See your price
Application

Coating a concrete floor? Choose the right scaffold.

You coat a concrete floor on your knees, with a roller on a pole, and no scaffold comes near it. People still hire one, and rightly so: everything hanging above that floor has to be finished first. The ceiling, the tops of the walls, the light fittings and the pipework all want doing or taking away before the first coat goes down. For that work in a garage, cellar or workshop you hire the RS44 room scaffold, with a reach of 3 to 4 metres.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For coating a concrete floor we recommend the Room scaffold.
  • The high work above a concrete floor is done from the RS44 room scaffold, with a working height of 3 to 4 metres.
  • The coating itself asks for no scaffold: you hire one for the ceiling, the wall heads and the services above it.
  • Set the collection day before you start coating, because a tower standing on fresh coating is exactly what you do not want.
  • First 24 hours from €50 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldRoom scaffold (Altrex RS44)
Working height for this job3 to 4 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €2.50 a day
Why a mobile scaffold for coating a concrete floor?

Safe, stable and professional work at height

On this job the order of work matters more than the tools. A coating is the last operation in a room: once it is down you want nothing heavy rolled over it and no dust or drill grit falling on it. So everything up high has to happen first, and for that you need a platform, because you work with both hands on a fitting or a pipe clip. Hiring a scaffold to coat a concrete floor sounds contradictory, but it is about the week before. You hire the room scaffold for the ceiling and the walls, and you put it outside again before the roller goes in and the floor closes.

  • Ceiling and wall heads first, coating last
  • Room scaffold passes through an internal door
  • Working height of 3 to 4 metres in a garage
  • Tower outside before the first coat goes down
Read more about working safely →

Which scaffold to hire for coating a concrete floor

For the work above a concrete floor you hire the Altrex RS44 room scaffold. That model is made for indoors: it comes through an internal door from about 70 cm, so you get it from the hall into the garage or from the utility room down to the cellar without dismantling anything. An ordinary tower jams in a doorway like that. Which sizes belong to it is shown under hiring a room scaffold. Measure your narrowest door frame before you order.

On this job what the scaffold does to the floor counts as well. You roll it back and forth over precisely the concrete you are going to coat, so you want a light build with clean wheels and no heavy chest dragging scratches across it. The room scaffold is the right size for that: big enough to stand on with a light fitting in both hands, small enough to move on your own. A deck of 245 cm gives you the length to finish a row of lamps.

Scaffold parts set down beside a front door, the route indoors a room scaffold takes to reach the garage ceiling

Is the space higher than four metres, a shed or a lock-up with an open roof, then this model falls short and it is better to hire a mobile scaffold, for instance the narrow RS51 of 75 cm. That still passes a double door or a roller shutter, but no longer a normal internal door. So measure the clear height to the ceiling first and the way in afterwards. Where the two models differ is set out in the comparison of the two types.

Which working height to hire for a garage ceiling

The highest point here is the ceiling itself, or whatever hangs beneath it: a pipe clip, a cable tray, the gear of a garage door. In a garage or a cellar that sits at two and a half to three metres, and then you hire a working height of 3 to 4 metres. That figure is the height of your deck with about 2 metres of reach on top, so your platform ends up at one to two metres. There is no sense in hiring higher than the ceiling.

Measure from the concrete floor the wheels come to stand on, not from the threshold or the drive in front of it. In a cellar that easily accounts for half a metre, and in a garage with a sunken pit or a drainage channel your starting point differs from place to place. Where the floor falls away to a gully, measure at the lowest point, because that is where the tower stands furthest from the ceiling. A reach of 4 metres working height shows which platform heights fit inside it.

Assembled tower with its platform at working height, the set-up that brings a garage ceiling above a concrete floor within reach

Choosing too low takes its revenge immediately on ceiling work. Stand under your work rather than beside it and your arms stay above your head, everything you unscrew drops in your face and you go at half speed. On a ceiling you want your head just below the soffit, so you work with your elbows bent instead of straight. Pick too high and your head is against a beam or a clip. So take the reach that suits a room on the ground floor.

Standing the hired room scaffold on the concrete floor itself

What is unusual about this job is that your standing place and your workpiece are the same thing: the room scaffold stands on the concrete floor you are going to coat. That is the best base you could wish for, flat and load bearing, but watch two things. Concrete that has not been ground yet is full of dust, and dust under a wheel means the brake has less grip. So sweep the spot where you put the tower down and keep a broom within reach.

The second point is the space around it. A garage or workshop is full: a car, a bench, racking, a boiler in the corner and bikes along the wall. The stabilisers have to be able to come out, so get that lot out before the scaffold arrives and not while you are already building. Where the floor falls towards a drainage channel, position the tower so that no single wheel drops into it. One wheel in a channel puts the whole build out of plumb.

Stabilisers and wheels at the foot of a tower, exactly what has to fit on the concrete floor before coating starts

In an enclosed room think about light and air as well. The moment you take the fittings off to do the ceiling you are standing on a platform in the dark, so hang a work lamp somewhere other than where you are working. Ventilate as well: in a cellar without a window everything you release stays hanging. Arrange that before you hire the room scaffold, because building in a half full room with poor light is a bad start and costs you an hour.

Coating a concrete floor: how many days to rent the tower

This job falls into two parts and only the first part asks for a scaffold. Cleaning the ceiling, making good the walls right to the top, taking down or replacing fittings and tidying pipework costs you two days in an average garage. The coating itself, with grinding, vacuuming, primer and two coats, takes another two to three days after that, but by then the room scaffold has long been outside. So hire it for the first block and not for the whole job.

That first block still holds moments of waiting. Fresh paint on the tops of the walls has to be dry before you carry on beneath it, and an electrician wiring up the fittings comes on his own day. Reckon on three to four rental days rather than two, then, with the collection on the morning you start grinding. The room stands empty at the point where dust free working really counts and no tubes are left in the way.

Dismantled scaffold parts stacked ready for transport, the step that has to happen before the first coat of coating

Taking those days generously need not cost much. The first 24 hours carry the full rate on their own; every rental day after that counts with 95% off, so a spare day for the electrician barely weighs. What you do want to avoid is the room scaffold still being indoors when the primer has to go down. Set that collection date sharply even so. Judging such a period is covered at hiring by the day or by the week.

Which mobile scaffold suits coating a concrete floor?

Most chosen
Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Finishing ceiling and wall heads from the scaffold platform

From the platform you finish a strip of ceiling per position about as long as the deck you are standing on, so 245 cm, and as wide as you can get without stretching. In a garage of six by three metres that means some four positions for the ceiling alone. Keep to one fixed direction while you do it, from the back wall towards the door for instance, so that you finish at the way out and not in the furthest corner.

What you do from the room scaffold is everything above shoulder height: brushing and painting the ceiling, the top fifty centimetres of the walls, clipping up cable trays, fitting a smoke alarm or a light and strapping loose pipework. What you do not do from it is the floor. Coating goes on from the floor itself, walking backwards towards the door, and you want that done with no wheels, legs or bucket on the concrete. That is the entire reason for this order of work.

Tower assembled beside a brick wall, its 245 cm deck the length of ceiling strip one position covers

Repositioning indoors goes faster than outdoors, because the floor is flat and you are not wrestling stabilisers over a garden path. People still underestimate the number of moves: every hole drilled somewhere else is another shift. So take up in one go what you need, from plugs to a vacuum hose, and lay a piece of cardboard on the deck for your tools. If there is ceiling work with paint as well, plan it into these same positions.

Room scaffold hire with delivery: through the door and inside

The room scaffold comes as a counted set of loose parts, and on this job you do not want that stack lying on the concrete floor. Ask the driver to put the set on the drive or in the hall and carry it in piece by piece. An order that reaches us before 15:00 on a working day is ready for you the next working day. Measure the way through beforehand, because a garage is sometimes reachable only through a narrow utility room.

You decide which morning the set arrives and when it leaves again, and on this job that second moment matters most. Put it on the day before the primer goes down, so the room can be empty before you start. Building is your task: with the manual and the instruction video the room scaffold goes up in about an hour, and with this model you manage it alone. The step by step build instruction sets out what goes where.

Counted scaffold parts on the pavement on arrival, the load you carry inside piece by piece to the garage

Afterwards you take it apart and we load it back into the van, so have the parts waiting outside or in the hall and not in the middle of a floor that is curing. Collecting is allowed too, by appointment in Amsterdam, and a roomy van is enough for a room scaffold. What delivery out and back costs per province is at the delivery rates per province. Count that amount into the budget for the whole job.

Working safely above a concrete floor you still have to coat

A room scaffold sits under EN 1004 just like the rest, in load class 3: that permits 200 kg on every square metre of deck. For ceiling work it sounds generous, until you add up a tool chest, a drill, a carton of new fittings and somebody working beside you. Spread the weight over the platform instead of putting it all beside the hatch. More about that limit is in the explanation of what a scaffold may carry.

The fixed rules stay exactly the same indoors. Brake the wheels before you step on, let nobody stand on the tower while it travels, and put the stabilisers out again after every move. Wind plays no part inside, but a draught through an open garage door does, certainly with sheeting hanging on the frame. Wedge that door or shut it while you are up top. A build that shifts half a metre while you are drilling throws you off balance.

Complete counted set of inspected scaffold parts, the starting point for safe ceiling work before a concrete floor is coated

The risks that come with this job arrive from above and from below. Above you are working on electrics, so pull the circuit before you unscrew a fitting, even when you are certain the switch is off. Below you lies hard concrete with no grass or sand to break a fall, so let nothing stick out over the guard rail. Freshly ground concrete is powder slippery too; sweep it before you shift the tower again. The other rules for working at height hold in full.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for coating a concrete floor

1

Photograph the ceiling before you begin. If you have to look up later where the clips and the wiring ran, that saves you a whole extra position with the room scaffold.

2

Work from the furthest corner towards the door. Then you never have to roll the tower over a stretch of floor you have already swept and degreased ready for the coating.

3

Lift the scaffold over the last bit instead of rolling it across a cleaned surface. Rubber wheels leave marks on concrete, and those have to be ground out again before you coat.

4

Put the collection day in your diary on the same day as the final vacuuming. The coating can then go down straight afterwards with nothing left standing inside the room.

5

Unscrew the fittings and do not hang them back until the floor is finished. You need temporary lighting for a while, but you avoid hiring the room scaffold a second time.

6

Check that the clear height is the same everywhere. A lowered section by a boiler or a beam above the door can mean hanging your platform a level lower in one spot.

Frequently asked questions

Frequently asked questions about coating a concrete floor

Which scaffold should I hire if I am going to coat a concrete floor?+

Everything hanging above the concrete floor is tackled from a hired RS44 room scaffold. That model is meant for indoors, passes an internal door from about 70 cm and has a reach of 3 to 4 metres, which is exactly what a garage, cellar or store asks for. In a unit with a higher ceiling you rent the narrow RS51 instead. Either way the coating itself goes on from the floor. Measure the narrowest opening to the room before you book.

How does hiring a room scaffold work for this preparation?+

You book online, choose the model and the reach, then give an arrival date for the set and a date on which it must leave again. We put the parts down, you carry them in, build up and finish the ceiling and the wall heads. After that you dismantle and we collect the room scaffold. On this job the hire stands or falls by that collection date, because the room has to be empty before you start coating.

How many rental days do I need for the high work?+

Reckon on three to four rental days. Two of them go on the real work overhead: ceiling, tops of the walls, fittings and pipework. The rest is slack for drying time or for a fitter who comes when it suits him. The coating stands apart from that and takes another two to three days with no scaffold at all. So hire for the block that runs ahead of the coating and your period stays short.

How is the rental price built up if I hire for longer?+

The sum you pay comes out of the model and the reach you pick, plus a fixed amount per province for the run out and back. That rental price is listed including VAT with the rates per scaffold. For this job the structure is helpful: after the first 24 hours each further day weighs very little, so slack for a fitter or a drying time costs you almost nothing. Do count the transport separately, since it applies per run and not per day.

Which working height should I hire for a garage ceiling?+

In a garage or cellar the ceiling normally hangs between two and a half and three metres, for which you hire a room scaffold reaching 3 to 4 metres. Measure from the concrete floor the wheels stand on, not from the threshold. Where a cable tray or a garage door motor hangs below the ceiling, measure to the underside of that. Pick your platform so you work with bent arms rather than stretched ones. Your neck will thank you.

Can the room scaffold be delivered, or do I collect it myself?+

Both work. On delivery the set is put down wherever the van can reach it, and carrying the parts indoors is down to you. If you want to drive yourself, a room scaffold can be picked up by appointment and fits in a roomy van. For an indoor job like this many people fetch it, since the parts have to go through the door one at a time anyway. It changes nothing else about the hire.

Is building included when you hire a room scaffold?+

No, that stays with you. We put the parts down and come to fetch them afterwards; putting up, moving and dismantling are yours. A room scaffold is the easiest model we hire out in that respect: light, few parts, and standing in roughly an hour even on your own. The manual and the video run through it step by step. Do count that hour in. We do not hire out erection services, facade scaffolds or cherry pickers.

What if the preparation overruns and I want to extend the hire?+

Tell us before the collection day arrives and we move it on, as long as nobody else is waiting. On this preparation work things regularly overrun: a pipe turns out to run differently, or the electrician can only come a day later. Anyone booking generously is not troubled by that, since handing back early is fine too. What you do not want is a tower still indoors on the day the primer goes down.

How much space has to be clear in the garage?+

You need the footprint of the tower plus room to splay the stabilisers, and on top of that a run you can roll it along. In a garage that means the car out, the bikes out and the racking half a metre off the wall. Clear it before the set is delivered, because manoeuvring a scaffold on wheels between boxes always goes wrong. An empty room saves you half a day.

May the hired scaffold stand on the concrete floor I am going to coat?+

Yes, and that is the intention: the concrete floor is the base it stands on. Do make sure the concrete is clean and dry, because dust under the wheels reduces the grip of the brakes. What to avoid is putting the tower on a floor that is already primed or coated. Fresh coating is soft, and wheels and stabilisers print straight through it. So fix that collection day first when you hire.

When is the deposit back after hiring a room scaffold?+

You pay a deposit at booking, and once all the parts are counted the amount is back in your account inside one working day of the return. On this job you mainly watch for paint and coating on the tubes and the platform, since dried residue never comes off again. Cover the scaffold deck over while you work at the ceiling. Count the parts as you dismantle, then you know the set goes back complete.

Do I have to hire again if I need to go up after coating?+

Usually not. Finish the high work in one go before the coating goes down and there is no need to hire the room scaffold a second time. If something does still turn up, wait until the coating has cured fully before you roll wheels over it again, and put boards under the tower in that case. Rounding everything off overhead within one rental period is cheaper than a second booking.

Hire a mobile scaffold for coating a concrete floor today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.