See your price
Application

Replacing an insect screen? Choose the right scaffold.

Replacing an insect screen is a quarter of an hour per window, but it sits four or five metres up and you have to get there twice: once to measure the rebate and once to fit the new frame. For that work you hire the Altrex MiTower, a one person scaffold 75 cm wide, raised to a working height in the 4 to 6 metre band, which you put up and roll along entirely single handed. Below you can read how to shift it along the elevation from window to window.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For replacing an insect screen we recommend the 1-person scaffold.
  • To replace an insect screen on the first floor you hire the MiTower, a light one person build of 4 to 6 metres.
  • You are only up there briefly per window, so the number of moves along the elevation is what sets your pace here.
  • The rebate gets measured from the platform, so take a tape and a notepad up with you on the very first climb.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for replacing an insect screen?

Safe, stable and professional work at height

On most facade jobs you finish a large face and shift now and then. With screens it is the other way about: the work per window takes ten minutes and the rest of the day you are shunting along. That changes what matters when you hire. Deck area is not the thing; the weight of the build is, and how quickly you can get it into place single handed. On top of that the sizes of the new frame are only settled once you have measured up top, so as a rule you make two rounds past the same windows. Hiring a scaffold for replacing insect screens is therefore about moving, about one person use, and about the order of measuring and fitting.

  • Short work per window, many short moves
  • One person build that you roll along alone
  • Measuring and fitting in two separate rounds
  • Reach to six metres at a loft window
Read more about working safely →

Which scaffold to hire for replacing an insect screen

For screen work the Altrex MiTower is the model that fits. That is a slim scaffold 75 cm wide, made for a single person, with a working height running from 4.2 to 6.2 metres. The one person layout is not a limitation here but the whole point: fitting a screen you do alone, and the frame is passed up by somebody who stays on the ground. What the model can do and where it stops is on the page about MiTower hire.

What you notice most on this job is the weight. You shift the build at every window afresh, sometimes six or seven times in an afternoon, and then every kilo you have to push along a garden path counts. A heavy construction with a lot of deck boards costs you minutes per move that you do not spend on the screens themselves. Besides, you need very little space up top: a tape measure, a screwdriver and the frame.

Narrow scaffold built up against a house wall with windows, the pitch you shift along per opening

If you also mean to paint or tackle the gutter that same week, an ordinary mobile scaffold with a 245 cm deck is worth weighing up, if only because two of you may stand on it and it holds more material. For screens on their own that is overkill: you would end up dragging parts to every window that never once get used. Which of the two suits your work is set out in the comparison between these models.

Working height to hire for screens on the first floor

The point you have to reach is the head of the frame, because the clips or the rail the screen drops into sit there. At a window on the first floor that lies around four metres; at a loft or dormer window it climbs to six. Working height here means your platform height added to the roughly two metres you still reach over it standing. Look at the build behind six metres of working height and you can see how many parts that takes.

Start your measurement at street level or on the garden path where the castors will actually stand, rather than on the doorstep at the front. A planted strip along the wall often sits a step lower and a drive falls away towards the road, so half a metre of build goes astray that way. Walk past every window before you reserve as well, because the highest one sets the build you hire, even where the others sit a good deal lower.

Scaffold built up in front of a house to above first floor level, the height a window with a screen sits at

Standing too low is more of a nuisance on this job than it sounds. You have to tilt a frame into a rebate with both hands and work the clips at the same time, and that is impossible above your head. Nor can you see the top rebate then, and that is exactly where you have to check the frame beds down everywhere. So take a build on the generous side. That goes doubly for a window on the second floor.

Hiring a MiTower and standing it under the screen window

Below a window there is rarely a flat, empty spot. A shrub grows there, a planted strip runs along, a cellar entrance juts out or the pavement falls away to the gutter. So work out per window where the four feet land before you hire the scaffold, because on screen work you do not set it down once but six times over. A place that works perfectly for the first window may come out on an inspection cover at the third.

The stabilisers have to go fully out here as well, even though you are up for ten minutes only. Precisely on short work the urge to leave them half in is strong, since you will be moving on again shortly, and that is where it goes wrong on screen jobs. If a foot sinks into a border, put a paving slab or a thick plank under it before you climb. What that involves is described in the guidance on stabilising.

Folded out stabilisers beneath a narrow scaffold, which have to go fully out again at every window

Think about the route too. You take the build around the house, past the bay, through the gate to the back garden and back again. Walk that circuit beforehand with a tape and see where it narrows below the width of the scaffold. Clear away the bikes, the wheelie bin and the coiled hose on the same round, because otherwise you run into them again at every following window and it costs you minutes each time.

How many days to hire a MiTower for screen work

Count screen work in rounds rather than in hours. The first round is the measuring round: you go past every window, take the rebate at three points across the width and the height, and note per window whether it is a fixed screen, a roller screen or a screen door. The second round is the fitting round. Six windows therefore means twelve pitches, and together that fills a good day once you count the build and the strip down.

What happens between those two rounds decides your rental period. Frames made to size are not always in straight away, and until you have them the fitting round cannot go ahead. So you can do one of two things: leave the scaffold standing on site until everything is in, or else hire it twice over for a short spell. If painting or a gutter is on the list in that same stretch, carrying on is nearly always the calmest and the cheapest call.

Built up scaffold beside a house with windows, standing as it does between the measuring round and the fitting

Carrying on is not expensive either. The full rate is charged over the opening twenty four hours alone; from there each further day of hire is billed at 95 per cent less, so holding on climbs nowhere near as fast as you would think. That makes the gap between two separate periods and one continuous one considerable, because paying twice for a first day mounts up. Work both variants out on the page with the tariffs before you fix the delivery and collection.

Which mobile scaffold suits replacing an insect screen?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Measuring and fitting an insect screen from the platform

Measuring is done up top, because from the ground you always misjudge a rebate. Take the width at three heights and the height at three points across the width, and note the smallest figure per window. Old frames are seldom square, and a screen two millimetres too generous will no longer clamp. Write down at the same time which side the hinge has to go on, and whether the casement in question swings outward or inward.

The fitting itself is short work. You take the old frame out, clean the rebate, fix the clips or the top rail and click the new screen in. Have someone pass the frame up from below rather than carrying it under your arm, because on the ladder you need both hands. On the MiTower you are up there on your own, so that second person stays on the ground in any case and hands things over.

Scaffold with a platform and guard rails along a side wall, the standing place you measure a rebate from

Moving takes most of the time here. With six windows you are twelve times busy with brakes off, stabilisers in, shunt along, out again and back on the brake. Allow a couple of minutes for each. Take everything you need up in a bucket, because for one forgotten screwdriver you otherwise climb all the way down and all the way back. If you want the glass behind it done at the same time, look at washing windows for the approach.

MiTower hire with delivery for a round of the windows

The scaffold arrives in parts, complete and counted, and so not as a finished thing you only have to stand upright. Pick a place in advance where those parts may lie: the drive, the garage or a corner of the front garden, but on no account right under the first window you want to start at. Have the booking in place on a normal working day ahead of 15:00, and the van comes by a day later with the whole set.

The day it comes and the day of the return trip you enter yourself in the reservation. On screen work that helps more than it sounds, because you often want to do the measuring round earlier than the fitting round. Build the scaffold yourself with the manual and the instruction footage beside you; a one person model goes up single handed, and that is exactly why this type suits short jobs. Allow half an hour, at a moment when you need not press straight on.

Delivery van with which scaffold parts are brought out, the drop you plan a day before your measuring round

Once the last screen hangs you strip the scaffold down and carry the parts back to where they were dropped; on the day you marked we come past to collect them. Count them off as you dismantle, and you can be certain that no clip plate has been left lying behind in a border somewhere. What bringing and fetching come to together varies by province; you can read that amount back under the cost of delivery.

Replacing an insect screen safely on a hired tower

The MiTower is a scaffold for one person, and its deck may hold up to 200 kg per square metre under load class 3 of the standard EN 1004. On screen work you sit well below that, even with a frame and some tools in hand. Do not let that tempt you into climbing up with two of you anyway, because that is not what this model was built for. More on what a deck will take is at loading and weight of a scaffold.

The ordinary conditions stand, even on a job of ten minutes per window and even where the scaffold is standing low. Brakes locked before you climb, nobody and nothing on the platform while you shunt along, and stop as soon as it starts to blow. That wind is a genuine point here: a screen door or a large roller screen works like a sail the moment you lift it, and at four metres up you feel that in your balance at once. Better to wait an hour.

MiTower built up in a narrow passage with a separate ladder against the brickwork, a scaffold for one person only

The risk on this work is its own brevity. Because you are only up briefly, people skip steps: stabilisers half out, the frame propped loose against the rail, a stretch to the next window instead of moving. Keep the zone directly beneath you clear of people at all times, because a falling screen frame with an aluminium edge is sharp and light enough to plane away sideways. Every requirement is listed at working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for replacing an insect screen

1

Number the windows with tape on the glass before you begin measuring. Your notepad then holds six sets of figures that you will not mix up later, once the frames arrive made to size.

2

Take a bucket or a tool bag up with you instead of loose items in your pockets. Across twelve pitches on one elevation that saves you a handful of descents for a forgotten screw.

3

Measure the narrowest point on the way round the house before the scaffold is hired. A gate of seventy centimetres decides whether you can keep the build whole or have to strip it each time.

4

Photograph every old screen before you take it out, clips and corners included. From the ground you will not remember afterwards how exactly that frame sat in the rebate and which way it faced.

5

Do the measuring round on a still morning and plan the fitting separately. Lifting a frame at height while it blows is precisely the moment you would rather not be standing on a scaffold.

6

Combine your rental period with cleaning the frames and the glass. The pitch is standing there anyway, and per window that costs you five minutes extra where otherwise you would have to hire again for it.

Frequently asked questions

Frequently asked questions about replacing an insect screen

Which scaffold should you hire to replace an insect screen?+

Pick the MiTower: 75 cm wide, made up for a single person, and with a reach running from 4.2 to 6.2 metres. That matches screens on the first floor and in the loft. More important than the deck size is that you can build and roll this scaffold alone, since you shift it afresh at every window. If you are also working on the elevation that week, it may pay you to hire a mobile scaffold, the wider sort, and cover both jobs from it.

How does hiring a MiTower for a few screens work?+

Online you put the model and the build height together, mark the day of arrival and the day of the return trip yourself, and see the fixed price including VAT immediately. We bring the counted parts, you build the scaffold, measure the rebates and fit the frames later. Afterwards you lay the dismantled parts together and we drive them away again. The only thing you have to line up is when the made to size screens come in.

How many days do you have to rent to replace all the screens?+

For a house with five or six windows a single day is enough, at least where the frames are already waiting. If you have to measure first and order afterwards, days sit between the two rounds. You can then leave the scaffold standing or hire it twice briefly. Because every extra rental day counts for so little in the total, most people choose to let the build stand until the last screen hangs.

What does it cost to hire a MiTower for such a short job?+

The rental price follows from the build height, the model chosen and the transport to your address and back. You see those figures including VAT before confirming the reservation. On short work in particular it helps to know that the first twenty four hours weigh by far the heaviest and that each following day adds little more. Two separate short periods are therefore nearly always dearer than hiring once continuously.

Which working height should you hire for screens on the first floor?+

For a normal window on the first floor you are well served by 4 to 6 metres of working height; for a loft window or a dormer take the top of that range. Measure to the head of the frame, because the clips sit there. Begin your measurement at street level or on the garden path where the castors will stand, since that is where the build starts. The highest window on the elevation decides the working height you specify when hiring.

Is the MiTower delivered, or can you collect it from the hire depot yourself?+

Both are possible, and it depends on your transport. With delivery the parts are ready on the day you chose and we take them away again after the last screen; a fixed price per province applies. If you would rather drive, you are welcome to load the set at Zeeburgerpad in Amsterdam, by arrangement and at no charge. Because this is a compact scaffold, such a set fits in many people's cars.

Does the MiTower come built up when you hire it?+

Not that: we deliver the parts and you assemble them yourself. With this model that is no great matter, because it was designed to be put up by one person, and with the manual and the footage beside you it is standing within half an hour. Striking it at the end is yours as well, after which we come to collect the scaffold. Count that build time in when you plan your measuring round.

Can you rent for longer if the screens arrive later than expected?+

Yes, and on this work it happens regularly. Let us hear about it the moment you know, and the collection day moves with you, provided the scaffold has not already been booked for another customer. Because a day more of hire costs a fraction of what the first day does, carrying on is usually handier than striking the build and reserving again later. Handing back early is naturally fine too, so a generous margin costs you little.

How much room has to be free under the window when you hire?+

Start with how wide the build is, count on what the stabiliser legs claim to left and right, then keep walking room beyond that to get past. Under a window there is often a shrub, a strip of planting or a sloping cellar entrance, so walk past every window before the hired scaffold is delivered. Clear the bikes and the wheelie bin on the same round, because on screen work they stand exactly where you have to move to.

May two people stand on the MiTower you are hiring?+

No, this model is made up for one person and you hold to that, however solid the deck feels. When you are replacing a screen that is no problem: the one below hands the frame up and you set it in the rebate. If you do want to work up there in pairs, you end up with an ordinary mobile scaffold and a longer platform. In that case look first at what else you want doing on the elevation.

Do you get your deposit back when you hire a MiTower for screen work?+

A reservation carries a deposit. As soon as the screen job is over, the set comes back and everything has been counted off, that sum stands returned within one working day. On this work watch the small parts above all: a nut or a clip plate vanishes into a border easily when you are moving on at six windows in a row. Go over the hired scaffold at each window and never leave tools loose on the platform or the rail.

Do you have to hire twice, once for measuring and once for fitting?+

You do not have to, and usually you would not. Where the frames come in quickly you leave the scaffold standing between the two rounds, braked and with the stabilisers out. If it takes longer, two short periods are an option, though you then pay twice for a first day and twice for the transport. Compare both ways calmly before fixing the rental period, because it tells noticeably in what you end up paying.

Hire a mobile scaffold for replacing an insect screen today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.