See your price
Application

Staining a carport? Choose the right scaffold.

Stain soaks into timber, and that makes staining a carport a job for thin coats and dry days. The frame usually stands in the open, the roof edge runs all the way round, and you need to see it from above. For a carport you therefore hire the MiTower, a slim tower of 75 cm that slips between the posts and gives you 4 to 6 metres of working height. Below you will read how many hire days that takes, which height to pick and where the thing stands.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For staining a carport we recommend the 1-person scaffold.
  • For staining a carport you hire the MiTower: 75 cm wide, one user, and 4 to 6 metres of working height.
  • Stain wants dry timber, so your hire period follows the forecast rather than the days you happen to have free.
  • Reckon on four to five hire days: two coats on the frame, the roof edge all round, and the waiting between.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for staining a carport?

Safe, stable and professional work at height

Staining a carport reads as low work until you reach the roof edge. The posts you can still manage from the ground, but the edge that runs round the roof wants looking at from above, or you miss the top face and the end grain, which is where timber drinks hardest. On top of that, stain does not lie on the wood but sinks into it. You work wet on wet, in one unbroken pass along the full length of a beam, and that only comes off if you are standing steady and can slide sideways. Hiring a scaffold for staining a carport therefore means a fixed floor at height, and enough hire days to wait out the weather.

  • Roof edge runs all round, so work from above
  • Stain sinks in, thin coats and wet on wet
  • Working height 4 to 6 metres to the edge
  • Four to five hire days for drying and weather
Read more about working safely →

Hiring a MiTower for staining a carport: narrow between the posts

A carport is a structure of posts and beams, and between those posts the room is tight. Altrex builds the MiTower 75 cm across and for a single user, and that dimension is what carries you past a parked car, between a post and the side wall of the garage, and through the gap where the front bumper normally sits. Wider models get stuck there. What comes with this model is set out at the MiTower on hire.

The range starts at 4.2 metres and stops at 6.2 metres of working height, and a carport sits comfortably inside that. You are not going far up, but you do want to come out above the roof edge, and that is exactly the strip a pair of steps falls short of. The weight helps too. One person can wheel this tower, and on a carport you move it constantly, since every bay between two posts asks for its own position.

Tower built up against a front elevation at the level a carport roof edge is normally worked from

The trade off is room on the platform. One person fits, with a tin of stain, a brush and a rag, and nothing more. If two of you are working, or a sander and an extension lead have to be up there too, it is worth looking at a longer floor of 245 cm. For an average carport that is more than the job needs; for a double carport with a long roof edge it can pay. The models stand together in the overview of scaffold dimensions.

Which working height to hire for a carport roof edge

On this job the highest point is rarely the beams and almost always the roof edge. On a free standing carport that edge sits at around two and a half metres; where the carport is tied to the house it climbs to three or three and a half. You also want to look over the top of it, because the upper face and the joint with the roof covering come with the job. That lands you at 4 to 6 metres of working height, and that is the range you hire.

Working height and platform height are not the same figure. Take the height of the floor you stand on and add about two metres for the reach of your arms and upper body; that sum is the working height on your booking. To get your chest above an edge at three metres you are standing at a good two, so you hire towards five. Measure from the block paving under the wheels, not from the carport floor. The build is shown on the page about 6 metres.

Slim tower alongside a wall, set at the working height a carport roof edge asks for when you stain it

Choosing too tight punishes you in one place when you stain: the top edge. Come up just short of it and you are brushing the head of the timber by feel, leaving a dry streak you only notice when it rains and the water works its way in. Half a metre of extra height costs almost nothing to hire, while a band of untreated end grain costs you a repair within two years. If in doubt, take the roomier build.

Hiring a scaffold and standing it on the carport drive

The standing spot for this job is nearly always the drive, and you share that with the car. Move it away for the whole hire period, because a car under a carport with stain dripping from above creates work nobody wants. Block paving and concrete carry the load fine; gravel and a grass verge do not, since the wheels sink in and your platform tilts while you are trying to pull a long line. Lay boards or track mats under the wheels if you are unsure.

Around the feet you need room for the stabilisers, and on a carport that is the awkward demand. On the outside it usually works, but between two posts a stabiliser meets an upright almost at once. So walk the positions through before the tin is open: stand the tower up, check all four legs are clear, and move half a metre along if they are not. If the carport sits on a falling drive, read the guidance on uneven ground.

Stabilisers folded out at the base of a tower, the footprint that has to fit between two carport posts

Think about what is underneath you as well. Stain drips, certainly when you drag a loaded brush along a beam above your head, and on block paving that leaves marks which stay for years. Put sheeting or cardboard over the strip you are working on and slide it along as you move the tower. Bikes, a trailer and the wheelie bins go somewhere else for those days, because lifting them every time costs more than the staining does.

Staining a carport: how many days to hire the tower

The staining itself moves along: an average carport has two or three sides of frame and an edge round the roof, and with a decent brush that is a day per coat. The season decides the rest. Stain wants timber that is dry right through, so after a wet week you wait until the surface takes up again, and in spring and autumn dew settles overnight on what you laid that day. That is precisely why hire days are not the same thing as working days.

Allow four to five hire days for a carport, then, even though only two of them see a brush. Between the first and the second coat sits the interval the tin prescribes, and that interval stretches itself when the air is cold or damp. Catch rain on a fresh coat and you start that face again. Anyone working in March or October plans an extra day as a matter of course; in June you often do not need it.

Tower standing against a side wall, the position from which the carport roof edge gets its two coats

Booking roomy is close to free on this job. The full tariff covers the first day and night only, and each hire day that follows costs 95 per cent less. Two days spent waiting for dry weather therefore weigh nothing against half a coat that fails. So set your end date on the day after the second coat is definitely on and dry. What a realistic period looks like is set out in this piece on the number of hire days.

Which mobile scaffold suits staining a carport?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Applying stain from the scaffold platform, one bay at a time

Work per bay between two posts and finish that bay completely before you wheel the tower on. Stain wants to go on wet in wet: you start at the top of a beam, run through in one pass to the end, and keep the edge live. Break off halfway to move the scaffold and you will see that interruption as a dark band once the timber dries. So choose your positions such that the join between two of them falls on a corner or a post.

Take up only what you actually need for each position. A tin of stain, a brush, a rag and perhaps a sanding sponge; the floor on this model is sized for one person and fills up quickly. Hang the tin on a hook rather than standing it loose on the deck, because a knocked over tin at three metres means stain on the paving, on the neighbour's car and over your own shoes. A hook costs nothing and takes that risk away.

Narrow tower built beside a modern house, the light set-up you shift bay by bay along a carport

What people misjudge is the number of positions. A carport of six metres with two open sides and an edge round the roof soon gives eight to ten moves per coat, and that times two coats. Allow a few minutes per move for releasing the brakes, resetting the stabilisers and lining the tower up square again. If opaque paintwork on the same carport follows later, count those rounds once more. You work out hire days from rounds, not from working hours.

Staining a carport: hire with delivery in a dry week

The set arrives counted and complete as loose parts: uprights, braces, a platform, the stabilisers and the wheels. Point out a place where that stack can lie for a few days without being in the way, and keep it clear of the face you are about to treat. An order placed on a weekday before 15:00 goes into the van the next working day. See four dry days in the forecast and you can therefore start in the same week.

You decide which date the set comes and which date it may go, and for stain work you look at the forecast first. Have it delivered the day before you start, so that building it does not eat into your first dry day. Building is your side of the deal: the manual and the instruction video point out the order, and with two people you are standing ready inside an hour. The piece on hiring in winter covers the cold season.

Scaffold parts laid out on grass beside a house, the counted set delivered before a week of staining

After your last day with the brush we drive out again to collect the set. Only strike it once the timber feels dry, because stain that still tacks picks up dust and grit and then you finish the day cleaning instead of dismantling. Stand all the parts complete in the spot where they were dropped. What bringing and fetching costs together depends on your province and is listed on the page for delivery and collection.

Working safely on the tower when staining bare timber

The build you hire is made to EN 1004 in load class 3, so the platform takes 200 kg for every square metre. Stain work goes nowhere near that: a five litre tin and a brush weigh nothing. The genuine limit of the model is that one person belongs on it, so do not send a helper up with you; let them pass the next tin from the ground instead. What the class means is explained in this article on loading.

The basic rules hold even on a job of a few hours. Wheels braked the moment you step on, never moved with anyone or an open tin aboard, and down you come when it starts to blow. Wind counts twice with stain: you are standing higher than the carport and catch the full gust, and the stain then flashes off so fast that you cannot brush out your starts. Stopping costs you an hour, carrying on costs you a face.

Guard rails and an integrated ladder on a tower, the way you climb to a carport frame with a brush

The hazard that belongs to this work is a slippery deck. Stain running off your brush onto the platform turns greasy within minutes, and unlike paint you can barely see it lying there. Put cardboard or an old cloth under your feet and swap it as soon as it is saturated. Keep the zone under the tower clear as well, since one toppling tin can mark a carport, a drive and a car in a single go.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for staining a carport

1

Stain the end grain of the beams first and only then the long faces. End grain drinks twice as much and asks for a second pass, and from the platform you are already within reach of it.

2

Judge the moisture with your hand: if the top of the roof edge still feels cool and dark after a shower, leave the stain a day and spend that hire day sanding instead.

3

Follow the shade round the carport, working the shaded side in the morning and the sunny side later. Stain laid on in full sun pulls away too fast and leaves streaks along the long beams.

4

Put a strip of tape on the post where your position ended. After a shower or a night of waiting you set the tower back on exactly that spot and the two passes meet without a mark.

5

Take a short handled brush up for the top face of the roof edge. A long handle does reach the edge from the platform, but you can no longer see how much stain you are spreading.

6

Book your collection day two days after the final coat. That leaves you time to walk round and check for a dull patch that still wants a pass before the tower goes away.

Frequently asked questions

Frequently asked questions about staining a carport

Which scaffold do you hire for staining a carport?+

The MiTower: 75 cm wide and made for a single user. On a carport you work between posts and past a car or a side wall, and every centimetre of width counts there. The reach of 4 to 6 metres is also just enough to look over the roof edge without putting up a heavy build. If two of you are working, or sanding is part of the job, hire a mobile scaffold of the wider sort instead.

How does hiring a scaffold for carport stain work go?+

You book online on model and height, with a delivery date and a collection date you choose yourself and a fixed price including VAT. We bring the tower to your drive as loose parts, you assemble it, stain the frame and the roof edge in two coats, and take it down at the end. On the day you picked we carry everything away again. The only thing you have to plan tightly is the weather around those days.

How many days do I need to hire to stain a carport?+

Four to five days is realistic. Two of them go on brushwork, one per coat, but in between the first coat has to sink away, and in spring that is slower than in high summer. If rain falls on your hire days everything shifts and the tower stands idle for one of them. Book tight and you reach the collection day with a single coat on the timber, which with stain is barely better than none.

What will hiring a scaffold cost me for a carport in stain?+

The tariff follows from the model and the height you hire, with the journey out and back added on, which costs a fixed amount per province; the whole rental price is listed including VAT on the prices page. For stain work the shape of it is the useful part: the first day counts in full and the days after it hardly at all. That lets you build in a couple of spare days for weather that disappoints.

Which working height should I hire for my carport roof edge?+

Measure from the paving where the wheels will stand to the top of the roof edge, and that is the point you have to reach; the platform of the tower sits well below it. On a free standing carport you usually hire 4 metres of working height, on one tied to the house more like 5 or 6. Unsure, look up the matching build on the working heights page and take the taller one.

Do you have the scaffold delivered or collect it yourself when you hire?+

Either works. With delivery the parts stand on the drive on the morning you chose and we drive them away after your final day of staining; bringing and fetching together cost a fixed amount per province. Driving yourself is allowed too: by appointment we load the set free of charge at Zeeburgerpad 89 in Amsterdam. On a job of four or five days most people still pick delivery of the tower.

Is assembly part of the hire, or do I put the scaffold up myself?+

Putting it up is down to you. At the height a carport asks for, two people stand this tower up in about an hour, and striking it goes quicker. Plan that half day separately, because the build day rarely leaves enough light to start with a brush as well. We do not let out facade scaffolds or cherry pickers, so for work on a carport edge a narrow mobile scaffold is the obvious tool. System scaffolds are not in the fleet either.

Can I hire for longer if rain drags the stain work out?+

Yes. Let us know in good time and we shift the collection date, unless that tower is already promised to somebody else. With stain, overrunning is the rule rather than the exception, since you depend entirely on dry timber and dry air. So reserve a day or two extra from the start; handing back early is fine and costs you nothing. That way you never skip a second coat because the van is at the door.

How much clear space does the hired tower need around a carport?+

Allow the width of the build plus the spread of the stabilisers, and bear in mind that on a carport you are standing between the posts. On the drive a clear strip of two by three metres is enough, but inside the frame an upright can force you half a metre along. Move the car, the bikes and the bins out before the scaffold arrives. Then nothing has to be shifted once you are working.

What do I do if the weather turns during my hire period?+

Leave the tower standing and put the day to another use. Stain will not go on wet timber, but sanding, degreasing, dusting down and masking the gutter all will, and that saves you half a day later. As soon as the wood feels dry again you pick up the brush where you left it. Because you set the end of your own hire, a turn in the weather costs you one extra day at most.

What happens to the deposit once the scaffold hire ends?+

A deposit is settled when you book the hire; once the returned set has been counted through, it is credited back inside a single working day. Stain work adds one point of attention: leave no dried stain on the platforms or the tubes. A cloth and a little water kept beside you while you work will stop you scrubbing tubes on collection day. There is more in the guidance on striking and handing back.

Can I stain the shed or the fence in the same hire period?+

That is often the smartest planning. With the tower already there you roll it to another face in a couple of minutes, so take the shed, or the top of a tall fence, along in the same hire days. You then pay once for bringing and fetching and get the benefit of the cheap follow on days. Do allow for extra drying time if you are putting two coats on more faces than you first counted.

Hire a mobile scaffold for staining a carport today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.