Hanging an outdoor light? Choose the right scaffold.

Hanging an outdoor light is a couple of hours of work at one fixed point on the wall: beside the front door, above the back door or under the overhang. A hole has to be drilled, a lead taken through and a connection made that stays watertight, and none of that works one handed from a ladder. For that single point you take the RS51: 75 cm narrow, with a reach that comes out at 6 to 8 metres. Below you read how to pick that setup and how short the hire period stays.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For hanging an outdoor light we recommend the Narrow mobile scaffold.
  • For one outdoor light on the wall the RS51 of 75 cm is enough, with a working height between 6 and 8 metres.
  • It concerns a single fixing point, so you set the tower down once and do not move it again during the job.
  • One hire day is usually plenty, because building and dismantling together take longer than hanging the light fitting itself does.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for hanging an outdoor light?

Safe, stable and professional work at height

On this job you need both hands up there. You hold a drill with a long masonry bit level against the wall, you pull a cable through the sleeve and after that the fitting hangs on one screw while you look for the second. On a ladder that means leaning, knee against the rung and tools in your trouser pocket. Hiring a mobile scaffold to hang an outdoor light gives you a flat deck where drill, screws and gland lie beside you, with a guard rail all round. That it is only one light does not make the work less exact, only shorter. You hire a tower here not to stand on it long, but to stand well for two hours.

  • One fixing point, so one fixed setup
  • Both hands needed for drilling and wiring
  • Fixing point at 6 to 8 metres
  • Short hire period, often a single day
Read more about working safely →

Which mobile scaffold to hire for hanging an outdoor light

For one fitting on the wall the RS51 is more than enough: 75 cm wide, light to build and small enough to sit right beside a front door or in a narrow side garden. Little goes up with a light, so deck area is not the bottleneck here; the clear space on the ground is, because at a wall there are usually borders, wheelie bins and a bike rack. Which versions stand ready is on the page about mobile scaffold hire.

The wide 135 cm version adds nothing to this job. A drill, a box of screws, a tube of sealant and the fitting itself go on any working deck, and the extra width only makes the tower heavier to shift alone. If the fixing point is wedged between a bay window and a downpipe as well, the narrow model is the only one that stands square in front of it without you reaching sideways to the hole.

Narrow 75 cm mobile scaffold standing tight against a wall, the single setup you place for one fixing point

If the point stays under about six metres and you really are on your own, the MiTower is worth weighing up: 75 cm wide and made for one person. Above that height it will not do and you take the RS51. Ask somebody along for the build in any case, even if you fit the light alone afterwards; handing up platforms and braces is simply safer with two. What the one person tower manages is at the MiTower available to hire.

What working height to hire up to the light fixing point

The highest point of this job is not the roof edge but the hole where the light comes to hang, usually about two and a half metres above the door or just under the overhang. On a house with one storey that puts you at 6 to 8 metres of working height, roomy enough to work above it in comfort and to take in a second point under the overhang. Which sections that takes is listed on the page for a build reaching eight metres.

You want to stand with your waist at the level of the hole, not your shoulders. Drilling goes best when you push straight forward rather than upward, and with a masonry bit of thirty centimetres that saves a great deal of force. So count half a metre back from the hole for the level of your deck, then add the roughly two metres of reach to arrive at the working height you enter when booking.

Mobile scaffold assembled against the front elevation of a house, at the height where a light fitting is mounted

Choose too low and you stand exactly wrong: drilling above your head, grit in your eyes and a hole running crooked into the brickwork. The fitting then hangs just off level, and you see that from the pavement straight away, every evening again. Hiring half a metre higher costs almost nothing and solves it. If the light sits on the storey rather than above the front door, look at the build for the first floor.

Hire a mobile scaffold and get the one position right

Because you have only one point, nothing needs moving, but that single standing position has to be right first time. Put the tower square in front of the fixing point and not beside it, so you can reach the hole from the middle of the deck without twisting. Measure that before you start building, because half a metre too far to the left means working at an angle all job and pushing the drill sideways into the wall.

The ground beside a front door is usually a path of slabs or block paving, and that is fine. Watch mainly what stands around it: a border with planting, a low wall, a bike rack, the bins and the gully of the downpipe. All four stabilisers point outwards at an angle and each claims its own piece of ground, so clear those things away before the tower goes up. A foot resting half on a border does not stand firm enough to drill from.

Stabilisers angled outwards under a mobile scaffold, the clear ground you make free around a front door

Think about the door underneath as well. With the setup directly in front of the front door it cannot open during the job, and you notice that only when somebody wants out with a bag of shopping. Better to put the tower half a metre aside and work from the edge of the deck, or use the back door that day. How to deal with a path falling towards the street is at setting up on uneven ground.

How many days to hire a scaffold for one outdoor light

The fitting work itself is short. Drilling the hole, making the sleeve, pulling the cable through, wiring it up, fixing the fitting and sealing the sleeve together take about two hours. What fills the day is everything around it: isolating the circuit, making the connection indoors, raising the tower and taking it apart again at the end. So you book one hire day for a job that in working time does not even fill a morning, and that is precisely why the hire period on an outdoor light stays this short.

Even so it regularly goes otherwise. The bit meets a lintel or a wall tie, the existing wiring turns out not to match, or the cable will not go through the cavity because insulation is in the way. Those are exactly the things you only see with your nose against them. If you suspect that chasing has to be done indoors as well, one day is tight and you book two straight away rather than finding out at four in the afternoon.

Assembled mobile scaffold with guard rails and a working deck, the setup that stands there for a single hire day

That can be done without much objection, because a full day rate is charged once, at the start, and each following hire day comes with 95 per cent off. A spare day therefore costs you little, and you do not have to stop with an outdoor light half hung because the van is already outside. Set the collection date a day further when in doubt. What a longer period means for planning is in the explanation of hire days.

Which mobile scaffold suits hanging an outdoor light?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Fitting the outdoor light from a single 245 cm scaffold deck

The deck is 245 cm long, and on this job that is not working width but room to move. There is the hole for the light, perhaps a sleeve some way to the side and an existing junction box that sits just off the same line; over that length you reach all three without moving the tower. Put your tools at one end and keep the other half clear for where you drill, so you never step over a bag while looking up.

Take everything up in one go. Drill, masonry bit, screwdriver, spirit level, box of plugs, cable gland, sealant gun, the fitting and the cable: lay that row out on the ground and only then climb. Every forgotten screw means down and up again, and on a job of two hours that is soon a quarter of your time. A bucket with a hook on the guard rail keeps the small parts together and stops anything rolling off the edge.

Mobile scaffold assembled against a brick wall, the 245 cm platform over which three fixing points lie side by side

Take the circuit off before you touch the existing wiring and check that up there with a voltage tester; height is no place for surprises. Work in a fixed order after that: first drill the sleeve on a slight upward slant from outside so no water runs in, then feed the cable, then fix the fitting and only then seal the edge. That way you never have to come back to anything. If a switch or sensor belongs to it, see fitting a movement sensor.

Rent a mobile scaffold with delivery for a one day job

With a short hire period the timing of the delivery matters more than with a long one. The set comes as loose, counted parts and they have to lie somewhere: at a front door that is often a narrow strip of pavement, so agree where the driver puts them down. Get the booking in on a working day before 15:00 and everything travels out on the next working day, which leaves you a full morning to start on.

Both dates, the one for bringing and the one for fetching, are yours to name, and on a single day job you want them tight together: dropped off the day before your free day, taken away the day after. Raising it falls under your own work, with the printed manual and the instruction film at your elbow. Reckon on about two hours with two people, so ask someone round for that morning even if you hang the light alone afterwards.

Scaffold parts laid out beside a front door, exactly the narrow strip on which a hired set is dropped

Afterwards we come for the mobile scaffold, and you make sure it is dismantled and lying complete somewhere the van can reach. On a short hire that is quickly done: taking it apart goes faster than putting it up. Count the parts through as you go, because a single coupler that ends up in the hedge will show up at the check afterwards. What bringing and fetching costs to your province is at the rates for delivery and collection.

Hanging an outdoor light safely from a tower above a door

The deck is rated for 200 kg per square metre, which within EN 1004 is called load class 3. With one light and some tools you are nowhere near that, so weight is not the issue here; stability is. So always set all four stabilisers out, even though you stand up there for only two hours and the tower seems solid without them. What the standard settles exactly is in the explanation of this scaffold standard.

The wheels go on the brake before you step on, and you never move the tower with tools or with somebody on it. If it is blowing hard, put the drilling off: you push with force against the wall and that sits badly with a tower that is shivering. Coming to the wiring, the circuit is off and you check that up there once more, not only below at the consumer unit. A voltage tester in your breast pocket weighs nothing.

Scaffold parts on the footway in front of a house, taking up the same pavement you close off when working overhead

What counts above all on this job is that you work directly over a walkway. At a front door the post, the parcel courier or a neighbour walks under you while you are into the brickwork and grit is coming down. Put a cone or a bike out as a barrier, never lay tools loose on the edge of the deck and tell the household to keep clear for a while. The further rules are at working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for hanging an outdoor light

1

Mark the drill hole before you build. From the ground, with a laser measure or from across the street, you judge far better whether the light comes at the same height as the fitting on the other side.

2

Always drill the through hole rising slightly towards the inside face. Rainwater creeping along the cable then finds its way back out by itself instead of dripping into the cavity behind your brickwork.

3

Lay the cable ready to the inside before you build and leave a generous loop. Come up half a metre short at the top and you may descend, switch the circuit off again and redo the whole thing indoors.

4

Hang a bucket with a strong hook on the guard rail for plugs, screws and the gland. Small items that roll off a working deck at seven metres are simply not found again in the border below.

5

Connect the fitting and test it before you screw it finally to the wall. If the connection turns out dead once everything is fixed and sealed up, the whole job begins again from the start.

6

Set the tower so that you can still open the door underneath. Slipping out the back way all day because your setup blocks the front door wears thin far quicker than you would think.

Frequently asked questions

Frequently asked questions about hanging an outdoor light

Which mobile scaffold should I hire to hang an outdoor light?+

The RS51 of 75 cm is the logical choice for this job. You need little room up top, but you do need a narrow base that fits between a border, a bike rack or a bay window. Hiring the wide version brings no advantage here and only makes the carrying heavier. If the fixing point stays under six metres and you work alone, the one person tower is worth a look, though it will not reach a high roof edge.

How does hiring a mobile scaffold work for such a small job?+

Exactly as it does for a big one: you hire a mobile scaffold online by picking a model and a working height, naming a delivery day and a collection day and paying a fixed amount including VAT in advance. There is no minimum period of a week; one day is perfectly normal. The set comes to your home, you build it, hang the light and take it down again, and it is fetched on your chosen date.

How many days must I hire a tower for one outdoor light?+

In most cases a single hire day is enough. Fitting the light takes about two hours, and putting the mobile scaffold up and taking it apart together cost you roughly the same again. If you are unsure about the wiring, or chasing has to be done indoors, book two days at once. That costs little extra and spares you the feeling of rushing with a light half attached to the wall.

What does it cost to hire for one day, and what if it becomes two?+

Two things set the amount: which scaffold model and reach you pick, and the fixed provincial charge for bringing and fetching. The rental price including VAT for each of those sits on the page with rates, so the whole sum is visible before you confirm. For one light, a single day of scaffold hire is a perfectly normal order rather than an exception, and a second day is added in the same booking screen.

What working height do you hire for a light beside the front door?+

Measure to the point where the fitting comes to hang and not to the gutter or the roof edge above it. On an ordinary family house that brings you to 6 to 8 metres of working height. If you would rather stand with your waist at the hole, count another half metre in when picking your build. That is precisely the difference between comfortable drilling and pushing above your head. The page with working heights shows which scaffold suits each height.

Must I fetch the hired scaffold or does it come to me?+

Both routes are open, and on a one day job the difference is mainly time. With delivery the hired scaffold lies ready on the agreed morning and goes away the day after. Prefer to drive yourself and you fetch it free by appointment at Zeeburgerpad in Amsterdam. Reckon then on two journeys with a trailer that takes the complete set, which is a lot of bother for one light. Most people simply have it delivered.

Do you put the mobile scaffold up as part of the hire?+

Building is your own work, even on a short job like this. We drop off the parts of the mobile scaffold and you raise it following the manual and the instruction video. Do it with two people, because carrying platforms and braces on your own is awkward, even if you hang the outdoor light alone afterwards. So ask somebody round for that morning and you are on the deck within two hours.

Can I hire the scaffold longer if the wiring disappoints?+

Yes, let us know and the collection day moves along, provided the set is not already standing by for the next hirer. With an outdoor light that is no rarity: a bit striking a lintel, or insulation in the cavity, throws your planning over at once. So reserve a day extra when hiring, because you decide yourself how long the tower stays there and handing it back early is allowed.

How much clear space does the setup beside a front door need?+

Reckon on the footprint of the hired tower, with the room the four stabilisers claim around it, and remember you need that area at exactly the spot where all sorts of things stand at a front door. Borders, wheelie bins, a bike rack and the doormat therefore come away first. Clear that before you have the scaffold delivered, and not at the moment the parts are already waiting on the pavement.

Can I keep working if it rains on my hire day?+

Drilling and screwing carry on fine in the rain, but an electrical connection is better made dry, and sealant bonds poorly on a wet surface. With persistent rain you therefore push the wiring a day on; the mobile scaffold simply stays standing. If it blows hard you stop in any case, because you are pushing with force against the wall. An extra hire day costs so little that waiting beats pressing on.

How does the deposit work when hiring for such a short period?+

The deposit is the same whether you keep the scaffold one day or two weeks. You settle it at the reservation, and the money returns to you one working day after the set comes back and is counted complete. Watch on this job for small parts vanishing into a border or under a hedge while you dismantle; those cost more than the hire day itself. More is in the piece on the deposit.

Can I replace the light at the back on the same hire day?+

That is possible, but you then move the setup, and that is exactly where the time goes. With a tower at this height dismantling is often unavoidable to get round the back through a gate or a narrow path. If more fittings are on your list, count on at least one extra hire day, because each new point means dismantling, walking the parts round and building again. How a whole round works out is at installing outdoor lighting at several points.

Hire a mobile scaffold for hanging an outdoor light today?

Calculate your rental price now or ask for free advice.