See your price
Application

Installing a roof hook? Choose the right scaffold.

Installing a roof hook is little material and a great deal of precision. The hook has to bite into the roof boarding or a purlin, so you lift a few tiles, screw the plate down and lay the roof back neatly afterwards. The place such a hook belongs sits high, usually just below the ridge, and the only way there is over the roof edge. On a house of two or three storeys that means hiring a wide mobile scaffold reaching 8 to 12 metres of working height. Below is the build that suits it.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For installing a roof hook we recommend the Wide mobile scaffold.
  • For installing a roof hook you hire the RS52, because at this height you want a wide foot under the build.
  • The top of the build comes level with the roof edge, since that is where you step across onto the tiles.
  • Two hire days usually do: half a day building, a morning for the hooks, and time to close the roof again.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for installing a roof hook?

Safe, stable and professional work at height

Installing a roof hook takes half an hour, but the route to it decides what you hire. The hook belongs high up, often just under the ridge, and you have to get there with a cordless driver, screws and the plate itself. The mobile scaffold is your access on this job: you build to just short of the roof edge, step across onto the tiled roof and carry on upwards from a roof ladder. Hiring a scaffold for installing a roof hook is therefore not about deck area but about gaining height, a foot that stands firm and one calm moment of stepping over. Everything needed above goes up in one trip, because nobody descends ten metres twice for a forgotten screw.

  • Access to the tiled roof over the roof edge
  • Reaching a high point just below the ridge
  • Working height 8 to 12 metres for roof hooks
  • A wide foot because the build gets tall
Read more about working safely →

Which mobile scaffold to hire for installing a roof hook

The model for this job is the Altrex RS52, the wide version at 135 cm that reaches up to 14.2 metres. At eight to twelve metres the size of the standing area counts for more than it does on low work: the taller the build, the more you notice that a wide foot gives less when you put force behind a screw up top. That steadiness is what you want at the moment you are holding a roof hook in place. The full range sits on the page with mobile scaffolds for hire.

The deck of 245 cm gets used differently here than on wall work. It is mainly your base: the roof ladder lies on it until you push it up the roof, your tool bag stands there, the roof hook and its screws are laid out ready, and there has to be room left for two people to pass each other. At 135 cm wide you can also crouch calmly at the edge while the other passes material up, which saves a lot of twisting when you line the plate up.

Wide mobile scaffold erected beside a house, its top deck at the height where you step onto the roof

The narrow RS51 will reach the same height, but then you hand in that stable foot and have hardly any room to step across. A MiTower is out here in any case: it stops at 6.2 metres and is meant for working on your own, whereas roof hooks are a job for two. So do not confuse the model with the build; how high you go is something you choose when you hire, separately from the width.

Hiring 8 to 12 metres of working height for roof hooks

Your measuring point here is not the hook itself but the roof edge where you step across. From there you walk up the roof, so the build need not reach the ridge. With the gutter of a two storey house at seven or eight metres, you land in the 8 to 12 metre class, with the deck between six and ten metres. On top of the platform height comes your own reach of roughly two metres, and that difference is exactly why the ridge may stay outside your build.

Look at the shape of the roof while you measure. A steep pitch puts the ridge far above the gutter, and then the distance you cover over the tiles is greater than the height you hire. A shallow roof brings the point closer. Measure as well how far the eaves project, because a wide overhang pushes the scaffold a good way off the wall, and that distance costs you height again at the moment you step across.

Mobile scaffold built up a front elevation as far as the roof edge, the height you step onto the tiles from

Choosing too tight punishes you immediately. Come out half a metre under the gutter edge and you have to pull yourself up to get onto the roof, and nobody wants to do that with a drill in the bag. Rather take the level where the top deck finishes flush with the gutter or a shade above it, so that you step straight across without hauling on anything. The page on twelve metres of reach shows what build that takes.

Where the hired mobile scaffold stands when fitting roof hooks

A build of ten metres makes stricter demands on the spot than a low one. The bearing area under the four feet is small and the load on each foot large, so you look for setts, paving slabs or a made up driveway, and not fresh topsoil or a newly laid grass path. A difference of a couple of centimetres between two slabs you correct at the bottom, because up top it works out into a lean you notice when you step onto the roof.

With roof hooks you often end up on the street side, because that is where the elevation with the most accessible roof lies. Talk to the neighbours about a parking bay and tell the council what part of the pavement gets taken. Keep all four stabilisers fully out; at this height that is not a luxury but the reason the build stays upright. How to deal with sloping or soft ground is set out in the guidance on stabilising.

Scaffold components stacked in the street before the build, on the kind of hard surface a tall build asks for

Finally, look up before you start building. At this height sit the things that play no part in low work: the service cable into the house, a satellite dish, a tree hanging over the roof. Work out as well exactly where you want to come out at the roof edge, because that point fixes the standing position. If the roof hook belongs above a bay window, you set the scaffold a few metres to one side and climb diagonally up the tiles to where it goes.

How many hire days a roof hook job needs

The screwing is soon done; the rest is not. A build up to ten metres takes two people half a day, and taking it down takes another. In between sits the real work: lifting tiles, lining the plate up on the purlin or the boarding, fixing it and laying the roof watertight again. For a single roof hook you are finished within two hire days, and if several hooks go on different roof planes, count at least half a day extra for each plane.

What steers the planning is the weather. At ten metres it blows harder than at four, and wet tiles are no surface to walk on, so you want to be able to pick out a dry, still half day. Do not reserve exactly the days the work takes, then, but hire a margin in which that quiet half day falls somewhere. Losing a day to conditions is the rule rather than the exception on roof work, and certainly so in autumn.

Frames leaning by a black front door, the delivery that opens and closes a roof hook job of two days

Financially that need not stand in your way. The opening twenty four hours carries the cost of this hire; anyone who sticks days on after it sees very little added, thanks to the 95 per cent discount. A margin of two days therefore costs next to nothing, while having to hire again means putting a whole build like that up for a second time. More on judging a hire period for roof work is in this piece on hire days.

Which mobile scaffold suits installing a roof hook?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Fitting a roof hook from the platform at the roof edge

On this job you shift the build almost not at all. You build at the point where you want to get onto the roof, do your work there and take it down again. That makes the preparation more important than on jobs where you move along every two metres: anything you forget you fetch again from ten metres lower. Lay the roof hook, the right screws, the cordless machine, a spanner, a few replacement tiles and your roof ladder ready on the deck before the climb starts.

You step across from the top deck, not from an intermediate level. Push the roof ladder up over the tiles first and hook it over the ridge, then go yourself and have your tools passed up or hauled up in a bag. Never climb over the guard rail with loose items in your hands. On the deck of 245 cm there is room enough to work through that order calmly, even with two of you up there.

Tower assembled at one fixed point beside a brick wall, the single position a roof hook job is built around

If two hooks are going in far apart, the question is whether you slide across the roof or move the build. Going over the roof is quicker as long as you can rehang the ladder; if the second hook lies on another roof plane, you dismantle and build again. Work that out beforehand, because it decides whether two days are enough when you hire. Replacing a few loose tiles fits into the same set up.

Hiring a mobile scaffold with delivery for a roof hook day

A set for ten metres consists of a fair number of parts: uprights, braces, decks and the stabilisers, all complete and counted on the docket. Reckon on a stack you cannot simply tuck into the hall, and point out in advance where it may lie without blocking the way to the front door. An order lodged by 15:00 on a working day sends the package your way the next working day; you name the drop off day and the collection day yourself.

Building it is your work, with the manual and the instruction video as your guide. If this is your first build this tall, allow a generous morning and do it with two of you: one passes up, the other builds from the inside. So let the drop off fall a day before your roof day, so that you are not building and fitting at the same moment. What the run to your province costs you can see under the charges per province.

Complete set of scaffold parts delivered on site, the stack from which you build up towards the roof edge

At the end we take the mobile scaffold away again. You dismantle, stack the parts together by type and set them down where a van can pull up alongside without manoeuvring; we load it. Do that dismantling in daylight and not in the dusk after a long day on the roof, because the upper parts want passing down with attention. If a tile or a piece of tooling is still lying on a deck, take it off first.

Fitting a roof hook safely on a tall mobile scaffold

The decks under you are made to EN 1004 in load class 3, which allows 200 kg of load on each square metre of deck. On roof hooks you go nowhere near that limit, because you take little up. What does count is the height: brake the castors before you step up, never move the build while somebody is on it or tools lie on a deck, and stop in a wind that has you bracing yourself up there. What the standard prescribes exactly is explained in the notes on this scaffold standard.

The most dangerous moment of this job is the step from the deck onto the tiles and the way back. Do it with empty hands, on a dry roof and with the roof ladder already hooked over. Do not walk loose across the tiles to have a quick look at something, not even when it seems only a metre. And bear in mind that the hook you are fitting is a safe anchor point only once it is fixed and the material around it has been made good.

Checked and complete set of scaffold parts set out, as you receive it for work on a roof hook

Below you it has to stay empty. A tile you lift and put down for a moment slides away easily, and from ten metres it arrives with force. Fence off the zone around the foot with whatever you have: cones, tape or a car that can no longer get past. Warn the neighbours on the day itself, certainly if their driveway falls within that area, and do not work above a path people keep walking along.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for installing a roof hook

1

Find out where the purlin or the roof boarding actually runs before you hire. You do not want to discover at ten metres that the roof hook has to go half a metre sideways and your build stands wrong.

2

Take two spare roof tiles up with you. One tends to snap while you are lifting them, and for that single tile you will not want to walk back down the ladder and the whole build.

3

Haul your tools up in a closed bag on a line run alongside the build. That beats climbing with a full bag and it leaves both of your hands free for the ladder.

4

Check the forecast before you fix your hire days. A dry, still morning is worth more on roof work than two generous days in the diary that fill up with nothing but rain.

5

Keep the roof hook and its screws in a tub with a lid. On a pitched roof a loose screw rolls into the gutter within a second and then it is gone for good.

6

Mark the point where you step across onto the tiles with tape on the guard rail. Coming back with a full bag or in poor light, you will not be hunting for where the ladder hangs.

Frequently asked questions

Frequently asked questions about installing a roof hook

Which mobile scaffold should you hire to install a roof hook?+

The wide RS52 is the one to hire here. As soon as you head for eight or twelve metres you want a generous foot under the build, and up top you need room to handle a roof ladder and to stand at the edge with two of you. The narrow version reaches the same height but gives you less calm at the moment you step onto the roof. Even for one single hook, the wide build stays the safer way to hire.

How does hiring a scaffold for roof hooks work in practice?+

You choose the model and reach online that suit your gutter height, so a wide tower here, set a delivery day and a collection day beside it and pay in advance, VAT included. The parts get set down on the pavement, you build up to the roof edge, fit the hook and take everything down afterwards. We come round later to collect it all. Just do not put the build day and the roof day on the same date, since both want half a day.

How many days do you need to hire to fit roof hooks?+

Two days is realistic for one hook: half a day building, a morning working and then dismantling. If more hooks go on different roof planes, count half a day extra for each plane and sometimes a second build. Because roof work depends on dry and still weather, it pays to hire a spare day on top of that. On a day it blows you will not get onto this roof, however good your planning is.

What does hiring a tall mobile scaffold for this job cost?+

The price follows from the width and the height you need, plus the drop off and collection to your region. All the amounts, VAT included, are on the page with hire rates. A tall tower costs more than a low one, which stands to reason, but the rental price mainly climbs when you book two separate periods instead of one. For a roof hook on two separate roof planes you therefore plan consecutive days.

Which working height should you hire if the roof hook sits by the ridge?+

You hire a mobile scaffold up to the roof edge and not up to the ridge. From the top deck you step onto the tiles and carry on upwards with a roof ladder, so the gutter height is your measure. On a two storey house with a pitched roof you usually land on 8 to 12 metres. Your zero is the paving under the castors, your end point the underside of the gutter; the overview of working heights shows which build fits.

Can a set this tall be delivered, or do you collect it yourself when you hire?+

Delivery is the obvious route when you hire a set this tall. A build for ten metres is a serious load and it rarely fits in an ordinary car, while dropping off and collecting together come at a fixed amount per province. If you would still rather do it yourself, the set stands ready at no charge by appointment at Zeeburgerpad in Amsterdam, provided you turn up with a long van or a trailer. For a day of roof hooks most people have it brought.

Do I build the hired mobile scaffold myself for roof hooks?+

Yes, assembly falls to you. You get a counted set with a manual and there is a video showing the order of work, but the hands are yours. At this height you work with two people and build from the inside, layer by layer, with the guard rails going up as you go. We do not come and build, and we hold no facade scaffolds or cherry pickers for hire, so count that morning into your planning.

What if the roof work overruns and you want to hire longer?+

That is usually no trouble: let us know and we push the collection day back, unless the set is already standing ready for somebody else. With roof hooks the overrun tends to come from the weather or from timber that disappoints, for instance boarding that proves too thin for the plate and has to be strengthened first. Because every extra day of hire costs only a fraction of the first, booking generously beats extending afterwards.

How much room do you need when you hire a mobile scaffold for this?+

You need a level piece of ground roomier than the hired mobile scaffold itself, because the stabilisers stand out at an angle on all sides and have to be fully extended on a tall build. Count on a place for the stack of parts through your hire period as well, and on clear passage to the front door. A parking bay or a driveway is usually the best spot; a narrow strip between a hedge and the wall does not work at this height.

Can you fit roof hooks if it is windy on your hire days?+

No, and your planning should be set up for that. At ten metres you feel wind far sooner than on the ground, and going onto a roof in it is unwise. The tower may stay standing as long as the stabilisers are out and nothing lies loose on the decks, so you only lose the working day itself. Do bring your tools and any loose tiles down before you stop, and use such a day to check the hook position against the drawing.

Do I get the deposit back quickly after hiring a set this tall?+

The deposit you pay up front when you hire is back within one working day, once the parts have returned and nothing is missing. On a tall set that counting matters more than on a low one, because there are more braces and couplers in it and a piece like that goes missing in the grass easily. Lay the parts into stacks as you dismantle. This article on the deposit explains how it runs.

Will this build also get me to the ridge on a steep roof?+

Not from the deck, and it does not need to. The build brings you to the roof edge and you cover the rest with a roof ladder over the tiles. On a steep pitch that distance is greater, so the ladder has to be long enough and able to hook over the ridge. Hire your build to gutter height, then, and measure the roof pitch separately. Trying to reach the ridge with the tower itself means building needlessly tall and standing too far from the wall.

Hire a mobile scaffold for installing a roof hook today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.