, because a scaffold you cannot get in is worthless in a courtyard. Look at hiring a MiTower for the build you need.

On the site itself that width helps you again. Between the shed and the cycle racks, the bins or the back wall of the block there is seldom more than a metre to spare. A tower of 75 cm rolls through there without clearing half the courtyard first. The platform of 245 cm meanwhile covers a good stretch of wall, so per pitch you take in several posts and the piece of roof edge above them in one.

Light 75 cm scaffold tower built up beside a modern building, the size that passes a gate into a courtyard

A broad mobile scaffold brings you little on this job. You do not take tubs of material up but a pot of paint and a brush, and that extra width will be against you at every passage and every rack. If the shed stands against the wall of a maisonette block, do check whether you have to get above the roof edge. What such a complex brings with it is described in the piece on scaffolds at a block of flats.

Working height to hire for a low bike shed roof

A bike shed rarely rises above two and a half metres, but that is not your measuring point. You have to reach the top of the roof edge, the fascia board round it and the underside of the roof boarding between the joists. If the shed leans against a blind wall or a block of stores that carries on higher, take the topmost edge that goes in the colour. Come out at three metres and a reach of 4 to 6 metres fits easily round that.

Order with the rule of thumb that your working height equals the height of your platform with about two metres of reach on top. For a shed that means a platform between one and a half and two and a half metres, so a low build with few frames. Do not mix that up with what the model can do: the MiTower reaches 6.2 metres of working height, and here you use only the bottom part of it. That setting shows in the build for 4 metres of working height.

Scaffold tower built up along a low side wall, the reach that suits a bike shed with a flat roof

Measure from the paving that the castors will end up on. Courtyards are often not level: there is a fall towards a gully, or the ground rises towards the stores. A difference of twenty centimetres already decides whether you work with three frames or with four. Starting too low is the classic miss here, because then your head comes up against the roof boarding and you can no longer see whether the underside of the joists has covered.

Hiring a tower and placing it on a shared courtyard

Arrange permission well before you book anything. A communal courtyard usually belongs to an owners' association or a housing association, and they want to know when a tower will be there, how long it stays and who is responsible for it. Ask straight away for the key or the code of the gate, because your delivery goes through there. Then hang a note at the entrance with the dates, so residents know their bike has to go. A hire period nobody has announced will founder on a rack that stays full.

The bikes themselves are your biggest obstacle. A half cleared shed does not work: you have to get along the whole wall with the tower and you want no saddles under your platform. Empty the racks completely, agree a temporary spot and keep it free until the last coat is dry. If a rack is bolted into the paving, that decides where your pitches go; walk that order through once on foot and note per spot how much room is left for the scaffold and its stabilisers.

Stabilisers at the foot of a scaffold tower on paving, the clear space a communal courtyard has to offer

Finally look at the surface and the way through. Slabs in a courtyard lie loose, subside at a gully and fall away towards a drain; slide a board under a wheel where you need to. Keep a strip clear where people can pass with a bike in hand, certainly if the site has only one exit. Put the bins somewhere else for those days, because they stand exactly where you want your frames. Getting a pitch firm on such slabs is covered in scaffolds on uneven ground.

Bike shed scaffold hire: counting up the days

An open structure costs more time than the look of it suggests. Every post has four sides, every rail has an underside, and between the mesh or the slats you get in only with a small brush. Reckon on about a day per coat for a shed of eight metres, and that includes resetting the tower every two and a half metres. Roughly speaking you are two to three times longer at it than at a closed wall of the same length.

With cleaning, sanding, a primer and a finish coat you arrive at three to four hire days. Drying time sits in there that you cannot compress, and at a bike shed it counts double: the racks stay empty until everything is hard, and residents who are missing their bike grow impatient. So plan a day extra rather than a day less, also because you cannot carry on in the dark on a shared site. An indication per kind of job is in the overview of hire days.

Cargo bike and scaffold frames on a townhouse pavement, the hire kit that stays with you through several days on site

Planning generously works out well for your rental price. The full amount runs over the first twenty four hours, after which every following hire day counts with 95 per cent off, so the cost hardly climbs. A booking of four days therefore differs little from one of two, while you do get the calm to skip a wet morning and simply leave the scaffold standing. Set your collection day behind the day the bikes may come back, not in front of it.

Which mobile scaffold suits painting a bike shed?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting a bike shed: many small surfaces per pitch

Work the shed off in sections of one platform length and hold that order. Per pitch do first the underside of the roof boarding, then the rails, then the posts and last the bottom thirty centimetres where the splash back hits. That way whatever you spill lands on timber still to come. From the platform you look straight at the top of the rails, and that is exactly where the dirt sits that stays invisible from the ground.

Take small tools up with you. A one litre tin, a brush, a sanding block and a cloth are enough; with a full tray you spend your time balancing between rails. At an open shed you also paint from two sides: you do the outer face of a wall, move the tower inside and take the back of those same posts there. Count that double round in your planning, because it doubles the number of times you shift the scaffold and level it again.

Scaffold with a working platform against a wall, the pitch you reset along a bike shed every two and a half metres

Moving over paving is easy as long as the site is empty. Roll the tower to the next bay with the brakes off, check that all four castors keep contact and lock them again. Where most people are wide of the mark is the number of moves: eight metres of shed, approached from two sides, already comes to eight pitches per coat. With four coats a good part of your hire days goes into that, and it explains why such a small structure takes a whole week.

Hire and delivery when the parts go through a gate

A delivery van rarely gets right into a courtyard. Count on the set being dropped in the street or at the gate and on you carrying the parts the last stretch. So measure the narrowest passage beforehand and agree where the stack may lie; a porch or a corridor residents have to use is not a good place. On the site itself you lay the frames beside the shed and not in the cycle racks, because that is where you want to get past with the scaffold.

You settle yourself when the set comes and when it goes, and that helps here because the gate has to be open. Plan the delivery for a moment when the caretaker or a resident can let you in, preferably outside the morning rush in which half the block comes for its bike. Orders that arrive on a working day before 15:00 leave the next working day, so you can still shift at short notice if the weather turns.

Loose scaffold parts set down in a street by a building, the set you carry by hand into a courtyard

You put the tower together yourself; we do not come and build. A manual is in the set and there is a film showing the order of work, and at this height the building costs you only a short half hour. We come back for it afterwards, so you break it down and stack everything complete on the agreed spot. Collecting at Zeeburgerpad in Amsterdam is possible too, free and by appointment; otherwise the cost of delivery per province shows what the driving comes to.

Safe work on the tower between bikes and residents

The platform under your feet meets EN 1004, and its load class 3 stands for two hundred kilos per square metre. On this job you come nowhere near that, but do keep in mind that this is a tower for one person: let nobody climb up with you to touch in an awkward rail. Two people on a one person tower changes how it stands on loose slabs. The background to that class is in the explanation of the scaffold standard.

The fixed rules apply just as much at one and a half metres. Brakes on before you climb, nothing and nobody on the tower while it is being rolled, and off it the moment the wind gets up in earnest. That last one is less theoretical in a courtyard between two blocks than it sounds: the wind is funnelled between the elevations and pulls at an open structure. Check at every new spot that the four stabilisers are tight, and take loose sheeting or plastic off before you go up.

Mobile scaffold pitched on paving beside a brick wall, a loose ladder alongside, a one person build on its stabilisers

The real risk here is the people around you. Residents walk underneath with a bike in hand, children come to watch and somebody parks a cargo bike against a leg. So fence your working bay off with tape or cones and do not work above the walking route to the exit. Put tools behind the guard rail and not on the edge, because a pot of brushes that falls always lands awkwardly on a yard full of bikes. The rest is in the safety rules for work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a bike shed

1

Hang a note at the gate two weeks in advance with the dates on which the shed has to be empty. Residents who only hear on the morning itself will simply put the bike back.

2

Photograph the full shed before you start. On a shared site that heads off arguments over a scratch or a missing lock, and you know at once which rack belonged where.

3

Do the underside of the roof boarding first and keep half a metre between your head and the rails. Build one frame too high and you paint bent double and miss half the joints.

4

Take a two centimetre brush up for the corners between mesh and post. With an ordinary brush you push paint straight through the mesh and it ends up against the bikes on the other side.

5

Pick your hire days midweek if the site is empty during the day. At the weekend everybody walks around you to get to a bike, and then you spend more time waiting than working.

6

Only let the racks be filled again once you can press a thumb on the paint without leaving a mark. Handlebars against a half hard coat give a dent you can only sand out.

Frequently asked questions

Frequently asked questions about painting a bike shed

Which scaffold should you hire for painting a bike shed?+

Take the MiTower of 75 cm, the light tower for one user. The measure that counts is not the shed but the gate or the corridor the parts have to pass, and in a courtyard that is often tight. A light set you also carry in on your own. On the site itself you roll easily between the racks with it. You could hire a mobile scaffold of the wide sort, but it brings you nothing when you only take a pot and a brush up.

How do you arrange scaffold hire at a block of flats?+

Permission first, the booking after. Ask the association or the manager whether the tower may stand there, how long that may be and how the gate opens. Then you choose the model and the reach online, pin the arrival date and the removal date and settle a fixed amount including VAT. We set the scaffold down in parts, you carry it all in, build up and paint. At the end you break down and we take everything away again.

For an eight metre shed, how many hire days do you need?+

Three to four hire days is realistic. Per coat you are about a day at it, because an open structure has far more edges than square metres, and you move the scaffold every two and a half metres. On top of that comes the drying time between the coats, which you cannot catch up because the bikes may only return when everything is hard. So choose your collection day one later than you think you need.

What do you pay to hire, and how does the discount work after that?+

The rental price hangs on two dials: which model you pick and how high you build it, with a fixed rate beside it for the driving within your province. The amounts stand with VAT beside them on the page with prices. On this job the difference between day one and the days after it is what matters, because that difference is large. Fixing one longer period is therefore cheaper than two short hires.

Which working height do you hire for a shed with a flat roof?+

Measure to the topmost edge that still gets the colour, usually the fascia board round the flat roof. If that sits at about three metres, 4 to 6 metres of working height is the right choice and you have slack for a shed standing against a taller wall. Measure from the slabs where you will park the scaffold, because a courtyard often falls towards a gully. Which frames belong to that reach is on the working height page.

Does the rental deliver into the courtyard or does the van stop in the street?+

In practice the van stops at the gate or in the street, because most courtyards cannot be reached by vehicle. The last stretch you carry the parts yourself, and that is precisely why a light scaffold is so practical here. Agree beforehand where the set may be put down, so it does not end up in a porch or a passage. Prefer not to wait for a van? Then you collect the set by appointment from the rental.

Is building included in the hire, or do you put the tower up?+

Building is always the hirer's work with us. In the hire you get the complete set, a manual and an instruction film, and at the low setting a bike shed asks for that costs you half an hour. Reckon that half hour into your first day, together with carrying the parts through the gate. Our range stops at mobile towers: no facade scaffolding, no system scaffolding, no cherry pickers, so a job of this size lands on the light scaffold.

Can I hire for longer if the shed turns out to be more work?+

Usually that can be arranged. Say so in good time and the collection date moves, as long as the scaffold is not already on the schedule for the next customer. At a bike shed it happens often enough that more rot sits under the slats or that the mesh has to be replaced first. If you do not want that risk, add a day when you hire. Bringing it back earlier is allowed as well.

How much clear ground does the courtyard need for a hire?+

Start from the width of the scaffold and reckon half a metre on either side for the stabilisers sticking out. In practice you want a clear strip of two metres along the shed, plus a place for the stack of parts. The cycle racks therefore have to be empty and where possible pushed aside. Think of a walking route for residents too, because closing a site off entirely is rarely allowed and brings complaints.

Is it worth hiring on if it rains several days running?+

Yes, because leaving the tower standing costs you almost nothing and having it come out again does. Paint on wet timber holds badly and on an open structure nothing dries away while it stays clammy. Use such a day to sand, replace slats or loosen the mesh, and pick the coats up as soon as it clears. Since you set the collection date, you shift a few days without much cost and the scaffold stays where it stood.

How does the deposit go when the rental fetches the set again?+

A deposit stands against the set while you hire, and it is back within one working day once everything has been counted and found complete. On this job watch that small parts do not go astray between the cycle racks: castors, stabilisers and clamps vanish quicker on a busy site than a frame. Paint on a platform counts too, so lay a cloth over it. What else is worth knowing is at the deposit afterwards.

Do all the bikes have to be out before the hired tower arrives?+

Yes, and preferably a day earlier. You have to be able to get along the whole wall with the scaffold and you want nothing under your platform that can fall over or catch the paint. On top of that you paint an open shed from two sides, so the inside has to be free as well. Agree a temporary parking place and hold to it until the last coat is hard.

Hire a mobile scaffold for painting a bike shed today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.