See your price
Application

Repairing roof covering? Choose the right scaffold.

A leak in a roof covering is almost always no bigger than half a metre across, but you still have to reach it and get your materials up there with you. When the roof edge sits six to ten metres above the garden, climbing a ladder up and down is not a serious way to work. For repairing roof covering you hire a wide mobile scaffold with a reach of 8 to 12 metres. This page sets out which model that is, where it stands and how many hire days are sensible.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For repairing roof covering we recommend the Wide mobile scaffold.
  • A repair to roof covering calls for the wide RS52 at 135 cm across, with a reach of between 8 and 12 metres.
  • The damage itself is small, but a roll of material, tools and a bucket of debris all have to go up with you.
  • Allow two to four days of hire, because working out where the water actually comes through takes longer than sealing it.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for repairing roof covering?

Safe, stable and professional work at height

When you repair roof covering the scaffold is not only your lift up, it is your vantage point while you search. Rainwater comes through the ceiling in a completely different place from where it passes through the layer outside, so you walk the edge, lift seams and check every outlet and upstand. That takes time and two free hands. On a ladder everything hangs off one arm and you shift yourself every metre. Anyone who decides to hire a mobile scaffold gets a flat working deck just under the roof edge, with room for tools and material beside them, and steps onto the roof from there in their own time.

  • Reach the roof edge without balancing on anything
  • Material and tools go up in one trip
  • Reach of 8 to 12 metres at high edges
  • Search calmly for where the covering is lifting
Read more about working safely →

Hiring a mobile scaffold for repairing roof covering: which model

Take the wide 135 cm version for roof covering, the RS52 from the Altrex range. That size looks heavy for a repair of less than a square metre, but you rarely go up with a sealant gun alone. Up with you go a length of roll material, a knife, a pressure roller, a bucket for the old stuff and usually someone to pass things across. On a slim deck all that ends up against your calves. On the wide deck you push it to one side and keep a walking strip along the edge clear.

What you cover from one position follows from the platform length of 245 cm. With a leak that matters more than usual, because the broken spot is seldom directly above the stain you can see on the ceiling indoors. You work along the upstand, along the vent pipe and along the joint with the dormer. With a good two metres of edge per position you walk a normal rear elevation in three or four moves, without skipping a suspect seam.

Wide mobile scaffold built up beside a house, exactly the position from which you reach a leak in the roof surface

If the wide frames will not go through your gate, only the 75 cm version is left. You trade working room for access, and at ten metres up you feel that all day: every bucket you set down is in the way of something. Indoor towers such as the room scaffold or the one-person MiTower drop out for this job, because they come nowhere near this height. Go through the models standing ready for hire calmly before you commit to anything.

Which working height to hire for a roof covering leak

Do not aim at the ridge or the highest point of the building, but at the edge you have to step over. On a flat roof above the second or third storey that edge hangs six to ten metres above the garden. The reach that goes with it is what we call working height, and you work it out as your platform height plus roughly 2 metres that your arms add. That is where the 8 to 12 metres for this kind of roof comes from.

Ideally your deck stands a hand's breadth below the edge. Stay well under that and you hoist every roll above your head onto the roof without seeing where it lands. Come out above it and you step down onto the roof with a full bucket, which works even worse. So measure from the paving where the castors will stand to the top of the edge, and if you are in doubt pick the build that reaches a little further than you calculated.

Front elevation with a mobile scaffold alongside it, the top platform stopping just below the gutter and roof edge

Booking too low cannot be fixed afterwards. Nothing may be slid under the legs and nothing should be stacked on the deck to make up that half metre. So before you hire, check whether a rooflight, a chimney or a raised upstand rises above the edge that you also have to work on, because that lifts the whole job a rung higher. Which build goes with a reach of 10 metres is set out on the page about it.

Where to stand the mobile scaffold for roof covering repair

Flat roofs often sit over an extension or a rear annexe, so the tower usually ends up in the back garden or on an inner courtyard. That is rarely the flattest part of the plot. Brick paving and a concrete drive are fine; a lawn that sinks under the castors after a week of rain is not. Clear a space of roughly three by three metres, because at this reach the four stabilisers stand well out and all four want to rest on the same firm layer.

Behind a house there is nearly always something in the way. Think of a water butt under the downpipe, a canopy sticking out half a metre, a shed hard against the boundary or a terrace with a step in front of it. Walk that route before the parts arrive, because every obstacle you have to work around means an extra move and so half a day of work. How to deal with a sloping garden is described in the notes on setting up on uneven ground.

Stabilisers wound out under a tower on paving, an indication of the clear square you need in a back garden

Keep the supply line for your material in mind as well. A roll of roof covering is not something you get up a ladder on your own, so you want to stand close enough to the gate or the back door for things to be handed across. If the tower partly stands on the neighbours' path, mention it in advance. With a leak you often end up staying a day longer than expected, and that conversation is better had on a Monday than on a Wednesday morning.

How many days to hire a tower for roof covering repair

Sealing takes an hour, finding takes the day. You start at the edge and the outlets, scoop leaf litter out of the corner by the drain, lift seams and sometimes pour water over a suspect strip to see where it goes. Before you know it the morning has gone. After that the spot has to be dry and clean before new material may go on. For most repairs that comes down to two to four days of hire.

There is waiting time in it too that you cannot speed up. A wet substrate does not rub dry, and a repair made onto damp will let go again sooner or later. The weather does the rest: in rain and in frost the roll simply stays on the ground and nothing happens. Plan tightly and have to be finished on day two, and after a wet night you stand with a half opened roof surface while the van is already at the door.

Mobile scaffold erected along a side elevation, left standing for as long as the repair above is unfinished

Happily the way the rate is built up works in your favour. Only the first twenty four hours are charged in full and every following day has 95 per cent taken off, so two days of slack costs you almost nothing extra. Set your end date not on the day you hope to be done, but on the day you know for certain it has worked. Every amount, VAT included, sits on the page listing the rental price per build, so you can do the sum before you book.

Which mobile scaffold suits repairing roof covering?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Repairing roof covering from a platform of 245 cm

From one position you cover a good two metres of edge plus the piece of roof surface behind it that is still within arm's reach. Finish that section completely before you climb down: searching, sweeping, cutting out, laying new material and going back over the seam. Move halfway and you unpack and repack everything twice. With a leak you have not found yet the urge to shuffle along is strong, but then you lose track of which part you have already covered.

You move to the next position with an empty deck. Take off the roll, the knife and the bucket, even if you only shift two metres, and do not leave your coat over the guard rail either. Then look at where the castors will run, because a back garden is rarely laid true and a rocking slab gives you a crooked floor straight away. Tighten the four stabilisers properly again after every move before anyone climbs up.

Mobile scaffold with platform set up along a modern house, the deck you work the roof surface from

Where it usually goes wrong is the logistics of the material. A roll of roof covering is heavy and stiff, and you would rather carry it once properly than three times badly. Take up only what you are certain you need per position and lay the rest ready beside the legs below, so that passing things up stays a matter of reaching. If you are also going through the repair of a leaking gutter, add a position and therefore a day.

Hiring a mobile scaffold with delivery on the day of repair

What you get delivered is a complete set of loose parts, counted out. Agree in advance which square metres that stack may land on, preferably on the drive or right beside the gate and certainly not in the middle of the path you will be carrying a roll along. An order placed on a working day before 15:00 goes out for delivery on the next working day. With a roof that is already letting water through, that saves a night with buckets.

The date the parts arrive and the date they go back are yours to choose, and with roof work you set them against the forecast for the week you want to start. Ask for delivery a day before your first working day, then the build is behind you and you begin the next morning with full hours of daylight. Take the order of assembly from the step by step guide with you, so you are not puzzling over a brace halfway through.

Delivery van with scaffold parts at the door, the drop you would rather book a day before roof work

Once the roof is watertight again we come and collect it all. You take the build apart, count the parts as you stack them and set them out complete on the same square metres where the van dropped them. If that count is right the job is finished as far as we are concerned and you have nothing else to arrange. What you pay for delivery differs by province and is listed with the rates for bringing and collecting.

Working safely at height when repairing roof covering

The deck under your feet is rated for two hundred kilos per square metre, which is load class 3 under EN 1004. That sounds like a lot, but with two people, a full roll and a bucket of broken material you run up against it sooner than you expect. So spread the weight over the deck instead of putting everything in one corner against the rail. What you strip off the roof goes down before new stuff comes up.

The ordinary rules apply here too. Brakes on as soon as anyone gets on the ladder, nobody and nothing on the deck while you roll it along, and in a stiff wind you stay on the ground. You reach that limit along a free standing rear elevation at ten metres sooner than between two houses at four. Cut roof covering also acts like a sail that pulls at everything, so fix down what you loosen or throw it straight to the ground.

Tower assembled hard against a brick elevation, a separate extension ladder propped on the same wall beside the stabilisers

The real risk on this job is the step across onto the roof. As soon as you are over the edge you are no longer inside the rails and the scaffold no longer protects you. Only take that step if the work genuinely calls for it, keep the edge clear of tools and work from the deck as much as you can. Put nobody to work underneath the tower: a knife or a roll that goes down lands exactly there.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for repairing roof covering

1

Pour a bucket of water over the suspect strip first and have someone inside watch where it comes through. That can easily save you half a day of searching from the deck.

2

Take a sturdy bag or a bucket up with you rather than loose bits in your coat pockets. Anything that ends up on the edge of the deck will blow or be kicked off sooner or later.

3

Chalk a mark beside each castor before you move. If you have to come back to the same section after a wet day, the tower stands exactly right again in a minute.

4

Empty the outlet and the corners of the roof before you start looking. Piled up leaf litter gives exactly the same wet patch indoors as a tear in the layer above it.

5

Ask for the parts a day before your first working day. The build is then done and the next morning you have every hour of daylight available for the real work above.

6

Leave the roll on the ground until you know which piece is coming out. An opened roll that stays up overnight catches rain and wind and is unmanageable by the next morning.

Frequently asked questions

Frequently asked questions about repairing roof covering

Which mobile scaffold should you hire for repairing roof covering?+

Go for the wide version if it is a flat roof over two or three storeys. Up there you need room for roll material, tools, a waste bucket and usually a second pair of hands, and a wide deck offers that where a slim one does not. If the wide build will not fit through your gate, the slim variant is what is left. So before you reserve a scaffold, measure the narrowest opening on the route to the back.

How does hiring a mobile scaffold for a roof leak work, from booking to collection?+

You fix the model and the height online, choose the day the parts arrive and the day they leave, and pay a fixed amount with VAT already included. On the agreed day the parts are ready, you put them together in the garden and finish the roof. On your last day you take the tower apart and set everything together. Nothing else needs arranging, beyond deciding in advance where the build will stand. We make sure the set is with you on the agreed morning.

For how many days of hire should you reserve a tower for a roof covering leak?+

Two to four days is an honest estimate. The actual sealing takes an hour or so, but the tracing, the sweeping and the waiting until everything is dry fill the rest. If you already know exactly where the damage is, it sometimes works within two days. If you have several suspect spots to go along, allow more. A day too much hire is always cheaper than a day too little. Doing several roofs one after another adds half a day each.

What does hiring a scaffold cost and how does the rate work from the second day?+

The hire price comes out of the model and the height range you book, plus the transport amount that is fixed for your own province. Everything is visible online including VAT, so there are no surprises afterwards. For roof work that turns out well, because the first day weighs heaviest and the days behind it barely count. Booking a tower over a generous period is therefore smarter than two short hires in a row.

What working height should you rent when the roof edge sits at eight metres?+

If the edge sits at eight metres, take a reach of 10 metres, so the deck comes just under that edge and you do not have to stretch up to it. Begin your measurement at the paving under the castors and not at the front door step, because a sloping back garden easily accounts for half a metre. The page listing every height shows which build of the tower goes with it. If in doubt, the higher of two is always the wiser choice.

Do you put the scaffold up for me, or do I build it myself?+

Putting it together is your job. In the set there is a manual and a film that talk you through the right order, and two people get it standing in half a day. Allow for that half day in your planning, because on the build day itself you will barely get to the roof. Facade scaffolds, system scaffolds and cherry pickers fall outside our hire, so for this work the mobile scaffold is what remains.

What if the roof repair runs on and you need the tower on hire for extra days?+

Tell us in time and the collection day moves back, unless the tower is already booked out to the next customer. Roof work overruns more often than other jobs, because you need dry weather and because you only see what is under the old layer once it is open. Anyone who wants to soften that risk simply adds a day when they hire. Handing back early is always possible, so a generous plan only costs you some arithmetic.

How much clear space has to be around the foot of the scaffold?+

Take the footprint of the mobile scaffold and add the spread of the stabilisers all round; at this reach they stick out a long way. In practice you are looking for a level space of about three by three metres that is clear on every side. Move a water butt, planters or a bike rack out of the way before the parts arrive. Count in a strip as well where the loose parts may lie during the build.

Is the tower still worth hiring on days too wet to touch the roof covering?+

The mobile scaffold will happily stand through a wet day; only the roof work shifts. New material on a damp substrate does not bond and comes away later anyway, so those hours are thrown away. Use such a day instead to clean the outlet, walk the edge or lay your things ready. You decide yourself how long the build stays up, so a shift like that usually costs no more than a day. Do put your material inside that evening.

When is the deposit back in your account once you finish hiring?+

You settle a deposit when you reserve; after the return it comes back into your account within one working day, as soon as the count of the scaffold set is right. With roof work watch two things: hand back every part you received, and leave no dried sealant or bitumen on the tubes and deck boards. Report damage straight away rather than letting it surface at the count. A scraper and a cloth on the last day prevent trouble over getting the deposit back.

May you step onto the flat roof from the platform of the hired scaffold?+

You can, and on this job that is usually the intention, but keep in mind that on the roof you are standing outside the rails of the mobile scaffold. So set the deck just under the edge, keep the crossing short and leave your tools on the platform instead of in your hand. If the damage stays within arm's reach of the deck, simply work from the tower; that is what you hired it for. Someone below keeping an eye out is no luxury.

Hire a mobile scaffold for repairing roof covering today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.