See your price
Application

Painting a dormer roof? Choose the right scaffold.

Painting a dormer roof is the job on a dormer where you have to stand highest of all. You are not working against a face but down onto one: the flat little roof with its edges and trim lies above your working point, and you have to see across it to know where your brush has been. So the choice here falls on a wide mobile scaffold in the 8 to 12 metre class. Below is how you set that level, where the build goes and how many days to reckon on.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a dormer roof we recommend the Wide mobile scaffold.
  • To paint a dormer roof you hire the RS52 at a higher level than you would take for the front.
  • Your deck has to come out above the flat surface, or you are painting something you cannot properly see.
  • Two to three hire days is usual: waiting for dry weather, a primer coat, then the second after curing.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for painting a dormer roof?

Safe, stable and professional work at height

On this part of the dormer work everything turns on your eye level. The flat little roof sits on top of the dormer, so with a build measured out on the front you look at it rather than over it. You cannot see where the brush has already been, you miss the back edge against the roof slope and you paint with outstretched arms. Hiring a scaffold for painting a dormer roof therefore means choosing a level where the deck lies higher than the surface itself. That is almost always one or two levels above what you would guess from the pavement, and those extra metres you settle before you reserve anything.

  • Deck above the flat roof of the dormer
  • Looking down on the surface you are painting
  • Working height 8 to 12 metres for dormer roofs
  • The highest level of all the dormer work
Read more about working safely →

Hiring the right mobile scaffold to paint a dormer roof

Here too the Altrex RS52 is the model you take, the 135 cm wide version with levels up to 14.2 metres. The width has a different reason on this job than on wall work: you stand high and you bend forward to work on a surface lying lower than your chest. Then you want a deck you can plant both feet on firmly. All the available sizes stand together in the overview of mobile scaffolds in the hire range.

Paint comes up with you, and that makes deck space a practical matter. A tin, a tray, a roller on a pole, brushes, a cloth and a roll of tape all have to go somewhere, and at ten metres you do not want to fetch anything more. On a platform 245 cm long you set that down along the short side and keep the long side free as your working strip, so you can slide along the little roof without stepping over a tin.

Mobile scaffold built along a wall with its top deck above the roof edge, the level for work on a dormer roof

The narrow version comes just as high, only you stand less roomily on it at the moment you bend forward to take the back edge of the dormer roof. That is precisely the movement that makes this job awkward. Only go for the narrow build if the route to the standing position is too tight for 135 cm, and then keep your material at the bottom to leave the deck clear. What else a dormer involves is in this explanation about dormers.

Hiring the working height to come above the dormer roof

Your measuring point is the flat roof itself, and you want to look across it. So reckon from the paving up to the top of that surface and add half a metre, because your deck belongs above it. On a dormer on a house of two storeys that lands you in the 8 to 12 metre class, with your platform between six and ten metres. Above that platform you still reach about two metres yourself, but here you do not use that reach: you need it below you.

That makes this job different from every other task on a dormer. For the front, the sill or the frame you choose a level where you work straight ahead of you, and then a lower build will do. For the little roof you pick one or two levels higher, because otherwise you are painting by feel. Anyone combining the two jobs hires at the higher of the two levels and does not rebuild in between, since that costs you half a day.

Tower assembled to the height of a brick gable's upper edge, the build height you enter when booking

Do not forget the horizontal distance. The dormer roof lies behind the front of the dormer, and that in turn lies behind the eaves, so you are reaching across a stretch of sloping roof. The deeper the dormer stands on the roof, the higher you have to be to bring that back edge into view. Take that depth into the same measurement as the height, or your level will not be right. The page on ten metres of working height shows what such a level takes.

Where the hired mobile scaffold stands for the highest position

The higher you build, the less the ground may give. At a level of ten metres the weight presses on four small base plates, so you look for setts, slabs on a solid base, or asphalt. A lawn, a border or freshly made up sand is out, even when it looks firm. If there is nothing else, put wide boards or steel plates under the feet, so the pressure is spread over a larger area and the scaffold does not sink away.

The spot itself follows from where the dormer is. If it stands on the front roof you usually end up on the footway or a parking bay, and you talk to the council and to the neighbours. If it lies on the rear roof, the question is mainly whether you get the parts through the gate and whether there is a level piece of garden or terrace big enough. Count on room for the four stabilisers, which at this height belong fully extended.

Scaffold parts in the street next to a house, the hard surface on which you put up a tall build

Set the build slightly off the centre line of the dormer, towards whichever side you mean to start on. With a little roof two to three metres wide you will not make the far corner from a single point unless you start hanging. A second place along the same elevation is quicker and safer then, so reckon on two standing positions when you reserve. For sloping or uneven ground you can keep this piece on uneven ground beside you.

How many hire days painting a dormer roof takes

The surface to be painted is small; the waiting is not. You start with cleaning and sanding, then you lay a coat, and only when that has fully cured may the next one go on. On a flat surface moisture also lies longer than on a sloping roof, so in the morning it is often still wet with dew while the wall is already dry. Two to three hire days is therefore a realistic plan, even if each coat takes you only an hour.

The weather steers this job more than you would like. Full sun on a flat little roof heats the surface so much that paint pulls away too quickly, and wind at ten metres puts dust and leaves into your wet coat. The hours early in the morning or late in the afternoon are often the best moment. Hire your period so that you can pick out two or three of those moments rather than forcing one.

Mobile scaffold built against a front elevation above the roof edge, as it stands through the curing time

Fixing extra days for that need hardly cost you anything. Only the opening twenty four hours is charged in full; every day you stick behind it has 95 per cent taken off. Booking generously is therefore cheaper than stopping halfway and putting a ten metre scaffold up again later, with a second journey on top. That keeps the rental price predictable while you wait on the weather. In this piece on the hire period you read how others judge it.

Which mobile scaffold suits painting a dormer roof?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting the little roof from the top deck of the scaffold

From a scaffold deck of 245 cm you cover almost the whole width of an average little roof. The depth is the problem: the back edge, where the flat surface meets the sloping roof, lies furthest away. So work from the back forwards, so that you never have to lean over a wet strip to touch something up. That keeps your way out to the guard rail dry and leaves only the near edge to finish at the end.

Moving is part of it, even though the surface is small. For the second half of the little roof you stand a few metres to the side, and you make that move with an empty deck: paint and tools off, brakes released, a few metres along, stabilisers set out again and only then your things back up. Count on two positions of the mobile scaffold at a normal dormer and on three if it is wide or a side has to be painted too.

Mobile scaffold along a side elevation with deck and rails at height, the second position you take at a dormer

Carry every last item up in a single trip. At this height, going down for a forgotten brush is a climb of ten metres and back, and with a half laid coat you do not have that time. What people underestimate is the twisting: you work bent over, you are looking down and you have to step sideways each time to move on along the edge. If the rest of the dormer is on the list, plan it straight after in the same hire period.

Delivery and building when you hire a tall mobile scaffold

You receive the mobile scaffold in loose parts, counted and complete, and for a level of ten metres that is a considerable load. Choose in advance a place where those parts may lie without blocking the door or the garden path, and remember that paint tins, a step and dust sheets are coming as well. An order placed ahead of 15:00 on a working day puts the load on the road for the following working day, and that date is yours to name.

Building is your own work. There is a manual in the set, and the accompanying video runs through the order with you; with two people you put this level up in half a day. Plan that build for the day before your first coat and not for the same morning, because then you start painting when the best weather of the day has already gone. What the journey costs you can see at the rates for delivery per province.

Steigertaxi van delivering scaffold parts, the drop off you plan a day before the first coat of paint

Collection is ours again, on the day you gave when you reserved. You take the build apart and lay all the parts together where a van can pull up alongside. Only do that once the last coat is truly dry, or you drag paint across the deck boards and the guard rails. Pass the parts down from the top with two of you rather than dropping them onto the slabs, because that is what the count reckons with.

Painting a dormer roof safely at height on the scaffold

The deck boards answer to EN 1004 in load class 3, so a square metre of decking may take 200 kg. For painting that is ample, because you take little weight up with you. What does count at this height: lock the castors before you step up, let nobody stand on the build while it is being moved, and stop working as soon as the wind gets a grip on the decks. More on that is in the notes on this standard.

The real risk of this job is hanging forward. Because you work on a surface that lies lower and further away, the temptation to lean over the guard rail or put a foot on the bottom rail is strong. That is exactly the movement that gets people into trouble at ten metres. Rather move the build one more time, even if it costs a quarter of an hour. And never step onto the flat little roof itself to finish the last corner.

Stabilisers splayed out under a mobile scaffold, the firm base beneath the high level used for a dormer roof

Finally, watch what is happening below. A paint tin you catch with your elbow comes down from ten metres and goes straight through a roof window or over a car. Stand your tins against the upstand of the deck, close them the moment you take a break and keep the zone under the scaffold completely clear. Tell the household and the neighbours when you are working above, certainly if their driveway falls within that area.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a dormer roof

1

Go and look once from a ladder or out of a roof window to see how the flat little roof really lies. Then you know before reserving whether you are touching up edges or treating the whole surface.

2

Measure the top of the little roof with a long batten held against the wall. That stops you guessing by eye and hiring a level too low, which is the most common misunderstanding on this job.

3

Paint early in the morning, once the dew has gone. Moisture hangs about on a flat surface, and a coat laid on damp timber will not last a season out.

4

Stand your paint tin in a bucket on the deck rather than loose against the guard rail. At ten metres a toppled tin is not only a waste of paint but dangerous for anyone below.

5

Take a small mirror or your phone up to check the back edge against the roof slope. You cannot tell with the naked eye whether you have covered everywhere, not even from a high level.

6

Keep one hire day spare for a final inspection in different light. What looks solid in afternoon sun can fall just short under cloud, and touching up only works while the build is still there.

Frequently asked questions

Frequently asked questions about painting a dormer roof

Which mobile scaffold do you hire to paint a dormer roof?+

You hire the wide RS52 at a high level. You need the width not so much for stowing material as for standing firmly while you work bent over on a surface below you. The narrow version reaches just as high and is an option when the route to the standing position is tight, but then you give up stability at the moment you need it most. So when in doubt, hire the wide tower.

Why do people hire a higher level here than for the rest of the dormer?+

Because you have to look down on the surface instead of at it. The roof sits on top of the dormer, so if your deck stays at the height of the front you cannot see it and you paint by feel. For this job you therefore hire a mobile scaffold that comes one or two levels higher than what you would take for the frame or the sill below it. That is the highest level a dormer needs.

How many hire days does painting a dormer roof need?+

Reckon on two to three days. The painting itself takes an hour per coat at most, but you need dry weather, the first coat has to cure, and dew lies a long time on a flat little roof. Hiring a spare day means you can pick the best moment instead of starting on a morning when it is not really possible. Plan tightly and you lay the second coat too early, or not at all.

What does the hire cost and why is an extra day so cheap?+

What you pay depends on the level you need and on the journey to your address. The rental price per model and level appears with VAT included on the overview of rates for a mobile scaffold. The opening twenty four hours makes up the largest part of the bill, and every day you stick behind it adds only a small share. On painting work with curing time that is welcome, because you can reserve generously without worry.

Which working height should you hire to come above a dormer?+

Most people hire 8 to 12 metres here, with the deck between six and ten metres. You measure not to the gutter and not to the sill, but to the top of the flat little roof, with half a metre extra so that you look down on it. If the dormer sits deep on the roof plane, hire a level higher still, because the distance across the roof counts. The working height overview lists which build belongs to each level.

Do you have this set delivered or collect it when you hire?+

Either route works for a job like this. Delivery is practical at this height, because a fair number of parts go along, and dropping off and collecting sit together in a fixed amount per province. Fetching it costs nothing, by arrangement at Zeeburgerpad in Amsterdam, provided your transport takes parts of well over two metres and you bring somebody along to load. Anyone who needs the tower for only a couple of painting moments usually chooses delivery.

Who builds the mobile scaffold if you hire it for this?+

That job stays on your side of the hire. We drop the complete set off and pick it up again, but building it, shifting it and taking it down all fall to you, helped by the manual and the video. At this level two people need half a day, planned for the day before your first coat. Delivering it erected or arranging a cherry picker is not in our hire range, so keep that time in your planning.

What if the weather is against me and I have to hire longer?+

Report it and the collection date moves with you, unless the set is already fixed for a following customer. On this work a delay is the rule rather than the exception: a shower in the night makes the flat little roof unusable in the morning, and then the coat does not go on that day. You are better off hiring generously from the start than extending afterwards, because then you know you have the days you need.

How much room has to be clear for a build this tall?+

More than for a low mobile scaffold. At this level the stabilisers are fully out and splay to every side, so you need a level bay a good deal larger than the build itself. On top of that you want a place for the parts and for your painting kit. A parking bay, a driveway or a roomy terrace works well; a narrow path along the wall is too tight to build on safely.

Can the build stay standing between two coats of paint?+

Yes, and that is precisely why you count in hire days and not in working hours. The mobile scaffold stays where it is while the first coat cures, with the brakes on and the stabilisers out. Only take tins, cloths and tools off the deck when you stop, certainly if wind is expected. Next morning you climb up in exactly the same place and have nothing to measure out or move again, which saves you half an hour a day.

How quickly is the deposit back after hiring for this painting job?+

Within one working day, once the returned parts are counted and nothing turns out to be missing. When you hire for painting, the counting is not the hard part; the state of the deck boards is. Dried paint and spatters do not belong on them. So lay a sheet on the deck where you are working and wipe spatters away before they harden. The rest of the procedure is described in the article on your deposit.

Will I reach the back edge of the flat little roof from the scaffold?+

If you stand high enough, yes, because then you look across the surface at an angle instead of at it. Stay too low and you cannot see that back edge and you start hanging to get at it anyway. So measure the depth of the dormer as well and hire a level roomier than you think you need by eye. If that still does not do it, only working from the roof itself remains, and a hired mobile scaffold is not meant for that.

Hire a mobile scaffold for painting a dormer roof today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.