See your price
Application

Replacing window frames? Choose the right scaffold.

Replacing a window frame means a hole appears in your elevation, and you want that hole shut again the same day. Outside you have to measure, cut the old frame free, level the new one in and finish the joint onto the brickwork, all at height and with two people. So here you hire a narrow mobile scaffold that reaches 6 to 8 metres and stands firm enough to take material on the deck. Below: which scaffold suits, how many hire days this asks and where the pitch goes.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For replacing window frames we recommend the Narrow mobile scaffold.
  • For replacing window frames you hire the RS51: a tower 75 cm wide, with a build that lands somewhere between 6 and 8 metres.
  • The outside work is what needs that scaffold: measuring up, levelling in, sealing the joint with the brickwork and finishing the trim.
  • Plan strip-out and fitting inside the same hire day, because an open hole in a wall does not stand unprotected overnight.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for replacing window frames?

Safe, stable and professional work at height

When you replace a window frame the mobile scaffold becomes your outdoor workbench. You take the opening size on it, check the diagonals, hold the level against the jamb over its full height and afterwards finish the seam between frame and brickwork. That only works if you stand still and flat, with both hands free and tools within reach. On a ladder your measuring point shifts with every movement and there is nowhere for a sealant gun, packers and a driver at the same time. On top of that, two people are usually at such a frame together. Hiring a scaffold for replacing window frames is therefore about stability, load capacity and a deck that material fits on.

  • Standing flat and still while measuring up
  • Room for sealant, packers and power tools
  • Two people at the same frame at once
  • The opening closed again on the same day
Read more about working safely →

Which mobile scaffold to hire for replacing a window frame

The RS51 with a deck width of 75 cm is usually the best pick from the fleet for this job. You set it tight against the brickwork, right beside the opening the new frame has to go into, and that works better with a narrow tower than a wide one. On replacement work there is also always material arriving: a pallet of frames, a skip for the old timber or a van that has to get near the wall. Look at the range on the page with mobile scaffolds out of the fleet.

Unlike decorating, what fits on the deck does count here. You have screws, anchors, packers, expanding foam, a sealant gun, a circular saw and a length of trim with you, and all of it has to fit beside two pairs of feet. The 245 cm of platform length gives you that room lengthways, with the tools laid at the upright side and the zone straight in front of the opening kept empty. That leaves working space around the frame itself, which saves a lot of shuffling while you level in.

Narrow mobile scaffold set close against the brickwork of an elevation, with working space beside the window opening

If the frame sits in a wide elevation where brickwork has to be made good as well, or if three of you are at the same frame, the 135 cm wide RS52 is worth considering. For an ordinary house with a path down the side the narrow version still wins: it slips past the bay and through the gate to the back. As a model the RS51 reaches 14.2 metres of working height, so a frame on the top storey can be tackled with the same tower.

Hiring a working height above the head and the lintel

On this job you measure to above the head of the highest frame coming out. You have to get at the lintel, the brick course and the bit of pointing you close up again after levelling. For a first floor frame in an average house you land on a build reaching 6 to 8 metres. Those numbers come about because you add some 2 metres of reach to the platform height, so your deck lies at 4 to 6 metres.

Pick the build so that you can just reach the top and you have hired too tight. You want to be able to put the deck roughly at sill level, so the frame stands square in front of you, and then hang a platform higher to finish the head joint at eye level. So order one build more rather than one less, because half a metre short shows up exactly when the frame has to be levelled. The builds and their platform heights sit side by side at eight metres of working height.

Mobile scaffold reaching above the upstairs windows of a front elevation, ready for a window frame to come out

Your tape starts at the ground the castors will stand on. A sunken lightwell, a sloping drive or a garden lying lower than the pavement changes your starting point and with it the build. Is the frame to be replaced in a second floor, then add a whole storey. Come out too low and you finish the head joint with your arms stretched, and that is exactly the seal that has to be watertight, or it leaks after the first heavy shower.

Setting the mobile scaffold up beside the hole in the elevation

For this job the pitch involves more than the tower alone. Beside the scaffold you want a clear strip for the old frame coming down, for the new one still wrapped up and for the skip or trailer the waste timber goes into. The stabilisers take their own room splaying outwards, so count on a run along the wall that nobody has to pass through while you are busy. You keep that run free from the day you have the mobile scaffold delivered.

The ground counts double here, because a fair weight ends up on the deck. Setts, concrete or slabs carry that without trouble; fresh garden soil, a gravel bed or a newly laid drive sink under a loaded tower, and then your level no longer reads what it read an hour earlier. If the ground is not flat, use sole boards and check the setting again before you start measuring. There is more on that at setting up on sloping ground.

Stabilisers under a built mobile scaffold, claiming the space beside a wall for the frame and the skip

Think about the inside of the house as well. The old frame usually comes out inwards, and the new one often goes into the opening from inside, so the route through the room counts as much as the clear strip outside where the tower stands. So do not put the scaffold dead centre in front of the opening but slightly to one side, so you can guide from the deck while the frame can swing out past the upright.

How many hire days a window frame replacement really takes

Per frame, working in twos, you are busy about a day: measuring and preparing, taking the old frame out, levelling and fixing the new one, foaming and closing the outside joint. With three frames coming out you work towards three full days, and you do not want to plan those back to back without margin. So book the mobile scaffold from a day before the first strip-out, and keep a day of slack at the end of your hire period.

The waiting sits mainly in the finishing. Foam has to cure before you can trim it, sealant needs time before you may paint over it, and fresh pointing you leave alone until it has pulled in. Those hours run inside your hire period just the same. Rain is the biggest risk here, because an opened wall and a fresh seam do not go with a heavy shower. So plan the strip-out day in a dry window and keep a day in hand.

Built mobile scaffold along a side elevation, staying up until the joint around the new frame is finished

Those extra days hardly weigh in the cost. The full rate covers only the first 24 hours, and every following hire day is reduced by 95 per cent. Book tight and you run the risk of the scaffold being collected while the last joint has not been finished, and then you are balancing on a ladder over a half sealed seam after all. What hiring per model and per build comes to you will find including VAT at our rental prices, well before you undo the first screw.

Which mobile scaffold suits replacing window frames?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

A window frame with glass on a 245 cm platform

A frame a metre and a half wide with double glazing in it soon weighs sixty to eighty kilos. You do not lift that over a guardrail, and you do not have to: the new frame nearly always goes into the opening from inside, while you guide, level and fix from the deck. Want to do it from outside anyway? Then take the glass out first and bring the frame up empty. Without glazing that halves the weight, and you feel it at once.

So you use the 245 cm deck mainly as a bench beside the opening. That is where the packers, anchors, screws, sealant gun and a piece of trim lie ready, and that is where the second person stands holding the frame in place while you read the level and adjust. Keep the strip straight in front of the opening empty, because the frame has to be able to tilt through there. Anything lying there is in exactly the wrong place when it matters.

Mobile scaffold with a 245 cm platform beside a house, the working deck next to a frame due for replacement

Count on one pitch per frame and on more repositioning than you expect. You go along to measure, you stand there during the fitting and you come back for the sealing and the trim, so per frame you are on the same spot three times. Take the tools off the deck before you roll and lock the castors again afterwards. If decorating follows, painting the new frames joins onto this work seamlessly, from the very same pitches.

Hiring a mobile scaffold delivered for the day of strip-out

What reaches you from the fleet is a counted set of loose parts, out of which you build a tower yourself. Decide beforehand where that stack may end up and make sure the spot does not clash with the room for the new frame or the skip, because you will need all three at the same time. Order it on a working day, before the clock reaches 15:00, and your set stands on the drive the next working day, well ahead of the strip-out.

You pick the delivery date and the pick-up date, and on replacement work you deliberately set that delivery a day before the strip-out. You do not want to open the wall while the tower is still lying in parts on the grass. For the assembly put the manual and its video ready; two people have the tower up in half a day and can then check the existing opening size straight away. That way the strip-out day starts with a pitch already at the right height.

Scaffold parts on the pavement beside a house, ready to be built up for the day of the strip-out

As soon as your hire period ends we come to collect the parts, once you have taken the tower apart and laid everything out complete. Do wait with that until sealant and pointing have had their time, because a tube scraping past a fresh seam pushes it straight out again and then that piece is yours to redo. Count the parts as you stack them and you know the set is right. The fixed transport costs for your province sit at the delivery rates.

Safe replacement of window frames on a hired mobile scaffold

Replacing a window frame is where the load capacity of the deck really comes into play. A platform may carry 200 kg per square metre, precisely what load class 3 within EN 1004 lays down, and with two adults, a box of tools and a piece of frame you are nearer to it than on any other frame job. Spread the weight over the full length instead of putting everything at the same upright, and bring material down as soon as you no longer need it.

The standing rules weigh heavier on this job than usual. Lock the castors before anyone climbs on, never move the tower with tools or people aboard, and stop work in a strong wind, certainly when a loose frame is standing on the deck catching the wind like a board. Check after every move that the four stabilisers make firm contact, because a loaded tower standing out of true you only notice once you are lifting.

Mobile scaffold erected tight to a brick wall, a free standing ladder next to it, deck rated for 200 kg

The risks that belong specifically to this work come from below. What falls here is not a brush but a length of timber, a chisel or a shard of glass, and it lands on the path someone has just walked along. Cordon off the zone under the opening with tape or a warning sign, even when you are only off the scaffold for a moment. Work in gloves once glass is involved, and keep the deck clear of offcuts. The further rules stand at working at height and its rules.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for replacing window frames

1

Take the opening size from the platform of the hired tower and not off a ladder. Diagonals a centimetre apart show up only when you stand still and square in front of the opening.

2

Lay the new frame under a sheet exactly where the supplier set it down. Moving it takes two people, and a slippery surface under the scaffold is not something you want as well.

3

Hang a bucket of screws and anchors on the guardrail rather than standing it loose on the platform. That keeps the strip in front of the opening clear at the moment the frame goes in.

4

Have board and screws ready in case it goes wrong. If the fitting runs on past dark, you close the opening off and carry on with the joint the next hire day.

5

Trim the expanding foam only once it has genuinely cured. Until then use the tower for the trim at the top, so you do not have to make an extra pitch for it.

6

Ask the frame supplier for a delivery day that falls before your strip-out day. A hole in your wall waiting on a lorry is the most expensive delay of the whole hire period.

Frequently asked questions

Frequently asked questions about replacing window frames

Which mobile scaffold to hire for replacing a window frame?+

In most situations you hire the RS51, with its deck 75 cm wide. You put it tight beside the opening in the wall, it passes a gate or a narrow path, and two of you move it without fuss. Even so, the wider RS52 makes sense if brickwork is being made good as well or if three people are at the same frame. Either way you want a tower that stands steady enough to level a frame from.

How does hiring a mobile scaffold go when frames are being replaced?+

Online you set down which model you want and how high it gets built, you pin the day the parts turn up and the day they go, and you settle a fixed amount including VAT. The parts are then dropped off, you build the tower beside the opening in the wall, and afterwards you put it back dismantled and counted. Plan the delivery well before your strip-out day, because without a pitch you do not start.

How many days must you hire a scaffold to replace window frames?+

Reckon on roughly a day per frame when two of you work, plus a day to build the tower and a day of slack. For three frames in the same front that brings you to four to five days of hire. Curing of foam, sealant and pointing falls inside that period, so count those hours in. For a single frame on the ground floor two hire days will often see you finished, provided the material arrived on time.

What does the hire of a mobile scaffold cost on a replacement job?+

The rental price hangs together with the model you take and the height it is built to, with a fixed transport amount on top that differs per province. The way the days divide up suits this job: only day one weighs fully, and the days you add behind it barely show in the total. Because an open wall cannot wait for a new booking, hiring generously straight away is wiser than arranging a second period afterwards.

Which build height should I hire for a frame one storey up?+

For a frame a storey up you come out on a build that reaches 6 to 8 metres. Measure from the ground under the castors to above the head, because the lintel and the pointing above it belong to the work as well. The page with working heights lists the platform height for each build, so the tower ends up at exactly the right level beside the opening in the wall.

Is delivery possible when you hire a mobile scaffold for this job?+

Yes, and on replacement work that is worth recommending. The set is brought on the day you chose and picked up again when you have finished, at a rate fixed per province. Collecting it yourself is free and goes by appointment; the address for that is Zeeburgerpad 89 in Amsterdam. Bear in mind, though, that your van will probably be carrying the new frame that day, and a load of scaffold parts will not fit beside it.

Do you build the tower yourself after hiring, or do we do it?+

Yes, that building lies entirely with you. The parts arrive complete and counted, and with the supplied instructions beside you two people put the tower up in half a day. That fits your preparation nicely: on that same day you check the sizes of the opening and lay the material out ready. We supply no facade scaffolds or cherry pickers, so for work like this the mobile scaffold is the answer.

What if the fitting overruns and I have to hire the scaffold longer?+

Pass it on as early as you can and we shift your collection date, provided that tower has not been promised to somebody else. Overrun happens often on replacement work: the sizes turn out other than expected, brickwork needs making good or the forecast spoils it after all. Close the opening off with board in that case and carry on calmly the next hire day. Handing it in early is allowed too, if it goes better than feared.

How much clear space does the pitch ask on a replacement job?+

Add the splay of the stabilisers to the 75 cm of width, and lay a strip beside it for the old frame, the new one and the waste timber. In practice a clear run of three metres along the wall works best. Clear plants, bikes and the wheelie bin before the mobile scaffold is delivered. Having to shift a loaded tower halfway because something is in the way costs you more time than tidying up beforehand.

What do you do with the opening in the wall if it rains?+

That is why you work with board and sheeting within reach. An opening you cannot close the same day you board over with a panel screwed on from the platform. Fresh sealant and foam will not take driving rain either, so rushing in drizzle only creates repair work. The tower meanwhile just stays standing, so the next morning you carry on where you left off. Because you choose your own end date, that usually costs one extra hire day.

Is there a deposit when you hire a scaffold for frame replacement?+

Every booking carries a deposit. Once the returned tower has been counted and found in order, the refund follows within 1 working day. On this job you watch mainly for damage: sealant, foam and sawdust do not belong on the decks, and a batten sawn through on the platform leaves its marks. Lay an old board down as a working surface and sweep the deck at the end of each hire day.

Can the opening in the wall stay open overnight?+

Better not, and you set your hire period up accordingly. Plan strip-out and fitting on the same day, so the new frame is in by dark. If that does not work out, you screw a panel over the opening from the mobile scaffold and cover the sill against rain getting in, something you can barely manage properly off a ladder. So when booking, count on a day too many rather than too few.

Hire a mobile scaffold for replacing window frames today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.