See your price
Application

Roof covering maintenance? Choose the right scaffold.

When you maintain a roof covering you do not stop at looking, you put right what you find on the spot: sealing a seam again, pressing back a bonded edge that has lifted, cutting a blister open and patching over it. Rolls of repair material, sealant, primer and sometimes a torch go up with you for that. That weight and that kit decide what you hire, which is why you take a wide mobile scaffold of 135 cm at 8 to 12 metres of working height. Reckon on more rental days than for a survey.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For roof covering maintenance we recommend the Wide mobile scaffold.
  • Repair work on roofing at two storeys asks for the RS52 with its 135 cm floor and a reach of 8 to 12 metres.
  • Material, sealant and sometimes a gas torch travel up with you, so you need floor to put everything down on.
  • Reckon on two to four rental days, because primer and sealant have to cure before you tackle the next piece.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for roof covering maintenance?

Safe, stable and professional work at height

Repair work on a roof covering is precision work in an awkward place. You cut a blister open, apply primer, press a strip down and hold it until it takes, all on the edge of a roof surface you cannot simply stand on. For that you need a fixed floor where tools and material can sit beside you, because climbing down for every roll or aerosol costs you half a day. So renting a mobile scaffold for this buys you more than height alone: it is the workbench you stand on for a few days, and that is exactly why you keep it longer than for a survey.

  • Material and tools stay within arm reach
  • Seams, bonded edges and upstands sealed again
  • Working height 8 to 12 metres to the roof edge
  • A longer rental period than merely assessing
Read more about working safely →

Hiring a tower with enough floor for materials and tools

Repairing a roof covering means taking a great deal up with you: rolls of repair tape, a tin of cold adhesive or sealant, primer, a brush, a knife, a roller and cloths to keep your hands clean. That does not fit on a plank of 75 cm without you tripping over it. That is why you hire a mobile scaffold with a genuinely wide deck here, the Altrex RS52 with its floor of 135 cm, with your material on one side and you working on the other.

That width counts double when there are two of you. One holds a strip in place while the other presses it down or heats it, and you do not want to knock elbows on a narrow floor with open tins of sealant between you. With a platform length of 245 cm you can also follow a whole seam in one go without moving halfway. You only really notice that difference on the third working day. The sizes stand side by side in the overview of models you hire by the day.

Parts of the wide 135 cm model by a front wall, everything for the deck arriving loose at your address

If the surface to be repaired sits on a garage or a low extension, the MiTower with 4.2 to 6.2 metres of working height is a lighter option, though you work alone on it and with far less floor. A storey higher and that reach falls short. Where the way round the back runs past a narrow gate, the RS51 at 75 cm remains, while the RS44 room scaffold exists only for jobs inside the house.

Working height to hire for repairs to seams and edges

On maintenance to the covering the work sits in two places: in the surface just behind the rim, and on the upstand where the layer runs up against a wall or a dormer. The highest point you have to reach with any force is usually that upstand or the roof edge trim over it. If the flat part lies on the second storey, 8 to 12 metres of working height belongs with it, and that is what you state in your booking.

You convert height into build with the familiar ratio: above your floor there is roughly 2 metres of reach, and the two together make the working height you fix. For repair work you pick that setting a little lower than for a survey, because you have to push and roll rather than only look. With your waist level with the rim you put your weight through properly. The build per height is shown on the page about 9 metres of working height.

Mobile scaffold set along a house wall with its deck level with the roof edge, the setting for pressing seams down

Choose too low and you work with your arms stretched above your head, which you notice at once when pressing a seam down: the strip does not lie tight and the repair lets go after one winter. Measure from the point where the wheels meet the ground, so from the terrace or the garden path at the back, and not from a raised step or the threshold of the back door. In doubt you hire a size up.

Setting up beside the extension where the roofing is repaired

Flat surfaces usually lie at the back or to the side: over an extension, a garage or a store. Your standing position is therefore seldom the street but the garden path, the terrace or the drive beside it. Go over that place before you hire, and think not only of the tower itself but of where your rolls, tins and a gas bottle will stand. Everything you set out below has to stay clear of the zone the stabilisers reach into.

Under the wheels you want firm, level ground that does not sink if it rains overnight. Terrace slabs and bricks are suitable, wood chippings or a newly laid lawn are not. Watch for a level difference between garden and terrace, for an inspection cover or a crawl space hatch under your foot, and for hedge branches that come out exactly at floor height. Measure the spot before you book. For ground that falls away, levelling on a sloping or soft base offers a way out.

Stabilisers folded out on slabs next to a house, the firm build repair work at height calls for

On this job take account of what happens below you as well. Cut offs of bitumen, drips of adhesive and a knocked over tin of primer leave marks on paving that never come out, so put an old sheet under your build. If you work with a torch you also want nothing flammable near the foot: no garden cushions, no jerrycan, no dry hedge. Warn the neighbours if you stand right on the boundary, and set a bucket of water ready below.

Hiring longer than for an inspection: the number of days

Maintaining a roof covering takes longer than assessing it, and that difference is not in the number of actions but in the waiting. A surface has to be clean and dry, primer has to grip, sealant has to cure and a strip you have pressed down you would rather leave alone overnight before stepping on it. For a flat roof section with a handful of repairs you therefore reckon on two to four days with the tower standing.

The weather decides more here than your planning. Nothing bonds on a wet surface, in full sun bitumen goes too soft to press down neatly, and in frost a strip lets go straight away. So look for a run of dry days and do not put your first working day on the day the shower has just passed. If a second surface on the other side of the house has to be done, add a day of building.

Mobile scaffold built along a house, the standing position that stays up through several rental days of repair work

For the wallet a generous booking is nearly free here: you pay in full for the first 24 hours and on all the days after that a reduction of 95 per cent applies. A waiting day while the sealant cures therefore costs you almost nothing, while booking too tight forces you to dismantle with half a repair done. How to settle such a period is worked out in the article on setting the length of your hire.

Which mobile scaffold suits roof covering maintenance?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Repairing seams and bonded edges from a 245 cm platform

Per build you finish a strip of two and a half metres of roof edge, and you divide that up. First clean the piece and let it dry, then treat the loose seam or the blister you have cut open, then the bonded edge and the joint onto the upstand, and finally go over everything and press it down. Do that completely before you move the tower, because coming back to half a repair means unrolling and cleaning all over again.

What goes up goes up in one trip. A bucket holding your rolls, your sealant, your knife, your brush and a cloth saves you four climbs, and a long piece of tape you cut to size below. Open tins and aerosols belong in the middle of the floor, well away from the guard rail, because it is exactly when you bend forwards that you knock something over. A dropped tin of primer on paving is an expensive stain.

Mobile scaffold built along a side elevation, the position from which one strip of seams is repaired

What people underestimate is the number of builds an apparently small surface asks for. Unlike maintenance on a tiled roof you do not run round a gutter here but stay on one flat area. An extension of six metres with an upstand all round already means three positions. Find more damage under a loose strip than expected and the work gets heavier and you hire on longer. If the layer is truly finished, it turns into repairing the roof covering instead.

Arranging delivery and rental before the repair work starts

The mobile scaffold comes to you in parts, counted out and complete, and that stack has to lie somewhere it is not in your way while you work. Do not pick the place under your build, because your sheet with cut offs is going there. Lay the stack on a piece of sheeting if you can. What you settle on a working day before 15:00 we load the following working day, so you can still match the delivery to the forecast at short notice.

Putting it together stays your task. A manual is included and a fitting video is online; with two people you are building for half a day before the first roll of repair tape goes up. So plan that build a day ahead of your first repair, rather than starting halfway through a day. Both the day it is brought and the day it goes back are yours to pick, so you can assemble on a still morning and do the bonding work the day after.

Complete set of scaffold parts checked and set out, the way you receive it for your roof covering maintenance

Once the repair is finished and the last seam pressed down, you take the build apart and we come and remove the parts. Only do that when you are sure you need to get up nowhere else, because building a second time for one small spot wastes a day. Count the parts as you dismantle and the set goes back complete. What the journey there and back costs in your province is listed with the amounts for delivery.

Working safely with hot material on a hired platform

These mobile scaffolds are made to EN 1004 and fall in load class 3, with a permitted load of 200 kg on every square metre of floor. On maintenance to a roof covering you add up faster than on a survey: two people, a tool box, a case of rolls and possibly a gas bottle sit close to that limit together. So do not set everything down on one half of the floor, and take material you have used back down in between.

The basic rules stay unchanged: brake the wheels before you climb on, only wheel the build when nobody and nothing is on it, and put the stabilisers firmly back on the ground after every move. In wind you stop, and here doubly so, because a gust catches a loose length of repair material and a flame cannot be aimed in the wind. Check as well that the gutter below you is free of dry leaves, and lay your gas hose aside before you move.

Mobile scaffold built up in a narrow alley, its deck the height a hired build of this size gives you

Working with a torch or a hot air gun, keep a fire blanket or a bucket of water within reach and never work right along a wooden fascia board or a plastic outlet. Let the material cool a moment after heating before you put tools away, because a warm roller stays hot on an aluminium platform for a long time. Leave the floor clean at the end of the day for the next morning. The rest of the agreements are in what applies when working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for roof covering maintenance

1

Cut your repair strips to length below and roll them out loose beforehand. Working up on the platform with a knife and a full roll costs more time and gives you crooked edges.

2

Clean the base with a brush and let it get properly dry before you apply primer. Fresh sealant on a damp seam does not last a winter, and then you are up there again next season.

3

Work on the shaded side when it is warm. Bitumen goes soft and sticky in full sun, and then your shoes drag tracks through the work you have just pressed down.

4

Put a bucket with a lid on the platform for cut offs and used cloths. That saves mess in the gutter and in the garden, and you need not climb down with full hands.

5

Keep your gas bottle standing below if you can, with only the hose and the torch going up. That saves weight on the floor and keeps flammable material out of your working strip.

6

Plan the last rental day as a checking day. You go over all the repaired seams once more while the tower is standing there anyway, and only then do you dismantle in peace.

Frequently asked questions

Frequently asked questions about roof covering maintenance

Which mobile scaffold should you hire for maintenance on a roof covering?+

Here you hire the wide RS52, a mobile scaffold with 135 cm of floor width, at a working height of 8 to 12 metres. The room is there for rolls, sealant, primer and tools, and you are often up on it in twos. If the surface lies on a single storey garage, the lighter MiTower already gets you a long way. Can you only reach the back through a tight gate, then the slim RS51 is left over.

What exactly do you arrange when hiring a tower for repair work?+

In the booking you fix the model and working height of the tower, plus the delivery date and the date on which the set is collected again. We supply the parts complete, you build, do your repairs and then set everything out dismantled for the collection run. On this job it pays to use the first day only for building and preparing, so that you start the real work with dry material and a clean base.

How many rental days does maintenance on a roof covering take?+

Two to four days is a usual period. The applying itself goes quickly, but primer has to take, sealant has to cure and you would rather leave a fresh repair alone for a night. On top of that, opening up a seam sometimes reveals more damage than expected. Anyone taking in several surfaces or a dormer sooner ends up at four days. Hiring generously beats extending halfway through on this work.

What does this hire cost and how does the discount per day work?+

The rental price consists of the tariff for model and working height of the tower, with a fixed provincial amount on top for the journey there and back. The tariffs including VAT are on the page with the prices. On repair work the way that tariff is built up suits you, because after the first day each following day hardly counts. The waiting days that go with sealant and primer therefore cost you little.

Which working height do you rent to get at the upstand and the rim?+

The point you have to get at with force is the top rim of the upstand or the finish over it, and that is what you measure to. On a second storey that means 8 to 12 metres of working height, counted from the ground the wheels of your tower come to rest on. Look for the position where the rim sits about waist high, because then you can press down without stretching your arms upwards.

Can you have the mobile scaffold delivered when you hire it?+

You may choose. With delivery we bring the mobile scaffold in parts on your chosen day and everything goes back with the van afterwards, for a fixed provincial amount. Collecting is allowed too, free of charge and by appointment in Amsterdam, provided your transport can take the load. On maintenance to a roof covering most people have it brought, because they need their own car or trailer for material and waste.

Do I have to build the scaffold myself, or do you do that at the hire?+

The building is your work. We bring a complete set and take it away later, but everything between those two moments is yours to arrange, with the enclosed description and the assembly video beside you. With two people that costs half a day. A facade scaffold, system scaffold or cherry picker you will not find in our hire fleet. For repair work along a roof edge a tower is more practical anyway, because you move it yourself to the next seam.

If the repair runs over, can you keep the tower on hire?+

Report it as early as you can and we will shift the collection day if no other hirer is waiting. On maintenance to a roof covering it regularly runs over, usually because an opened seam turns out to hide more damage or because it is too wet to bond. Booking generously means you never notice, and bringing the scaffold back early never costs you anything extra. Say so the same day and the tower simply stays where it is.

How much clear space does the build need in a back garden?+

Beside the footprint of the build you need the room the stabilisers reach out into, and on this job a strip for your material and a sheet against staining as well. If you work with a torch you keep that zone clear of anything that can catch fire. In a back garden that usually means moving the garden furniture and the planters aside first, well before the tower is delivered to your address.

Is it better to wait with the hire if rain is forecast?+

The mobile scaffold can happily stand out in the rain, but your repair work cannot. Nothing bonds to a wet base and a strip you press onto damp comes loose again within a season. Use a wet day to clean up, to cut material to size or to clear the gutter. Because you decide the collection day yourself, you simply push the bonding work on to the first dry day.

What happens to your security sum when you hire for this repair work?+

You pay a deposit at the booking, which is transferred back to you after the set has been checked for completeness, usually within a working day. On this job watch above all for residues of sealant, adhesive and primer, because you will not get those off a scaffold floor or a tube later. So lay a cloth where you set your material down and clear up spilt adhesive at once. More is in the explanation of the security sum.

May you step onto the roof covering from the tower you hire?+

Only if the structure underneath is designed for it and the layer is dry and clean, and even then preferably not. Fresh repair work damages under your soles and a blister or a soft spot only gives itself away when you go through it. So work as much as possible from the platform and move the tower one extra time rather than walking a few metres across the surface. That is exactly what you hire it for.

Hire a mobile scaffold for roof covering maintenance today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.