See your price
Application

Staining fascia boards? Choose the right scaffold.

Staining fascia boards is long, straight work in an awkward spot: a tight band of timber running round the whole roof, just behind the gutter, that you can only reach at height. Stain does not sit on the surface as a film but sinks into the grain, so how dry the timber is governs your result and your planning alike. For this job you hire the RS52, the mobile scaffold with a 135 cm deck reaching eight to twelve metres. Below you read what that means for your rental days.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For staining fascia boards we recommend the Wide mobile scaffold.
  • For staining fascia boards you hire the wide RS52 at 135 cm, with a working height between eight and twelve metres.
  • You work lengthways along the roof edge, so the tower moves far more often than on a flat piece of wall.
  • How dry and how weathered the timber is decides the number of coats, and with it your number of rental days.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for staining fascia boards?

Safe, stable and professional work at height

Stain drops into the fibre and does not stand on the timber as a film. That is why every interruption shows: where you stop and start again later a darker overlap appears that will not come out once it has dried. You therefore want to pull one fascia board through from corner to corner in a single pass, and that only works if you can stand steady and move sideways with the tin within reach. On a ladder you are at a different point and a different angle every time. Hiring a mobile scaffold to stain fascia boards is about two things: working without breaks, and having dry days back to back.

  • Long straight band of timber behind the gutter
  • Stain soaks in, overlaps stay visible afterwards
  • Roof edge sits at eight to twelve metres
  • You need dry days one after another
Read more about working safely →

Which mobile scaffold to hire for staining fascia boards

For this job take the Altrex RS52, with its deck 135 cm wide. Staining fascia boards is work in which you look upwards almost the whole time and sweep along the edge with your arm out, and then you do not want the guard rail against your heels. On the wide deck your tin stands beside you rather than between your feet, and you step sideways without moving anything first. The range of mobile scaffolds to hire shows the widths together.

What has to travel up is modest on stain work, yet a little more than people reckon: a tin with a lid, a wide brush, a narrow brush for the seam between fascia board and gutter, abrasive paper or a scraper for loose fibre, a cloth and tape. Anything you leave below costs a climb of ten metres there and back, and on an edge that circles the whole house that goes wrong a few times a day.

Assembled mobile scaffold with a roomy deck and guard rails, the set up on which a tin of stain stands beside you

You hire the narrow 75 cm version here only when the way through to your back garden truly allows nothing else. Measure that tightest point before you commit to anything, because a gate of 80 cm forces the choice for you. If the wide tower passes everywhere, take it: on long work along a roof edge, deck room wins over nimbleness. A tight passage decides more here than any specification sheet does. In doubt about sizes, look at the dimensions per model.

Working height to hire to clear the fascia board top edge

The point you have to reach is the top edge of the fascia board, and it sits higher than the gutter: the board usually runs on behind and above it up against the roof trim. If you stain the end grain and the top as well, you have to be able to look over it. On a house of two or three storeys you arrive at eight to twelve metres that way. On top of your deck height, count roughly two more metres of reach.

Your tape starts on the paving or garden where the wheels come to rest, and not on the threshold. Round a house that often differs per side: on the street front everything is flat, at the back the terrace falls away towards the fence. Measure per elevation and hold the highest of the four results when you book your build. What build you need for a roof edge at this height you see at working on the second floor.

Mobile scaffold standing to the top of a house front, exactly where fascia boards continue behind the gutter line

Choosing tight punishes you at once with stain. Stand too low and you cannot see the top edge, so you work by feel, saturating one board and leaving the next half dry. On top of that, stain applied from underneath runs down your brush and into your sleeve. So hire a build that puts the top edge of the fascia board at eye level or just below. The heights in a row are on the page with working heights.

Hiring a mobile scaffold and moving it round the roof edge

Unlike a flat piece of wall, your tower never stands still for long on this job. You are in effect laying out a route round the house: along the front, round the corner, past the side and out to the back of the garden. Pace that route with a tape before you order anything, and mind the corners above all. An extension, a bay or a low outbuilding decides whether the build turns the corner in one piece or has to come down in between.

The ground varies along such a route as well. At the front the brick paving is flat, at the side there is a gravel path and at the back the grass gives way. Lay boards or slabs under the wheels on soft stretches and check at each new position that the four stabilisers genuinely make contact. Underneath a roof edge you tend to find exactly the things that get in the way: a water butt, an outside tap with a hose reel, or a shed built hard against the wall.

Hire set dropped on the pavement at the front, the starting point of the route you wheel round the house

Think about what hangs above you too. A roof overhang projecting half a metre, a satellite dish, a low telephone line or the branches of a tree decide how far you can build on that spot. Under an overhang you also have to stand further off the wall, which shortens your reach again and makes you shift more often than along a straight run. So walk the route overhead as well before ordering. For awkward ground, the guidance on uneven surfaces helps.

How many rental days while the stain soaks in

The state of the timber steers your whole plan here. Fascia boards that have stood out for years are grey and weathered, split open in places, and drink the first coat away as though nothing had gone on. Such timber takes two coats, sometimes three on the south side. Timber still in reasonable shape takes up evenly and manages with one refreshing coat. That difference between the two starting points soon means a day or two more hire.

Between coats there is waiting time you cannot make up anywhere. The first coat has to have gone fully into the grain before the second may follow, and how fast that goes depends on your product and on how warm it is outside. For an ordinary terraced house reckon on three to four rental days, and on more where the edge runs round the whole house. Never start before the dew is off, either, because then the stain stays sticky instead of sinking.

Mobile scaffold standing along the side of a house between two coats of stain, waiting for the timber

Booking wide works out well at the reservation stage. Only day one counts in full, and on every following day 95% comes off the rate, so a day of slack for a shower costs you next to nothing. Put your collection date a full day behind the day your second coat is planned, certainly while you still have to see how much the timber takes. Handing back early is always possible. How to judge such a period is at setting your rental period.

Which mobile scaffold suits staining fascia boards?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Staining fascia boards lengthways per 245 cm position

Your deck is 245 cm long, so per position you take a good two metres of roof edge. That sounds little for a house with fifteen metres of fascia board, but it is exactly the unit to think in. Always stain to a natural end point: a corner, a joint between two boards, a gutter bracket or an external corner trim. Stop halfway along a board and a dark line stands there once the timber has dried.

Work lengthways per position and not in height. Begin at the top against the roof trim, go over the face next, and finish with the underside and the end grain, so that every drop that falls still lands on untreated timber. Keep the narrow brush to hand for the gap between fascia board and gutter: that is where rainwater runs and where weathering always starts. Per position that detail costs a few extra minutes and saves you years.

Mobile scaffold standing tight to a wall, its 245 cm deck covering one stretch of roof edge per position

Every move happens with an empty deck. Close your tin, take it down, release the brakes, fold the stabilisers in, wheel to the next stretch and set it all again before you climb back. Anyone doing that four or five times a day sees at once why you hire a mobile scaffold for a roof edge longer than for a closed wall of the same area. If painting the gutter follows later, plan it inside the same period.

Scaffold hire with delivery before your first dry day

We drop the tower off as loose, counted parts and not as something already standing. So choose beforehand where those tubes and platforms may lie for a few days without you having to walk round them: a drive, a carport or the strip along the fence. Do not put them on the stretch where you want to build first, or you begin by moving them. Complete the booking before 15:00 on a working day, and your set stands at the door the next working day.

You decide yourself which day the set arrives and which day it goes, and on stain work that choice hangs on the forecast. Let the parts turn up on the eve of your first run of dry days, so you build while you still can and start staining the next morning. Building is yours, guided by the paper instruction in the box and the film that shows the order; delivering a standing tower is not in our range and we send no fitter with it.

Counted set of scaffold parts delivered on site and lying ready to be built up before the staining starts

Once the second coat is on and has sunk away, we come by to load the dismantled set back in. Taking it apart is your work, and you put the parts ready at a point the driver can reach with the van, so not behind a closed gate and not spread over three corners of the garden. Count as you dismantle, because a clamp disappears into grass in no time. Bringing and fetching is priced at the delivery charges per province.

Safe staining on the scaffold along the fascia and gutter

In load class 3 there may be 200 kg on every square metre of deck, and that is the class our towers fall into under EN 1004. For stain work that is generous, but at a roof edge there are often two of you up there: one staining and one touching in the end grain and the seams. Add the tin, the tools and the box of cloths. More is at fall protection on a mobile scaffold.

On this job you look upwards for hours, and that is exactly why the standing rules weigh heavier here. You cannot see your feet, you step back without looking and you lean over the rail with your arm out. Put the brakes on before you climb, move only with an empty deck without tin or person aboard, and stop as soon as the wind gets up. Ten metres up along a roof edge you feel gusts that hardly register below.

Mobile scaffold with guard rails and an inside climb, the way up to the roof edge with a tin of stain

The risk that belongs to stain is the spilt drop. Stain stays on aluminium and makes a deck slippery within a minute, so lay card under your tin and wipe up whatever lands beside it at once. Be careful with the gutter as a support as well: it is fixed for water, not for your weight. Keep the strip below your position free of people and parked cars, because a tin tipping over the edge sprays far into the garden.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for staining fascia boards

1

Stain the end grain and the seam between fascia board and gutter first, with a narrow brush. Rainwater drives in deepest there, and later you cannot get at it with a wide brush at all.

2

Sand a weathered board only on the morning you intend to stain it. Leave the open fibre out overnight in the dew and the timber draws up water and takes the stain unevenly.

3

Put a mark on the roof edge where you close a position off. Knowing exactly where you left off after lunch, you set the overlap on a joint and not in the middle of a board.

4

Take two tins up on a long elevation: an open working tin and a sealed spare. Then you need not go down at the moment the edge stands half wet above you.

5

Read the forecast by the hour rather than by the day. Stain that catches rain within a few hours of going on washes out of the grain and leaves pale bands over the length.

6

Ask somebody on the ground to watch the top edge while you stain. From the tower you never see whether the top of the board is fully covered, and weathering starts precisely there.

Frequently asked questions

Frequently asked questions about staining fascia boards

Which mobile scaffold should I hire to stain fascia boards?+

Hire the RS52, the wide version with a deck of 135 cm, in a build that puts you at eight to twelve metres of working height. Staining fascia boards keeps you in one spot with your arm up for a long time, and then deck room matters more than manoeuvrability. Your tin sits beside you and you can step aside without shifting anything first. Two of you fit on that deck as well. Only where the way to your garden is too narrow do you take the 75 cm version.

What does hiring a mobile scaffold for stain work look like?+

You pick model and height online, see the price including VAT and say which day the parts may arrive and which day they may leave. We deliver the counted set to your address, you build the tower, stain the roof edge all round and take it down again afterwards. On the date you entered we come back to collect the lot. The other practical points are set out at the questions about hire.

How many days must I hire a scaffold to stain the fascia boards?+

Three to four rental days is usual on a terraced house, with the sanding and two coats of stain included. Where the edge runs round the whole house, days come on top, because you move the tower along every couple of metres. Badly weathered boards drink the first coat away and ask for a third round. Since you only see how much the timber takes once the first coat is on, plan a day too many.

What does the hire cost, and what happens to the rate after day one?+

Your total is built from the model and the build height, plus a fixed sum for delivery and collection that differs per province. The page with rates per model shows the rental price including VAT, so you know beforehand where you stand. For stain work it matters most that a longer period weighs barely more than a short one: the first day is the largest item. Doing the whole edge in one go beats small blocks.

Which working height should I hire for fascia boards behind the gutter?+

With two to three storeys you hire a mobile scaffold with eight to twelve metres of working height. Measuring starts at the level where the wheels will rest, so on the brick paving or in the grass, and ends a little above the fascia board's top edge, which carries on up behind the gutter. If you want the top and the end grain too, add a little. At the back of a house the ground level often differs, so measure per elevation.

Can the scaffold be delivered the day before I hire and start staining?+

Yes, and on stain work that is the smartest order. You fill in your own delivery date, so put it on the day before the first dry spell begins. Then you build the mobile scaffold calmly without the staining suffering for it, and the next morning you stand on the deck with a tin in your hand. If you would rather drive to us, the parts are ready by appointment at Zeeburgerpad with no extra charge.

Is building included in the hire, or do I put the tower up myself?+

You put it up yourself. We hire out the mobile scaffold as a set of loose parts and collect it after your last day; erecting the tower, walking it along the roof edge and dismantling it at the end are yours. A manual is in the box and a film online demonstrates the order. Keep half of the first rental day free for that build. Assembled facade scaffolds, system scaffolds and cherry pickers are not something we supply.

What if the staining is not finished and I have to hire longer?+

Report it the moment it becomes obvious, and we shift the collection date of your mobile scaffold, unless it has already been promised elsewhere. On fascia boards it regularly runs over, because only along the way do you notice how much stain the timber draws and how many spots need sanding first. So when in doubt book a day longer straight away; earlier return is always fine. Then you never stop with a half treated edge.

How much room is needed where you want to hire and set up the scaffold?+

Besides the width of the mobile scaffold itself, the four stabilisers splay out on all sides, so count on a clear strip of a couple of metres. Because this job takes you round the house, that applies not to one spot but to your whole route. A water butt, an outside tap, a wood pile or a shed against the wall decides whether the hired tower turns the corner or has to be broken down in between.

Does the hire run on if it stays too damp to lay stain?+

The tower simply stays where it is, only your work shifts. Damp timber will not take stain into the grain, and a coat that catches rain soon after going on washes out and leaves bands. Use a grey day to sand, brush off growth or clear the gutter. Because you decide yourself how long the mobile scaffold stays standing, a shift like that usually costs you no more than a single day of hire.

Hiring a scaffold for stain work: how is the deposit handled?+

When booking you leave a deposit alongside the rental sum. After the mobile scaffold has been collected and the parts counted, that amount is credited back to your account within one working day. Stain work brings two points of attention: every part goes back, and no stain may have dried onto the tubes or the platform. A sheet of card under the tin prevents that. More is at getting your deposit back.

Can I stain the barge boards and the roof overhang in the same rental period?+

That is exactly what to do, because those parts sit at the same height and you have the mobile scaffold standing there anyway. Bear in mind that the underside of an overhang is above your head and costs more time per metre than a straight fascia board. Allow extra positions for it and add half a day to your period. Do stain everything in the same round, or the colour will differ visibly.

Hire a mobile scaffold for staining fascia boards today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.