See your price
Application

Painting doors? Choose the right scaffold.

Painting doors is low work, but it is not work you can leave open for a week. The door has to shut and lock every evening and the house has to stay liveable, so you plan door by door and work in short stages. For the leaf, the fanlight and the lintel above it you hire the MiTower, 75 cm wide and built for one user, with a working height that lands between 4 and 6 metres. Below: measuring that height, where the tower stands, and how many hire days a door costs.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting doors we recommend the 1-person scaffold.
  • Painting doors calls for a MiTower, 75 cm across and made for a single user, reaching somewhere between 4 and 6 metres.
  • The tower stands beside a door that still has to open, so you place it next to the frame, never in front of it.
  • Allow three to four hire days: you take one door at a time so the house can still be locked up at night.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for painting doors?

Safe, stable and professional work at height

With painting doors the difficulty is not the height but the use. A facade can be left to dry for a week; a front door cannot, because it has to close and lock every evening without the gloss gumming to the rebate. So you work door by door in short stages, and you want a pitch you can shift aside in ten minutes and roll straight back. A ladder will not do that: the fanlight and the head rail need two hands, and you are standing in the very opening everybody has to walk through. Hiring a scaffold for doors therefore comes down to narrow enough to sit beside the frame and light enough to move on your own.

  • The door must shut and lock each evening
  • Fanlight and lintel need two free hands
  • Working height between 4 and 6 metres at a door
  • A narrow pitch beside the frame, not in front
Read more about working safely →

Which scaffold to hire for painting doors with a fanlight

A door sits in an opening that stays in use, and that steers your choice more than the height does. What you hire here is a MiTower: a light one person tower measuring 75 cm across. That width slips in beside a frame, onto a narrow pavement and between the wall and a car on the drive, where a broad pitch would block the whole opening. Which builds are possible and what the set contains you will find on the page where you can hire a MiTower.

On the 245 cm platform you have a door frame in front of you across its full width, reveals and lintel included. That means you never have to shift halfway along a head rail, and it is exactly that join you would still be looking at in high gloss a year later. Extra platform width buys you nothing on this job, because the surfaces are slim and you carry little: a tin, a brush and a small roller. What does count is lifting the frames single handed.

Narrow 75 cm scaffold tower built up beside a house wall, the size you hire when painting doors

For internal doors on a landing the choice falls differently. There the RS44 room scaffold fits, which passes an interior door from about 70 cm and reaches some four metres; you will find it among the room scaffolds for indoor work. If the doors go along with a full facade round, you are better off renting a narrow mobile scaffold with more reach straight away. Stay with the doors and their fanlights and the light tower is the thriftiest choice.

Working height to hire for a door with a fanlight

The highest thing you have to reach at a door is rarely the leaf itself. That stops around 2.10 metres, but above it sit the fanlight, the head rail and often a band of render or a canopy that has to go in the same colour. Measure to the top of that last surface. If it brings you out at 3 to 4 metres, a reach of 4 to 6 metres is the right order and leaves margin for a porch that turns out taller than you thought.

The working height you book is your platform height plus roughly 2 metres of reach, since that is how far you get standing with your arms out. At a door that means a platform a little over two metres, which is a low setting. Do not confuse that setting with the model: the MiTower runs on to 6.2 metres, you simply do not build it out for this job. What that saves in frames shows up in the builds for 6 metres of working height.

Scaffold built against a front elevation with windows and frames, the low reach a door with a fanlight asks for

Measure from the surface the castors will rest on, so not from the threshold. If there is a step or two up to the door, the tower stands on the path below and you need those steps as well. Choose too tight and you finish the fanlight with your arms above your head, the gloss runs in streaks and the first low sun shows precisely where you stood. Booking one setting higher costs you no extra build time and spares you that.

Where the hired tower stands at a door on the pavement

The spot here is cramped and busy at the same time. You put the tower next to the frame and not in front of it, so the leaf keeps its swing and residents can get past. If the door opens outwards, chalk the arc of the leaf onto the slabs first and keep it clear; a stabiliser just inside that arc earns you a scratch in fresh gloss. The four stabilisers splay outwards, so allow half a metre extra on each side.

Then look at the paving itself. A pavement falls towards the gutter, old setts are seldom flat, and the gully for the downpipe is usually exactly where you want a castor. Slide a stout board under any wheel that rocks, check with a spirit level that the bottom frames sit square, and repeat that check after every move. For as long as you are renting, that stays the most important daily check. How to take up a sloping surface neatly is set out in the piece on uneven ground.

Stabilisers folded out at the foot of a scaffold tower, the footprint you keep outside the swing of a door

If the door faces the street you are working in public space. Keep a walking route of at least a metre free, move bikes and bins aside the day before, and warn the postman with a note on the window. In a shared porch, ask the neighbours whether they can use another entrance for those days, and tell the council if the tower ends up on the public pavement. That is better arranged in advance than with a half wet head rail over your head.

How many hire days does a set of doors take

A door is a small area with a lot of operations. Cleaning, sanding old gloss, going round the sealant lines, filling where the timber is dented, priming and then two thin coats: that is six passes over the same surface, with waiting time between each one. The fanlight and the reveals come on top, and the threshold usually gets an extra coat because it takes the most treading. In working hours a door is quickly done, in days it is not, and that is why you plan in stages.

Doing a front door, a back door and a garden door, count on three to four hire days and on at least as many pitches. You lay the coats so that every door can shut again by late afternoon without tacking, so you start early and you stop in good time. Cold or damp weather stretches that, because exterior gloss wants to flow out above ten degrees or so. How others judge such a run of days is set out in the piece on hire days.

Frames waiting on the pavement by a black front door, the hire set you keep on site for two or three days

The way the rate is built rewards booking generously. The full amount applies only to the first twenty four hours, and every hire day after that comes with 95 per cent off. A day in hand behind your planning therefore costs almost nothing, while too short a period forces you to rush the last coat, and haste always shows in gloss work. So set your collection date a day later than the day you expect to finish.

Which mobile scaffold suits painting doors?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting doors from the platform in short stages

Work from the top down and in the order that gets least in your way. First the lintel and the fanlight with its glazing beads, then the frame with the reveals, then the leaf and last the threshold. That way nothing more can drop onto a surface that is already finished. Everything above shoulder height you do standing on the platform with both hands free, and the leaf itself you simply take on from ground level.

Per stage you take up what that round needs and nothing else: a tin, a brush, some abrasive paper, a cloth and tape in your pocket. Anyone who is missing something halfway has to climb down, and the tower is standing in the very opening you want to pass through. Keep the door shut while you are up there, because a leaf swinging open against an upright rubs its own fresh gloss off. If the rebate is still wet, wedge it ajar on a block.

Scaffold with a 245 cm working platform along a house wall, the pitch you roll from door frame to door frame

You only move when a door is genuinely finished. Roll the tower over the slabs with the brakes off to the next frame, lift it over a threshold rather than riding across one, and lock the castors again straight away. If you have to go through a gate to the back, take a couple of frames off; that costs a quarter of an hour. Do not underestimate the number of small surfaces: a six panel door has more edges than a window of the same size.

Scaffold hire and delivery when the front door is the entrance

The set arrives as loose, counted parts. Agree indoors where that stack is going to end up, because the square metres in front of the door are precisely the ones everybody has to walk over. A strip of front garden, the grass beside the path or the hall inside all work better than the pavement right at the frame. Do not lean the tubes against the wall you still have to sand either, and not on the slabs where the stabilisers will stand.

You pick the delivery day and the collection day yourself. Beat 15:00 on a working day with your order and the parts leave the following working day, and for gloss work outside you check the forecast first: you want a dry run of days with no night frost in it. Have the parts come at the end of the afternoon before, then you build at your ease and start the next morning with sanding instead of carrying.

Scaffold parts laid ready by a front door, the set you put down beside the opening for painting doors

Putting it up is your own job; we do not come and build. The manual is in the set and the assembly video is online; at this low setting you are half an hour on your own. At the end we fetch the tower back, so after the last coat you take it down and stack the parts on the spot you gave us. Picking the set up yourself at Zeeburgerpad in Amsterdam is fine as well, free and by appointment, and otherwise the delivery charges per province show what driving costs.

Working safely on a hired tower at a door that opens

The platform carries 200 kg per square metre, the figure that belongs to load class 3 within EN 1004. On gloss work at a door you come nowhere near it, but watch something else: this tower is built for one person. So do not stand on it in pairs to do a fanlight together, not even briefly. Nor is a crate on the deck a way to gain the last few centimetres above the head rail. What sits behind that class is explained in the piece on loading and weight.

The fixed rules do not change because you are standing low. Brakes locked before you step up, nobody and nothing on the platform while the tower is rolling, and off it as soon as it really starts to blow, even though your head only just clears the fanlight. After every move go round all four stabilisers and fold them out again. A low pitch feels innocent, and that is exactly why people skip that check. Say it out loud and you will not skip it.

Assembled scaffold in a side passage next to a free standing extension ladder, a build meant for one person at a time

On this job the danger sits behind the door. Someone pushing against the leaf from inside while you are up top gives the tower a shove you never see coming. Turn the key, hang a sign on the handle and tell the rest of the house which way out is closed that day. Keep the space beneath you clear as well, because a tin that falls lands squarely on the mat. The rest you can read at working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting doors

1

Take the door furniture off before you build and put it in a numbered bag for each door. Masking round a handle costs more time than removing it, and the gloss runs neatly into the corner.

2

Hang a sign at eye level on the outside of the door you are working on. Otherwise couriers push against a wet leaf, and a handprint in fresh gloss never comes out again.

3

Paint the hinge side and the rebate first thing in the morning. Those need the longest to dry, because that is where the door presses as soon as you pull it shut and lock it in the evening.

4

Have two wooden blocks ready to hold the door slightly open. The rebate then carries on drying while the house is still closed up, and you do not have to shift the scaffold to reach it.

5

Do the fanlight and the lintel on the day the tower is at its highest setting. If it drops a frame afterwards, you will not build up again for one edge you forgot.

6

Feel the gloss before you confirm the collection day. Paint that still clings leaves a mark on the tubes you are dismantling, and that only gives you an argument when the parts are counted.

Frequently asked questions

Frequently asked questions about painting doors

Which scaffold should I hire to paint doors with a fanlight?+

For doors with a fanlight you hire the MiTower, the narrow one person tower whose reach comes comfortably above a door frame. You set it beside the frame and keep the opening usable, which a wider pitch will not allow. If you are working indoors on a landing, the room scaffold suits better, because it passes through an interior door. Taking the doors along in a whole facade round instead, it is better to hire a mobile scaffold in the narrow build.

How does hiring a scaffold for door work actually go?+

Online you set the model and the reach you want, pin the day the tower may arrive and the day it disappears again, and settle a fixed price with VAT already in it. We drive the scaffold parts to you, you build up and gloss your doors in the stages you have thought out. At the end you take it down, stack the set ready and we take it away. What you arrange yourself is the order of the doors.

For three exterior doors, how many days do I hire the scaffold?+

Three to four hire days is realistic here. Per door you sand, prime and gloss twice, and the waiting time between those coats cannot be made up because the leaf has to shut every evening. If one door has a lot of panels or the timber needs repair, add a day. Since you choose the collection day yourself, you build that room in at once and have nothing left to arrange with the rental halfway through.

What do I pay to hire a scaffold for door work?+

Your rental price hangs on two things: which model you take and which reach goes with it. On top of that sits a fixed amount for bringing and fetching within your province. The figures themselves, VAT included, sit on the page of rates, so the total is known before you book. For door work the ratio between the days is what matters: day one weighs heavily, the days after it barely add up.

What working height do I hire for a front door in a tall porch?+

Measure to the top of the highest surface that goes in the colour, usually the lintel or the underside of a canopy. If that sits at 3 to 4 metres, take a scaffold with a reach of 4 to 6 metres and you keep margin. Measure from the slabs where the castors will stand, not from the threshold if there are steps in front of it. The working height page shows which build belongs to which reach.

Do I have the scaffold delivered or collect it from the rental?+

Either is open to you. Have it brought and the scaffold stands in parts outside the house on your day, and we come to take it away after the last coat of gloss, for a rate that is fixed per province. Prefer to drive yourself and you can pick the parts up by appointment, provided your car or van can take the length of the frames. For door work most people still choose delivery, because the space out front is occupied anyway.

Is assembly included when I hire a scaffold for doors?+

No, the building is part of what you take on as hirer. You get the complete set with a manual, and online there is a video showing step by step how it goes together. At the low setting a door asks for, you are half an hour on your own. Count that half hour into day one and you are sanding quickly. A cherry picker, a facade scaffold or a system scaffold is not something we hire out, so a door of this height ends at the light tower.

What if a door runs over and I want extra hire days?+

Give us a call the moment you can tell it will not fit; the collection day moves with you provided the tower has not been booked by the next customer. With gloss work things regularly turn out differently, usually because the timber needed more repair than expected or it got too cold to lay another coat. If you would rather not run that risk, book a day of slack when you hire. Bringing it back early is fine too.

How much clear space does hiring a scaffold at a street door need?+

Take the width of the scaffold, add half a metre on each side for the stabilisers, and then add the arc the leaf describes as it opens. In practice you want a reasonably flat strip of about three metres along the wall. Bikes, planters and a wheelie bin go somewhere else the day before delivery. Remember too that the stack of parts has to lie somewhere for all of those hire days.

Can I simply hire on if the weather turns while glossing?+

Yes, the scaffold may stay standing; you only postpone the gloss. Exterior paint wants to flow out dry and not too cold, and a shower on a fresh coat leaves dull patches you can only sand out. Use a day like that for sanding, filling or doing the inside of the frame. Because you decide how long the tower stays, a shift costs you a day of hire at most, and the tower keeps its place at the door.

And the deposit, when does it come back after a door hire?+

A deposit goes down at the start of the hire and returns once the tower has been counted complete, within one working day of collection. On this job watch two things: every frame, platform and stabiliser goes back the way it came, and no dried gloss stays on the tubes. Throw an old sheet over the platform while you work and you have nothing to scrub on collection day. More at the deposit during a hire period.

Can I do the window frames around the doors in the same hire period?+

A sensible idea, since you are standing there anyway and the colours usually match up. Bear in mind that a window frame is wider than a door, so you move the scaffold more often and a day goes on. Check as well whether the reach you hire still works for the frames on the first floor, because those sit higher than a fanlight. How that job runs is on the page about painting window frames.

Hire a mobile scaffold for painting doors today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.