See your price
Application

Staining a log cabin? Choose the right scaffold.

Staining a log cabin is mostly ground level work: you take the wall logs standing up, with the tin beside your feet. Only at the gable end and the roof overhang do you go above your own reach, and there you want to stand still and square rather than wobble on a step ladder. For that part you hire a MiTower: 75 cm narrow, built for one person, reaching somewhere between four and six metres. Below you read which rental period suits stain and where the scaffold ends up in your garden.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For staining a log cabin we recommend the 1-person scaffold.
  • For staining a log cabin you hire the MiTower: a one person tower just 75 cm wide, reaching roughly four to six metres.
  • Only the gable end and the overhang really call for a scaffold; the lower wall logs you stain standing on the grass.
  • Stain has to sink in and dry off, so book two to three rental days and put them in a dry spell.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for staining a log cabin?

Safe, stable and professional work at height

Stain sinks into the timber instead of lying on it as a film, and that makes the forecast govern your rental period more than your speed with a brush. You want to finish one elevation from ridge to bottom log in a single continuous movement, without half an hour of climbing between two bands. On a step ladder that is impossible: you shift it every metre, your tin stands on the ground, and at the gable you are reaching sideways. Hiring a mobile scaffold to stain a log cabin gives you a flat deck where the tin travels with you and both arms stay free for the brush.

  • Gable end and overhang sit above your reach
  • Narrow path to the back, 75 cm fits
  • Stain needs dry timber and dry days
  • Working height of four to six metres suffices
Read more about working safely →

Which mobile scaffold to hire for staining a log cabin

For a log cabin of ordinary height you hire the Altrex MiTower, a one person tower 75 cm wide. That width is what decides it here: a garden building rarely stands on the street, so the scaffold has to pass a side gate, a paved path or the strip between the hedge and the wall first. Once it is round the back you can shift it along the elevation on your own. The models sit side by side on the page about the MiTower you can hire.

What has to go up with you is limited when you are staining: a tin, a wide brush or block brush, a cloth and a piece of abrasive paper for a rough patch. You do not need a second deck width for that. It matters more that the tower stays light, because you move it around a garden over grass and paving where no barrow track runs. Wheeling a heavy build over soft lawn costs you more time in the end than the extra deck width wins back.

Assembled mobile scaffold on a narrow chassis, the type of tower you shift along the wall of a log cabin

If two of you are working, or if repair work with filler, a sander and a small step on the platform comes first, the narrow tower soon feels cramped. Hire the RS51 at 75 cm with more build height in that case, or the wide RS52 if materials really have to stay up there. Both of those reach 14.2 metres as models, well beyond what a cabin needs. Which other sizes sit in the fleet you find in the overview of mobile scaffolds for hire.

Working height to hire for a log cabin gable end

The highest point of this job is almost never the wall but the tip of the gable and the barge boards fixed against it. On a log cabin with a pitched roof that point usually sits between 2.5 and 3.5 metres above the garden, and a working height of 4 to 6 metres then serves you well. Work back to your platform: from the deck you stand on, roughly 2 metres of reach is added before you are up at the ridge.

Your zero point is the ground the wheels come to rest on, and at a garden building that is rarely level with the floor inside. If the little house sits on a raised concrete kerb, or on slabs above a lawn that falls away towards a ditch, your measurement starts a good deal lower than you would guess by eye. Where the roof drops away at the back into a lower overhang, still take the highest barge board, because that is where your brush will be.

Mobile scaffold built up to the top edge of a house front, comparable to the height a gable end asks for

Hiring too tight shows in the finish straight away with stain. Stand too low and you work the ridge with a straight arm above your head, the stain runs down your brush and the top logs end up with a different saturation from the rest. On top of that you still have to fetch that last half metre with a second set up. What a working height of 6 metres gives you in practice is set out on that page.

Hiring a mobile scaffold and standing it on the grass

The standing place for this job is nearly always garden and not paving, and that is the hardest part of the whole set up. Grass gives way the moment weight comes onto it, certainly after a wet night. So lay a firm board or a paving slab under each wheel, so the foot does not press into the turf while you are up there. Check once more after the first hour that everything is still level, because sinking into turf is slow and you notice it only when the tower already leans.

Then look at the space around it. The four stabilisers splay outwards and therefore want a strip that is wider on every side than the tower itself. At a log cabin there is usually a border right there, a water butt under the downpipe, a stack of firewood or a tree root you cannot flatten. Clear that away before the scaffold arrives. If your garden slopes or the soil is loose, first read what to arrange on uneven ground.

Stabilisers reaching out sideways under a mobile scaffold, marking the flat strip a garden position needs around the wheels

Watch what hangs above you as well. A garden building often stands at the back, with an espalier, a pergola or the branches next door over it, and those decide how high you can still build on this spot. Prune whatever is in the way well before your delivery day, or choose a position that approaches the gable from the side. Shifting along with a branch poking between the guard rails is no option, and sawing at height even less so.

How many rental days for staining a log cabin

A log cabin of average size takes two coats of stain, and the staining itself goes quicker than most people expect. What eats the time is the preparation: green growth off, loose fibre sanded away, resin patches treated and the whole thing left to dry before anything may go on. For a complete cabin including the gable end you therefore land on two to three rental days, with one more on top when the timber has had nothing for years and drinks unevenly everywhere.

Part of that period you stand still with nothing to be done about it. The first coat has to have sunk away completely before the next may follow, and the product sets that pace together with the outside temperature. The season comes on top: in spring and late summer dew lies on the timber long into the morning, so you only get going around the middle of the morning. Plan your rental days over one unbroken dry spell for that reason.

Mobile scaffold left standing along a side wall, the way a tower stays put at the cabin through your rental days

Booking generously is rarely an expensive choice on this job. The full rate applies to the first 24 hours only, and everything after that comes with 95% off, so a spare day for a shower barely shows in your total. Do not put your end date on the morning your last coat is due to fall, but a day beyond it, and keep an eye on the outlook while you work. Help with that estimate is at working out your number of rental days.

Which mobile scaffold suits staining a log cabin?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Staining the log cabin from a platform of 245 cm

With a deck 245 cm long you take a good two metres of wall per position. At a log cabin that means in practice that the whole gable triangle falls within one set up, from the ridge down to where you can carry on from the ground. Finish that triangle in one go, because a start line in stain stays visible once the timber has dried. Begin at the ridge and work downwards, so that you never walk over a band you have just laid.

Stain log by log and over the full length, corner to corner, and do not break off halfway along a length. With horizontal shiplap that means you work across the width and only move once the edge of the log is reached. Take everything you need up in one trip: the tin, a second brush for the joints, a cloth for the drips and tape for the ironmongery. Every forgotten brush is one more climb down.

Parts of a hired tower on paving, the set that gives you a platform two and a half metres long

What people misjudge is the overhang. You stain the underside of it above your head, with the brush turned over and a drip free load, and per metre that costs about three times as long as a smooth wall. Allow one or two extra positions for it deliberately, certainly where the roof edge projects well over the wall and you work at an angle. Doing the surrounding fence around the garden as well is better kept outside this rental period.

Scaffold hire with delivery to the back of the garden

The mobile scaffold turns up at your address as a counted set of loose parts, not as a tower that already stands. Agree with yourself beforehand where that pile lands, because you want the strip beside the log cabin free for the work. The drive or the terrace is a better spot than the lawn, where tubes sink in and turn wet. Fix your booking on a working day and manage it before 15:00, and the van is on its way to you the next working day.

Which date the set arrives and which date it leaves again you fill in yourself, and with stain work you let both choices follow the forecast. Make sure the parts are lying there a day before your first staining day, so that building and working do not fall on one morning. That building is your side of the job: a manual comes with it and a video is ready, delivering an assembled tower is not something we do. Count on carrying the parts to the back of the garden by hand afterwards.

Scaffold parts laid out on a lawn, the way a hired set is dropped off beside a garden building

Once the job is done we drive back to collect everything. Taking it down stays your task, as does stacking the parts somewhere a van can reach, so not behind a gate whose key is indoors. Count the pieces while you dismantle, then nothing stays behind in the long grass. A dry, level spot for that stack makes the load out quicker for everyone. What bringing and fetching costs you read at the delivery rates per province.

Safe staining on the mobile scaffold at your log cabin

What we hire out is tested against EN 1004 and sits in load class 3, which means 200 kg per square metre of deck. Staining on your own you stay well under that, because you plus a full tin weigh little. Climb up with two of you and set a box of repair materials down as well and it is worth adding up. What that class stands for you can read in the explanation of this scaffold standard.

The fixed rules apply at the back of a garden where nobody is watching too. Before you take the first rung the brakes go on; moving happens empty, so without a person and without a tin of stain on board; and as soon as the wind really picks up you stop. A garden building often stands free in the grass, with no house to break the gusts, so you feel the wind here sooner than against a house wall. Every move ends with checking the four stabilisers again.

Mobile scaffold with guard rails and a built in ladder, the way up to the platform when you are staining

The risk that belongs to this job in particular is the deck under your feet. Spilt stain does not soak into aluminium and turns a platform greasy within a minute, so put card under your tin and wipe drips away at once. Keep the zone below clear of children and pets, because a falling tin takes the whole garden with it and splashes far into the border. The rest is at the rules for working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for staining a log cabin

1

Lay a paving slab or a solid board under every wheel before you build the tower. Grass that looks firm and dry will still settle unevenly under one of the four feet after a few hours.

2

Stain the end grain of the barge boards first, while your brush is still clean. Those faces drink the most and are the hardest to touch in once the rest has been set.

3

Hang your tin on a hook inside the guard rail rather than leaving it loose on the deck. That way you do not kick it over while shuffling sideways towards the ridge.

4

Mark with a garden cane where the wheels stood for each position. If a shower sends you back to the same spot, your tower goes up again on the old height and line.

5

Stain the overhang on a cloudy day and the sunny side in the morning. Stain that flashes off too fast in full sun leaves streaks you will never get out again later.

6

Set your collection date a full day behind your second coat. That leaves room to take the tower apart dry and count all the parts before the van turns into the street.

Frequently asked questions

Frequently asked questions about staining a log cabin

Which mobile scaffold should I hire for staining a log cabin?+

For a log cabin you hire the MiTower in most cases, the one person tower 75 cm wide with a working height of a good six metres. That width passes a side gate and a garden path where a wide build gets stuck, and for staining you need little more on the deck than a tin and a brush. Working with two of you, or with solid repair work first, choose a wider mobile scaffold instead.

How does hiring a scaffold for my garden building work, from booking to collection?+

You set down online which model you want and which working height goes with it, at a fixed price including VAT, and you fill in your own delivery date and collection date straight away. We drop the parts off, you build the tower beside the log cabin, stain your walls and take it apart again. On the agreed day we load everything back into the van. If you get stuck, the common questions about hiring help you on.

How many rental days does staining a log cabin take, from sanding to second coat?+

For an average garden building two to three days of hire is realistic, including the sanding beforehand and two coats of stain. The real work at height, the gable end with the overhang, is only a small part of that; the rest of the time goes on preparation and on waiting for a coat to sink away. Where the timber has had nothing for years and drinks differently everywhere, add a day. Booking wide beats booking tight on stain work.

What does it cost to hire this tower, and what happens after day one?+

The amount depends on which model you take and how high you build it, with bringing and fetching settled per province on top. You see the rental price including VAT before you commit, on the page with fixed rates per model. With stain work you watch above all the ratio between day one and the days after it: that first day weighs by far the heaviest. Staining a cabin in one unbroken period therefore beats two short hires.

Which working height should I hire for the gable end of a log cabin?+

A working height between four and six metres covers almost every log cabin with a pitched roof, and that is exactly the range this mobile scaffold is hired for. Measure from the grass or the slabs where the wheels will stand up to the tip of the gable, and count the barge boards in when they get a coat too. If the cabin sits on a raised base, still begin your measurement in the garden. Which build suits which height is on the page about working heights.

Do I collect the mobile scaffold myself or can I have it delivered when hiring?+

Either way is fine. If you choose delivery when hiring the mobile scaffold, we drop the parts off on the date you filled in and come to take them away after your last staining day, for a fixed amount that differs per province. If you would rather drive yourself, the set is ready free of charge by appointment at Zeeburgerpad, as long as your car or trailer takes the length. With a garden building at the back most people pick delivery.

Is putting the tower up included when you hire it?+

Putting it up stays with you. We hire out the tower as a counted set of loose parts and come to collect it after your last day, but assembling, shifting and dismantling is yours. At a low build beside a log cabin you are not busy with that for long with the manual and the video beside you, certainly not with a second pair of hands. Cherry pickers, system scaffolds and facade scaffolds sit outside what we supply.

What if the staining overruns and I want to hire the scaffold longer?+

Say so in good time and we will move your collection date, at least as long as that tower is not already booked for the next customer. Staining simply overruns more often than planned, because the second coat can only follow once the first has soaked in fully and that will not be forced. To get ahead of the risk, book a day longer at once; returning early is allowed too. Then you never stand halfway up a gable with a van at the door.

How much room do you need in the garden around the foot of the tower?+

Take the width of the tower and add how far the four stabilisers reach out on either side; in practice you want a flat strip of a couple of metres kept free alongside the log cabin. A border, a compost heap, a stack of firewood or a low hanging branch all count as an obstacle there. Clear those things before the day the hired parts arrive, because shifting an assembled mobile scaffold in between costs you an hour.

Does my rental period run on if the weather stays too wet to stain?+

The tower may quietly stay standing, only the staining shifts. Timber full of water takes nothing up, and a coat laid in drizzle dries away blotchy instead of even. Use a day like that to brush off growth, sand back rough fibre or mask the ironmongery, and pick the staining up afterwards. Because you fill in yourself how long you keep the mobile scaffold, the bill for such a shift stays limited to one more day.

How is the deposit arranged when you hire a mobile scaffold?+

Alongside the hire you settle a deposit when booking. As soon as the returned scaffold set has been counted back in, we refund that amount within one working day. With stain work there are two things to watch: all the parts have to go back, and there should be no dried stain on the tubes or the deck. A piece of card under your tin saves scrubbing later. What else plays a part is at getting your deposit back.

Will this tower also reach the roof tiles or the shingles of the log cabin?+

At a garden building of normal height this build reaches the ridge, and therefore the roof edge and the bottom row of shingles or tiles as well. You do not step onto the roof surface itself: the boarding of a log cabin is not made for that, and you hired the tower precisely to stay beside it. With a large garden building with a loft in it, hire a mobile scaffold with more build height than this light one person version.

Hire a mobile scaffold for staining a log cabin today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.