See your price
Application

Removing algae? Choose the right scaffold.

Removing algae is wet work over a big area. Water you put on runs down, over the platform, along the uprights and into the wheels. At the same time you have a whole elevation to do, from the roof edge to just above the ground floor, and that means much moving. For a wall of three storeys you hire a wide mobile scaffold: the RS52 with its 135 cm deck, built up to 8 or 12 metres of working height. Below you read why width wins here and why you book one continuous period.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For removing algae we recommend the Wide mobile scaffold.
  • Algae on a tall wall call for the wide RS52: a deck of 135 cm and 8 to 12 metres working height.
  • The broad platform leaves you a dry half beside the wet one, plus room for the bucket, the hose and the brush.
  • Book one unbroken rental period, because building a tall tower a second time costs far more than a few added days.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for removing algae?

Safe, stable and professional work at height

When you remove algae, gravity works against you. Everything you spray or brush onto the wall comes back down, over your shoes, over the platform and over the rungs of the ladder. That makes the floor you stand on slippery at exactly the moment you are pulling on a pole or a lance with both hands. On top of that a wall of three storeys is a large surface, so you shift the setup often and you are busy for days. A ladder is no option for this work, since you have no free hand, nowhere to put your bucket and no stable stance when the brush catches.

  • Water running down across the platform
  • Large wall area, so many repositions
  • Bucket, hose and brush go up too
  • One unbroken rental period avoids building twice
Read more about working safely →

Which mobile scaffold to hire for removing algae

For algae on a tall wall we advise the wide Altrex RS TOWER 52, with a deck of 135 cm. That width is not a luxury here but the whole point: on a narrow deck everything you bring up stands in the same wet strip where you put your feet. At 135 cm you keep a dry side free for the bucket, the jerrycan and your phone. How the builds differ in width and reach you compare on the page where you hire a mobile scaffold.

The deck is 245 cm long, so each standing position puts a good two metres of wall within reach. On a wet job the combined measurement counts: along those 245 cm you walk back and forth, while the 135 cm of width lets you step past your bucket without treading in it. That sounds small, but on a wall ten metres high it saves you dozens of balancing acts with a full container in your hand.

Hired frames leaning at the foot of a tall house wall, the wide build delivered flat before you put it together

You hire the narrow RS51 at 75 cm only when the wall cannot be reached any other way, through a gate or an alley for instance. You give up working room and will leave the bucket below more often. Narrower still exists, but the RS44 room scaffold reaches 3 to 4 metres and never comes near a roof edge, since it is meant for indoor work. For a wall full of growth the wide build is nearly always the better hire.

What working height to hire to reach algae at the gutter

Algae usually sit thickest on the top few metres, where the wall stays wet longest and catches the least sun. Your highest working point is therefore often the edge under the gutter, not halfway up. On a house of three storeys that brings you to 8 to 12 metres of working height. Your platform then stands between 6 and 10 metres, because working height is the height of that platform with about 2 metres of reach added.

Start your measurement at the paving under the wheels and stop at the underside of the gutter. If a boxed gutter or an overhang projects, count its depth as well, because you have to get under it at an angle with a pole. Working below a gable end, the surface to be cleaned often carries on a few metres above the gutter, and that costs a whole storey in what you hire. The matching build is described on the page about twelve metres of working height.

Tall mobile scaffold along a front elevation reaching the gutter, the height algae on the top metres demand

Hiring too low shows on the top edge. What you clean from a distance with a pole never gets rinsed properly, and that is exactly where the growth stays. You also end up working with the lance pointing upwards, so the water runs in at your sleeve and spreads across the deck. Choose the build that puts the top edge at eye level, and for a third storey those heights are set out at the third floor.

Hiring a mobile scaffold for algae: where it stands dry

On wet work the standing position matters more than on any other job, because you are soaking the ground under your own wheels. Put the setup on paving, block or concrete and not on grass or loose soil, which turns to mud after half a day of rinsing. If the water runs towards your feet, lay a channel of boards or steer it to the drain with a sheet. A wheel sinking while you stand at ten metres is exactly what you do not want.

Around the base the four stabilisers have to swing out fully, and on a build of 8 to 12 metres those feet stand further out than on a low setup in a garden. Clear that strip completely: bikes, planters, the water butt and the garden furniture, and keep free the hose you will need at the tap. Cover the planting under the wall before you start, because cleaner running down lands there whatever you do.

Stabilisers swung out at the bottom of a tall tower, with the paved and cleared strip that wet work needs

Think about what happens beyond your own boundary too. Wash water with growth in it runs across the pavement and can creep under a neighbour's shed door, and a car parked within ten metres catches the mist. Warn the neighbours and start on the side where the water can drain away, so you do not flood your own working area. How to put a tall setup down firm and level is in the piece on stabilising and anchoring.

Renting a scaffold for algae: how many days in a row

For a wall of three storeys reckon on four to seven rental days. The sum is simple: each position covers a good two metres of width over the full height, so a wall ten metres wide already asks four to five positions. Every position means moving, levelling again and checking the stabilisers, and at this height that takes half an hour each time. Two elevations or a corner house nearly doubles that, and then you are talking about a full working week.

On top of that come waiting times you cannot compress. Algae cleaner has to soak in before you brush or rinse, and depending on the product that takes a quarter of an hour to a couple of hours. A north facing wall then dries slowly, and in frost or fierce sun you do not work at all. So reckon per position with applying, soaking, brushing and rinsing, and not with the minutes the spraying itself takes.

Inspected scaffold set, counted and complete, the kit hired for one unbroken run of work on algae

Do this in one unbroken period. You settle the full rate for day one, and on all the days that follow you get 95% off, which makes leaving it standing for a week far cheaper than ordering the tower twice for a few days. Dismantling and rebuilding also costs you two half days, and on a tall wall that is exactly the work you can do without. How to judge the period is in the piece on rental days.

Which mobile scaffold suits removing algae?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Removing algae from a wide 245 cm platform

Work each position from the top down, because everything you put on runs that way. Start at the gutter, let the cleaner soak, brush it, then rinse down in the same lane. Finish that strip of 245 cm completely before you move the tower, or you get drying marks where two positions meet. That seam you put on a corner, a downpipe or a vertical joint, where nobody looks for it once the wall is dry.

What you take up is heavier here than on paintwork. A ten litre bucket weighs ten kilos, and there is a brush on a pole, a spray lance and a hose running up from below. Take the water hose up on the outside and clip it loosely to the guardrail, so no weight hangs from your wrist and nothing slides under a wheel. Put your bucket on the dry half of the platform, out of the walking line.

Side elevation with a mobile scaffold in front of it, the deck you shift lane by lane along the wall

Before you roll, everything comes off the deck and the hose comes loose. You never move a mobile scaffold with materials or a person on it, and on a wet floor you do not want to ride along yourself. Look where the water has run before you release the wheels, because a slippery slab under a wheel makes steering awkward. If you are cleaning the gutter from the same position that week, plan it straight afterwards.

Scaffold hire with delivery for an algae treatment

What arrives at your front door is a stack of loose tubes, frames and platforms, complete and counted. Point out beforehand where that stack may lie, and bear in mind the water you will later send down the wall, because parts in the rinsing zone are already in the mud on build day. Confirm it on a working day ahead of 15:00 and the load leaves the depot the next working day, so you can jump on a dry forecast at short notice.

You choose the arrival date and the departure date yourself. For this job you choose a start when it stays dry and calm for a few days, since you do not want to build ten metres of tower in the rain. Assembling is your own job, with two people and from the bottom up, with the manual and the instruction video to hand. Allow half a day before the first litre of water hits the wall. For a tall build the step by step build guide is no luxury.

Delivery van loaded with scaffold parts standing outside a house, the start of your rental period for algae work

Dismantling belongs on your side of the deal too: you take the build apart and lay the parts ready, after which we take them away again. Rinse the tubes and the platforms clean before they go on the stack, because dried algae and cleaner barely come off later. Count out loud while you take it apart, so no brace stays behind under a shrub. What the run out and back costs depends on your province and is listed under delivery and collection charges.

Working safely on a wet platform while removing algae

The mobile scaffolds we hire out are built to EN 1004 and sit in load class 3, where 200 kg is allowed on every square metre of deck. Wet work fills that space faster than you would think, because two people, a full bucket, a jerrycan of cleaner and a hose full of water all add up. Spread that weight over the platform instead of gathering it at one guardrail. What the classification means in practice is set out in the note on the standard.

A few things are fixed and you do not deviate from them. The wheels are braked before you put your weight on the first rung, nobody rides up while the setup is moving, and in strong wind you do not step on at all. At twelve metres you feel a gust sooner than at four, and wet clothing chills you quickly in the meantime. Walk round all four feet after every new position, certainly when the ground has become soaked.

Assembled mobile scaffold with guardrails along a wall, the protected working place for wet algae work at height

The danger that belongs to this job sits under your shoes. A deck with cleaning water on it is slippery as soap, so cover it with anti slip matting or stiff cardboard and swap that layer as soon as it starts to shine. Wear boots with a coarse tread. Keep cables and power tools out of the water and close off the strip below, because a lance or bucket falling ten metres hits whatever stands there. The remaining rules are at the rules for working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for removing algae

1

Start on a cloudy day rather than in full sun. Cleaner that dries straight onto a warm wall has to go on again, and that costs you a rental day better planning would have saved.

2

Always put your bucket on the same half of the deck, on the side you do not walk. At 135 cm of width that is possible, and you never step blind around a full container.

3

Rinse each position off straight away and do not let the cleaner dry on a lane you only reach again tomorrow. Going back to an old position costs you half a day of moving.

4

Cover the planting, the patio slabs and the neighbours' car before the first litre comes down. Whatever you sheet up in advance you do not have to clean at the end of your rental period.

5

Rinse the tubes and platforms with the garden hose as you dismantle. Dried growth and cleaner on the material show up when it is counted and hold up the settlement of your hire.

6

Have somebody below hold the hose while you move. Two minutes of help saves a kinked line under a wheel and a wet streak across the stretch of wall you have just cleaned.

Frequently asked questions

Frequently asked questions about removing algae

Which mobile scaffold do you hire for algae on a tall wall?+

The wide RS52 at 135 cm. On wet work you want a dry half beside your wet lane for the bucket, the jerrycan and the brush, and a narrow deck cannot give you that. The 245 cm platform also gives you walking room past those things. If the wall is only reachable through a gate or an alley, the narrow RS51 at 75 cm is what is left to hire, with less working room as the price.

How does hiring a tower for algae removal work, from booking to collection?+

When hiring you set the build, the working height and your two dates online, and you see the amount including VAT before you confirm. On the chosen day the counted set comes to you. You put it together, clean the wall lane by lane and move the setup yourself. When the work is done you take everything apart, rinse the parts and stack them together, after which we take them away.

How many rental days does removing algae from a whole elevation take?+

For a wall of three storeys you hire the tower four to seven days. That is not down to the spraying but to the number of moves and to the soaking time of the cleaner. Each position covers a good two metres of width, so count your wall width and divide by 2.45 for an indication. Doing several elevations, hire for longer in one go instead of booking two short periods.

What does it cost to hire a wide tower for algae work?+

The rental price follows the build and the height you need, and the trip out and back has a fixed rate per province. Everything is shown including VAT on the prices page. On a job of several days like this the structure works out well, since after the first twenty four hours each following day counts for only a fraction. One unbroken period is by far the cheapest way to book this job.

What working height do you hire for algae on three storeys?+

Reckon on 8 to 12 metres of working height, with the platform between 6 and 10 metres. Measure from the paving to the highest spot where growth still sits, and on this job that is almost always the band just under the gutter. If an overhang projects, count its depth. Check as well whether you can still get up under that overhang with a pole. Which tower belongs to which reach is on the working height page.

Is the tower delivered, or do you collect it yourself when hiring?+

Delivery is the practical choice on this job, because a build up to twelve metres consists of many parts and will not go in a car. We put the complete tower down on the date you entered and take it away after your last working day, for a fixed amount per province. Collecting yourself is possible by appointment and free of charge in Amsterdam, at Zeeburgerpad, if your transport takes the frames.

Do you put up the tower when it is hired for algae work?+

No, that stays your work. We put the complete set down and take it away afterwards, but assembling and dismantling you do yourself. For a tall build you and a second person are busy half a day, and the manual and the video show the order. Plan that build day dry, because starting at height in the rain begins the job badly. We supply no facade scaffolds, system scaffolds or cherry pickers.

What if the algae work overruns and you want to hire the tower longer?+

Report it in time and we will move your collection day, as long as the set has not been promised elsewhere. On this job it often overruns, because soaking and rinsing take more time than people expect and rain turns a day upside down. So book generously from the start. An extra day of hire costs very little, and returning the tower early is always allowed without paperwork or fuss.

How much clear space around the base do you need to hire this build?+

Take the width of the setup and add how far the four stabilisers stick out, and along the wall keep a paved lane free so you can move. On a tall build those feet stand further out than you expect, so reckon on a good two metres each side. Make sure the strip is clear and level before you hire, because shifting a bike rack with a wet tower on it is no plan.

Can you keep the tower on hire when it rains during the algae job?+

The setup simply stays where it is and you only push the cleaning back. In rain the product washes off before it can work, so you waste material. Use such a day for sheeting up, checking the gutter or doing the lower part of the wall, where the rain reaches less. Because you fill in the end date of the hire yourself, a shifted day stays cheap and the tower keeps its place.

Do you get the deposit back after hiring a tower for algae work?+

Yes. The deposit you pay ahead when hiring is transferred back one working day after the return run, as soon as the parts have all been ticked off. Watch for caked residue here: rinse the platforms and the tubes with the garden hose before they go on the stack. Missing parts weigh heavier than leftover dirt, so count carefully while dismantling. How that settlement runs is in the article on getting the deposit back.

May you work with a pressure washer from the platform?+

You can, but bear in mind the lance pushes back. On a platform 135 cm wide there is room to brace yourself and lean your hip against the guardrail, while on a narrower deck that is harder. Never aim upwards under the roof tiles and keep the hose out of the walking line. On a hired tower it is better to drop the pressure a little and brush more, which saves recoil and damage to the pointing.

Hire a mobile scaffold for removing algae today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.