See your price
Application

Cleaning fascia boards? Choose the right scaffold.

Cleaning fascia boards is wet work on the highest edge of the house, and all that water has to go somewhere. Everything you brush off the roof edge comes down with the dirty stream: over the wall, over your set up and right under the wheels. This job is therefore as much about where you stand as about what you do up top. Here you hire the RS52: 135 cm of deck width, built up to eight or twelve metres. Below you read how to keep that position dry and stable.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For cleaning fascia boards we recommend the Wide mobile scaffold.
  • For cleaning fascia boards you hire the RS52 with a 135 cm deck and eight to twelve metres of working height.
  • All the dirty water runs down, so pick a standing place where the ground under your wheels will not saturate.
  • Reckon on one to two rental days for the cleaning itself, plus drying time when the timber gets a treatment afterwards.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for cleaning fascia boards?

Safe, stable and professional work at height

When you clean fascia boards you work above your head with a wet brush, which means everything that comes loose runs down your arms. You need both hands, you push hard against the edge and you have to stand firm while doing it without wobbling. A ladder is unfit for that: it leans, it slides away on a wet surface and you cannot shuffle sideways along the roof edge with it. Hiring a mobile scaffold to clean fascia boards gives you a flat deck with rails around it, where the bucket can stand beside you and you push with both hands without leaning on anything.

  • Dirty water runs over wall and scaffold
  • Both hands needed on the wet brush
  • Roof edge eight to twelve metres up
  • Ground under the feet becomes soaked through
Read more about working safely →

Which mobile scaffold to hire for cleaning fascia boards

Take the RS52, the wide mobile scaffold with a deck width of 135 cm. The reason here is thoroughly practical: on wet work all sorts of things stand on your deck that you do not want to kick over. A bucket of suds, a second bucket of clean water, a bottle of cleaner, two brushes with different handles and a cloth. On a narrow deck you shuffle that about all day. The widths are at the mobile scaffolds you can hire.

Work with a low pressure washer or a garden hose and a hose joins all that, running up from below. It has to go somewhere without lying between your feet or snagging behind a rail post when you pull it towards you. That argues for the wider deck as well. Lay the hose down over the rail in a generous curve, so there is slack in it and it does not pull tight against an upright.

Wide model parts leaning by a house front, the 135 cm build delivered in pieces to your pavement

A tower 75 cm wide only comes into the picture where the wide version will not pass a gate, an alley or a narrow garden path. So measure that tightest opening before you commit, and mind a low canopy on the way as well. Room scaffolds are out anyway: they are meant for indoors, up to about four metres, not for a dripping roof edge ten metres up. Between two models, compare the size overview.

Working height to hire to clean above the gutter

On this job the highest point sits above the gutter: the fascia board usually passes behind it up to the roof trim, and it is on that top edge that the thickest layer of green growth sits. You have to get your brush over it, not just up against it. With two or three storeys under it, you land on eight to twelve metres of working height. Add close to two metres of reach to your deck height and you know which build to order.

The zero point of your measurement lies under the wheels, not on the doorstep. That often makes more difference than people think, because a drive falls away to the road and at the back the terrace sometimes sits a step higher. Working round the house, write down a figure per side and book on the largest of them, because dropping a build down is quickly done. What a roof edge at this height involves you see at work on the second floor.

Mobile scaffold standing to gutter level at the front of a house, where growth builds up on fascia boards

A build that is too low goes wrong in its own way on this work. Stand under the edge and you brush upwards, and all the dirty water runs down your brush into your sleeve. You also cannot see the top and leave exactly the spot where the moss holds on. So choose a build that puts the edge at eye level or just under it. On the page about working height you find per height how much build belongs to it.

Hiring a scaffold and standing it on ground that gets wet

This is where this job differs from every other one at the roof edge. Everything you rinse down ends up in the strip your position stands on. Brick paving and slabs cope with that perfectly well. Grass, half made up ground, a gravel path with sand under it and a border certainly do not: within an hour they go so soft that a wheel or a stabiliser sinks slowly while you scrub ten metres higher and notice nothing at all.

So put the tower on paving by preference, and where that is impossible, lay a firm board under every wheel and under every stabiliser to spread the load. Walk round the position every hour, because settling is gradual and you only notice it when you start standing out of true up top. Look too at where the water finally runs: a gully or a drain nearby saves you a puddle under your own feet. More at working on an uneven surface.

Stabilisers projecting outwards under a mobile scaffold, the footing points that can sink away into wet ground

Think further about what stands in the splash zone. Windows, frames, a shed door, a parked car, the neighbours' washing and garden furniture all catch dirty water once you start brushing. Move those things away or cover them before the position is built, because once the tower stands you no longer get between them easily. Warn the neighbours where you share a boundary, since dirty water going over a fence lands on their terrace just as hard as on yours.

How many days to hire for cleaning the roof edge

Cleaning goes faster than painting, but not as fast as it sounds. Per position, soaping, letting it work, brushing and rinsing off take half an hour to an hour together, and with a good two metres of roof edge at a time that adds up to a full day on a terraced house. Where the fascia board runs round the whole house, reckon on two days of hire. Thick moss or a black film brings a second round with it.

More important than the cleaning time is what comes after it. If you want to treat the timber afterwards, it first has to dry back completely, and with solid fascia board timber that takes longer than an afternoon. Plan that drying time inside the same rental period instead of taking the tower down and building it again later. Cleaning and treating in one unbroken booking saves you a second delivery, a second building day and measuring out all your positions again.

Assembled mobile scaffold left standing along a side wall while the cleaned timber dries back out again

The way the rate is built up helps with that. After the first 24 hours, 95% comes off the day rate for every extra rental day, so taking a few drying days along costs little next to starting over. Put your collection date behind the drying period and not right after your last bucket of suds. If things go differently you simply hand the tower back early. More on that trade off is at judging the number of rental days.

Which mobile scaffold suits cleaning fascia boards?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Cleaning fascia boards from top to bottom per position

A deck of 245 cm gives you about two and a half metres of roof edge per position, and within that stretch you always work from high to low. The top edge against the roof trim comes first, then the face, and only last whatever sits below it and at the ends. Reverse that order and the dirt from above washes over timber that was just clean, and you start again. Rinse each piece before the product can dry on.

Take everything up in one go: two buckets, your brushes, the product and a cloth. On wet work climbing down to fetch something is extra unpleasant, because you stand on the rungs with wet hands and wet soles. Do not work further than you can comfortably reach, either. The temptation to take that last half metre by hanging over the rail is strong at a roof edge, and that is exactly where it goes wrong.

Assembled mobile scaffold with rails all round, its working deck offering room for buckets and brushes while cleaning

You move with an empty, swept deck. Tip the buckets out, set them below, wipe the platform, release the brakes and wheel to the next stretch. Do not take a full bucket along while wheeling, because water sloshes and shifts weight at the moment the stabilisers are folded in and the tower stands least forgiving. Hoisting a bucket up costs less time than straightening a position. If a coat of stain follows on the timber, see staining fascia boards.

Scaffold hire with delivery on a day without rain

The tower arrives as a counted stack of loose parts, and on wet work you do not want that stack lying in the mud. Point out a place on paving or under a canopy beforehand, because tubes that spend days in a wet border become heavy and slippery to handle. An order that comes in on a working day ahead of 15:00 is loaded for the following working day. A couple of battens under the stack keeps it clear of standing water.

You fill in yourself when the parts arrive and when they may go again. Look at the forecast while you do, but differently from painting: for cleaning it need not be bone dry, you only do not want to build in pouring rain. So set the delivery a day before your cleaning day. Standing it up is your job, with the instruction from the box and the film that demonstrates the order. We do not come to build, nor do we deliver a standing tower.

Steigertaxi delivery van loaded with scaffold material, ready to drop the hired set on the agreed day

As soon as the timber is clean and dry again, we come to take the parts away. Break the mobile scaffold down, wipe the platforms clean and lay the parts together at a point reachable from the road, so not behind a shut gate. Count the parts as you dismantle, because a clamp that ends up among wet cloths only turns up once the van has gone. The amounts per province are at what delivery costs.

Working safely on a wet and slippery scaffold deck

Under your feet lies a deck classed within EN 1004 as load class 3, which allows 200 kg on each square metre. That sounds like a lot, but on wet work it mounts up: two buckets of water already weigh a fair amount together, and with two of you up there a second person with his own kit joins them. So spread the weight over the platform and do not put everything in one corner. More at weight and loading on a mobile scaffold.

The real risk of this job is the deck itself. Water with green growth and soap in it makes a platform treacherous, and you find that out only when you take a step backwards. So wipe your deck every time you move, wear shoes with a coarse tread and set your buckets down so that you need not step around them. Never climb up with a bucket in your hand; hoist it up separately instead.

Mobile scaffold with an internal climb and rails all round, the safe way up on wet and slippery cleaning work

Beyond that the standing rules apply, and on wet work they are no formality. Brake the wheels before you climb on, move the tower only when empty, and stop as soon as it begins to blow, because wet hands and wind go badly together. Never aim a low pressure washer at yourself or at the rail: the recoil pushes you backwards. Keep the ground under the mobile scaffold clear of people and pets, because a falling bucket gathers real speed.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for cleaning fascia boards

1

Flush the gutter out before you start on the fascia boards. Leaf and moss that you brush off the edge otherwise washes into the gutter anyway and runs back out at the first shower.

2

Work in cloudy weather, or take the sunny side in the early morning. A cleaning product that dries in full sun before you can rinse it off leaves pale patches on fascia boards.

3

Lay a towel or a piece of rubber matting on the deck where you stand. That saves you a treacherous patch exactly where you shift your weight the whole day long.

4

Fill your buckets up top with a hose rather than carrying them up the ladder full. Two buckets of water is the most needless climb you can make in a single day.

5

Check for soft spots in the timber straight after cleaning. Now that you are up there anyway it takes five minutes, and it decides whether you need the hired tower another day.

6

Put your last position beside a drain if you can. Then you rinse your buckets, brushes and the platform off at the end of the day without leaving a puddle in the garden.

Frequently asked questions

Frequently asked questions about cleaning fascia boards

Which mobile scaffold is best to hire for cleaning fascia boards?+

For this work you hire the wide RS52, built up to eight to twelve metres of working height. On wet work two buckets, a bottle of product, brushes and sometimes a hose stand on the deck of the mobile scaffold, and you want them beside you rather than between your feet. On a wet platform every sideways shuffle is a risk. Where that width will not pass a gate or a path, you hire the narrow 75 cm version.

How does hiring a scaffold for this cleaning job actually work?+

Online you choose model and build height, after which the price including VAT appears and you enter the date for delivery and the date for collection yourself. We set the counted parts down at your address, you erect the tower, clean the roof edge and break it down again once the timber has dried back. On the day you gave we load it all up again. More practical points about hiring are at the common questions.

For how many days should I hire the mobile scaffold for this cleaning work?+

On a terraced house you hire a mobile scaffold for one day of cleaning, and for two where the roof edge runs all the way round. Per position of a good two metres, soaping, letting it work, brushing and rinsing take half an hour to an hour. Heavy black growth needs a second round. If you want to treat the timber afterwards, keep the tower on so it can dry back within the same period.

What does hire cost for this job and how does the discount rule work?+

The rental price depends on your model choice and on the build you need; per province there is also a fixed amount for delivery and collection. What each model costs per day is on the page with prices, VAT included. On cleaning that structure is favourable: the first day is the heaviest item and the days after it barely count. Keeping the tower on to let the timber dry back therefore costs far less than a second booking.

Which working height should I hire to get above the gutter?+

With two to three storeys, reckon on eight to twelve metres. You measure from the point where the wheels of the mobile scaffold will stand to just over the top of the fascia board, because it carries on behind the gutter and the thickest growth sits there. Measure per elevation where the ground around your house differs. If in doubt, hire a build one step higher, so you look down on the edge instead of up at it.

Can I have the scaffold delivered, or is it handier to fetch it when hiring?+

Both are possible. Have the mobile scaffold delivered and everything is there on the date you gave when booking, and we take it away again afterwards, for an amount that is fixed per province. If you would rather drive, it all lies ready by appointment at no charge at Zeeburgerpad. On a job lasting only a day or two most people choose delivery: you want those hours at the roof edge, not on loading and unloading.

Must I build the mobile scaffold myself, or is that part of the hire?+

That part is yours. What we deliver is a counted stack of loose parts, and what we collect is that same stack; putting it up, shuffling it along the roof edge and taking it apart afterwards are on your list. A printed instruction comes with it and there is a film to follow online. Keep a half day at the start free for erecting, and set the buckets out only after that. Cherry pickers, facade scaffolds and system scaffolds we do not supply.

Can the scaffold stay on hire if cleaning takes more days than expected?+

Pass it on as soon as you notice, and we set the collection day later, provided the mobile scaffold is not already standing ready for somebody else. On cleaning it mainly runs over because the growth turns out thicker than it looked from below, or because the timber needs longer to dry back. So book an extra day when in doubt: handing back early is always allowed. Then you never stop with a half cleaned roof edge.

How much free space must there be where you want to stand and hire the scaffold?+

Count on the width of the mobile scaffold with the splay of the four stabilisers on either side, so a strip of a couple of metres along the wall. On this job the splash zone counts on top of that: anything within a few metres catches dirty water. Move garden furniture, bicycles and the car away before the hired parts arrive, because squeezing past an assembled tower no longer works.

Does it matter if it rains on the days I hire the mobile scaffold?+

For the cleaning itself a shower is no disaster; you are working with water anyway. More of a nuisance is that the ground under your position gets wetter still and that the deck you stand on is slipperier than usual. In a steady downpour you therefore stop, even though the work could technically continue. Since the collection date of the hired tower is yours to set, shifting a day like that gives little trouble.

What happens to the deposit if the hired set goes back wet?+

A deposit comes alongside the rental sum when you book. Once the scaffold set has been collected and counted, that amount is back with you within one working day. On wet work it is the counting where it usually goes wrong: small clamps and pins vanish among soaked cloths, buckets and mops. Wipe the platforms before you start dismantling and lay all loose parts on one pile. The details are at getting the deposit back.

May I use a pressure washer on the fascia boards from the tower?+

Do that with judgement, even though the mobile scaffold stands firmly. A hard jet blows water behind the fascia board and under the roof tiles, and the recoil pushes you backwards on a deck that is slippery already. Working with a garden hose, a brush and some patience gives a better result on old timber. If you do use a washer, keep it on low pressure and never aim upwards along the rail you hold on to.

Hire a mobile scaffold for cleaning fascia boards today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.