See your price
Application

Installing a roof window? Choose the right scaffold.

Installing a roof window where no opening exists yet is more than dropping a frame in. Tiles have to come off, battens get cut through and on the inside a whole finish follows afterwards. All that material travels up past the tower, so here you take the wide RS52 at 135 cm and build it up into the 8 to 12 metre band. This page explains how to measure that height, how many hire days you need and what has to stay clear at ground level.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For installing a roof window we recommend the Wide mobile scaffold.
  • For a new roof window you hire a wide mobile scaffold of 135 cm, with the top deck between 6 and 10 metres up.
  • The tower is your supply point here: the frame, the glazing, the timber for the trimming and the lead all travel up it.
  • Reckon on three to four hire days, because once the frame is set the finish around the new opening still follows inside.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for installing a roof window?

Safe, stable and professional work at height

Installing a roof window starts with a hole that does not exist yet. You take tiles off an area considerably larger than the window itself, you cut through battens and you make an opening to size between two rafters. Everything needed for that has to go up: the frame, the glazing, timber, screws, tools and the flashing. At the same time part of your day is spent inside in the loft, where the reveals get boarded. You walk from outside to inside and back again all day long. Hiring a scaffold to install a roof window therefore comes down to three things: a wide deck, enough days, and a standing place directly under the new opening.

  • Cutting a new opening between two existing rafters
  • Frame and glazing lifted up over the platform
  • Wide deck for timber, lead and tools
  • Finishing inside between the days outside
Read more about working safely →

Hiring a mobile scaffold to fit a new roof window

To install a roof window you hire a mobile scaffold in its wide form, the Altrex RS TOWER 52 with a deck width of 135 cm. That deck holds more than you alone: the frame you set down for a moment, the circular saw, a box of screws and the insulation going inside. On a narrow platform all of that lies in your walking route, and you notice it the moment you turn with a board. Which builds are free is shown among the towers standing ready for hire.

The deck is 245 cm long, and for a roof window that works out well. A standard window is narrower than that length, so you reach the whole opening from one position without moving while you set it. If the tower stays put, your line of sight on the opening stays the same and you keep an overview of how the lead meets the tiles on both sides. That saves measuring errors you would otherwise spot only once the window is already in.

Wide mobile scaffold built along a front elevation, the working deck you hire to set a roof window from outside

You take the slim 75 cm version only when the route to the back of the house allows nothing wider. You give up working room with it, exactly at the moment you and a second person are tilting a frame over an open slope. If the loft side has to be boarded from inside and no ordinary build fits up the stairs, that is a separate matter; the room scaffold for indoor work is meant for it, with a build that passes an interior door.

Setting the working height you hire for a roof window

For a roof window you measure neither to the ridge nor to the gutter, but to the sill of the future opening. That is the point you have to reach standing up. If the window sits low in the slope you stay close to the roof edge; if it comes higher, your build goes up with it. On a terraced house of two storeys with a pitched roof you usually land somewhere in the 8 to 12 metre band. Ask your supplier for the clear size of the window beforehand.

Then translate that height into the build you order. On top of the platform height counts about 2 metres of reach, the distance over which you can still work comfortably from the deck without stretching. For a window whose sill sits at nine metres, your top deck ends up at around seven. How many sections go with nine metres of working height is set out in the overview for that height, so you know in advance what is in the van.

Mobile scaffold against a house with the top deck close to the roof slope, the height needed for a new roof window

Choose slightly too high rather than too low. With your deck below the sill you work with your arms above your head while lining up a frame, and it nearly always ends up sitting skew in the slope. Half a metre too high and you simply step down a deck panel. Check the height you set out from the loft as well, because inside and outside measurements diverge more than you expect on a pitched roof.

Standing place for the mobile scaffold at a new roof window

The tower goes directly under the spot where the roof window will come, not somewhere alongside it. From the platform you want to look square on to the opening, otherwise you cannot see whether the frame lies true in the slope while you set it. So look from inside first to see where the window falls between the rafters, measure the distance to the wall and mark the build out on exactly that line outdoors. Standing half a metre off costs you the most time while levelling.

Under the wheels belongs flat, load bearing ground. Paving, block setts or a drive will do; fresh soil, newly laid turf and soft garden ground will not. The four stabilisers need room all round, and with a roof window you are often in a back garden where a shed, a pergola or a mature hedge makes that awkward. Prune or move whatever is in the way before the parts arrive. For a garden that runs downhill, there is advice on working on a sloping surface.

Stabilisers of a mobile scaffold set out on paving, the spot directly below the future opening in the roof

Keep space free below for what comes out of the roof. Making a new opening sends tiles, pieces of batten and sawdust downwards, and you want all of that caught in one place rather than spread over the terrace and the borders. Put a wheelbarrow or a tub beside the build and keep the zone directly under the platform empty while anyone is up there with a saw running. Warn the household not to walk through there during those days.

How many hire days a new roof window takes

Installing a roof window usually takes three to four days, including the morning the build goes up. On the first day you make the opening: tiles off, battens cut through, the trimming framed and the roof made watertight again. On the second you set the frame, fit the lead and the flashing and lay the tiles back around it. What follows is the inside work. If you are only swapping an existing roof window, you finish sooner, because the opening is already there.

That inside work takes more time than people think. The reveals have to be insulated, boarded and finished, and that happens in steps with waiting time between them. Meanwhile you do not want to lose the tower, because there is nearly always a moment when something outside needs adjusting: a tile that will not close, or a strip of lead that refuses to sit down neatly. So reckon with a hire period running past the inside finish rather than to the day the window goes in.

Erected mobile scaffold with several decks against an elevation, as it stands through every hire day around the roof window

Keeping it standing longer has been made deliberately easy. After the opening 24 hours, which count in full, 95 per cent of the rate comes off every following hire day. Holding on to the tower for a week instead of three days therefore costs far less than you expect, while it buys you the calm to finish inside and go over the outside once more. Over a longer period the sums are worked through in the comparison between hiring by the day and by the week.

Which mobile scaffold suits installing a roof window?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

From stripping tiles to battens: working from the platform

From the 245 cm deck you work the whole opening without moving the tower. Start by lifting out the tiles over an area wider on all sides than the window itself, so you can get at the battens and the counter battens everywhere. Do not lay those tiles loose on the platform but in stacks against the wall side, where they are out of your walking route and cannot topple against the guard rail as you turn with a board or a frame.

Setting the window is a two person job. One stands on the scaffold and holds the frame, the other works from the loft and takes it through the opening. That division only works if you have room on the platform to turn with a window in your hands. Take the glazing out of the frame before it goes up; separately each part is considerably lighter, easier to steer and far less vulnerable in a sudden gust of wind.

Mobile scaffold along a side elevation with a clear deck, the workplace from which you handle tiles and battens

What gets underestimated is how often you go up and down during those days. Forgotten screws, the wrong size of lead, the sealant gun lying below: each time you spend ten minutes on the ladder. Lay everything out on the deck before you start, in the order you will need it, and hang a screw pouch on the rail. Only move the tower once the opening is closed and the lead around it is in place.

Hiring a mobile scaffold delivered: getting the roof window up

You get the tower delivered as a set of loose, counted parts. Booking is open until 15:00 on a working day; whatever is in by then goes into the van for the next working day, and the date is yours to pick. Choose the day before your first sawing day, so building and opening the roof do not fall in the same session. Make sure somebody is at home to point out the unloading spot. The charges for bringing and collecting are given per province including VAT.

Putting the tower together is your own job. The set comes with a manual and an instruction video, and with two people you are up at height within a couple of hours. Decide in advance where the parts may lie: a drive or a stretch of pavement, and not the spot where the frame will come out of the van. Lay the sections down in order, so you are not hunting through the pile for the right brace halfway through assembly.

Van at a house with the counted scaffold set aboard, waiting to be unloaded the day before sawing starts

We collect again on the day written into your booking. You dismantle the build and lay the parts together complete, somewhere reachable from the road. Go through the count as you strip it, so that no brace or deck panel is left in the loft or among the shrubs. Sweep sawdust and sealant residue off the deck panels before you hand them back, because on this job there is always some of it lying about.

Safety rules when you rent a scaffold for roof windows

Every platform in the fleet belongs to load class 3 of EN 1004: 200 kg per square metre. When you install a roof window you are up there with two people, a frame, a pack of insulation and a saw, and that limit is less generous than it looks on paper. Do not put all the heavy items on the wall side but spread them across the deck, and take down at the end of the afternoon whatever you no longer need that day.

Brake the wheels as soon as anyone steps on and never move the build with tools or a person aboard, not even across a few slabs. Stop in strong wind, certainly while the roof lies open: a loose sheet of film or a board then works like a sail. Once the build has been shifted, satisfy yourself that all four stabilisers bear again before you resume sawing, and that the rails on the roof side are still tight.

Assembled tower in a brick passage, guard rails at deck level and a hedge alongside the stabiliser feet

The particular risk on this job is the opening itself, and you make it with your own hands. Once the tiles are off there is a hole in the slope that you lean over from the tower and that somebody stands under inside. Do not work above one another, cover the hole as soon as you stop and leave nothing loose on the slope, not even a sawn off piece of batten. The remaining agreements are gathered in the guidance on working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for installing a roof window

1

Mark the place of the new roof window inside between the rafters first and then set it out on the paving outside. That is where the tower goes, directly under the opening and not half a metre beside it.

2

Take the glazing out of the frame before it goes up. Two light parts are far easier to handle from a scaffold deck than one heavy whole that two people have to tilt standing up.

3

Put a bucket or a tub on the platform for old nails, bits of batten and sawn off ends. Anything that does not go into it ends up in the gutter or under the wheels of the tower.

4

Cover the opening with film or a board as soon as you stop for the day. Even with a dry forecast the wind turns once, and a wet loft floor costs more time than covering ever does.

5

Ask somebody to man the inside on the day the frame goes in. One person on the mobile scaffold and one in the loft is by far the quickest crew for a job like this.

6

Keep the tower standing until the finish inside is done. There is nearly always a correction to make outside, and then you do not want to hire, take delivery and build all over again.

Frequently asked questions

Frequently asked questions about installing a roof window

Which tower do you hire when you fit a new roof window?+

For a new opening in the roof you take the wide version. The deck has to hold the frame, the glazing, timber for the trimming and your tools, and that does not fit side by side on a narrow build. Only when the passage to the back of the house is too tight do you fall back on the slim model and accept that less fits beside you. So measure that passage before you hire, at its narrowest point.

How does hiring a tower go when you have a roof window made?+

You settle online which build you want, to what height, and on which days the set arrives and leaves again. The amount is settled in advance and includes VAT. We unload the parts at the kerb, you build the mobile scaffold, make the opening and set the window, and at the end you hand everything back dismantled and complete. Plan your hire period so that the finish inside still falls within it, because that is where the overrun sits.

How many days should you hire the scaffold for a new roof window?+

Reckon on three to four hire days for the outside work and keep the tower on afterwards for the finishing inside. Day one goes on building and opening up the slope, day two on setting the window, the lead and the tiles around it. If it runs well you are carpentering inside on day three. Doing this for the first time, add a day, because setting out the opening takes patience.

What does it cost to hire and how does the second day work out?+

The rental price depends on the build and the height you choose, plus bringing and collecting per province. All amounts, VAT included, are on the price page for the hire fleet. For this job the second day is the interesting one: it weighs only a fraction of the first. Anyone leaving the tower up for the inside work therefore pays hardly anything extra, even when it turns into a full week.

What working height do you hire if the window sits halfway up the slope?+

Measure from the paving to the sill of the spot where the roof window will come; that is the point you must reach standing. With two storeys and a pitched roof you usually land in the 8 to 12 metre band. If the window sits high in the slope, the whole build moves up with it. Torn between two heights when you hire, take the roomier one, since you can always stand a deck lower but cannot order a section mid job.

Do I collect the scaffold myself or is it delivered when I hire?+

Both are on offer. Choose delivery and the tower is at the door on your own date, and we take it away afterwards, for a fixed price that differs per province. Anyone who would sooner drive is welcome at Zeeburgerpad in Amsterdam by appointment, at no charge, provided the vehicle can take a complete build. With a roof window, having it brought is practical, because your car is needed that day for the window and the timber.

Do you erect the tower, or is building it part of my hire?+

You build it yourself. We bring the mobile scaffold as a complete set and collect it later, but assembling, stabilising and dismantling are your work. With two people that takes a couple of hours, and the video supplied walks you through the steps. Cherry pickers, facade scaffolds and system scaffolds fall outside what we do; for a roof window at this height the wide tower is exactly the right tool.

Can I hire for longer if the work inside the roof window overruns?+

Report it as soon as you see it coming and we push the collection date back, as long as the tower is not booked in elsewhere. With a new roof window it is the inside work that tends to overrun: the reveals need more adjusting than expected, or a cable has to be rerouted. Because the days after the first weigh so lightly, it is better to take a generous period when you hire.

How much room has to be free in the garden for the build?+

Take the size of the build and add the diagonally splayed stabilisers at each side. Keep space free as well for the parts at delivery and for a tub of demolition material. In an average back garden that means garden furniture away, planters aside and the path to the shed clear. Do it before the mobile scaffold arrives, because you cannot wriggle an erected tower past a shed or under a pergola.

What do you do with an open roof if it starts to rain?+

The tower simply stays where it is; it is the roof that needs protecting. Close the opening with film or a board and fix it down before you go below, even when the forecast is dry. Use such a day to work on inside, level the reveals or sort the tiles you took off. Because you set the collection date, a day of delay costs almost nothing on this hire and nothing has to be rebooked.

When is the deposit back after hiring for a roof window?+

Alongside the hire you pay a deposit at the moment of booking. As soon as the collected parts have been counted and the scaffold set proves complete, that amount comes back within one working day. On this job, watch that no screws, sealant residue or scraps of lead stay on the deck panels and that no part is left among the bushes. More is set out in the explanation of the deposit.

Can you install a roof window without hiring a mobile scaffold?+

In theory yes, but nobody who does it often works that way. From a ladder you have no two hands free and cannot hold a frame while somebody presses from inside. All that material also has to lie somewhere dry and within reach. For this job, hiring a tower is the cheapest way to keep the number of days down, especially as you need it anyway for the lead, the flashing and the tiles going back.

Hire a mobile scaffold for installing a roof window today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.