Painting an outbuilding? Choose the right scaffold.

Painting an outbuilding looks like a small job until you notice you have to work your way round it four times. Each side has its own surface underfoot and its own obstacles, and most people tackle it alone. For a shed, summer house or single storey garage you therefore hire the MiTower: 75 cm wide, built for one person, with a working height of 4 to 6 metres. Below you can read why that model suits this job, how many hire days it swallows and how you move the tower round the building.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting an outbuilding we recommend the 1-person scaffold.
  • For painting an outbuilding of a single storey you hire the MiTower, 75 cm narrow and meant for one person on the platform.
  • You go round the outbuilding four times, and under the wheels of your hired tower lies a different garden surface on every side.
  • Allow three to four hire days, because sanding, two coats and the drying time between sides quietly eat up the rest.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for painting an outbuilding?

Safe, stable and professional work at height

Round an outbuilding the difficulty sits in the standing spot rather than in the height. The front is on paving, one side on grass, behind the wall runs a strip of forty centimetres up against the fence, and the fourth side ends in a border. A tower you cannot shift on your own simply stays where it is, and the remaining sides get done off a ladder after all. That is the thing to avoid here, since you spend hours at one surface with both hands busy. So the scaffold you hire for painting an outbuilding has to be narrow, light, movable single handed and easy to strike once the last coat is on.

  • Four sides, four different garden surfaces underfoot
  • One person can build it and shift it
  • Working height 4 to 6 metres for one storey
  • Narrow enough for the strip behind the outbuilding
Read more about working safely →

Which scaffold to hire for painting an outbuilding

For a shed, a summer house or a detached garage the MiTower is the model you hire. Altrex built it 75 cm narrow and for one person, with a reach that runs to 6.2 metres of working height. That suits this job, because you usually paint an outbuilding on your own and what counts is whether you can get the tower round a corner unaided. Booking runs online by model and height, at fixed prices including VAT. The build heights on offer are listed with the MiTower you can hire.

Those 75 cm are no side issue here. The tower has to pass a garden gate, squeeze by a water butt and travel the path between the outbuilding and the boundary. Behind a shed that strip is often less than half a metre wide, and the width of your build then decides whether you paint that side standing up or skip it against your will. Measure the narrowest gap on the route before you book anything, and measure the gate itself as well, hinges and bolt included, since those alone eat ten centimetres.

Narrow 75 cm mobile scaffold standing built up, the light model you hire for painting an outbuilding

If you would rather hire a mobile scaffold that is wider, look at the RS51 at 75 cm or the RS52 at 135 cm across. Both are worth weighing up when two of you are painting, when a lot of material has to go up, or when the outbuilding has a storey with a loft window. For a plain single storey shed they are heavier than the work asks for and every corner costs you needless effort. The difference is set out in the comparison of MiTower and mobile scaffold.

What working height to hire for a single storey outbuilding

The highest point on an outbuilding is almost never the wall but the fascia board or the barge board along the roof. On a shed or summer house that edge sits at 2.5 to 3.5 metres, which puts you on a working height of 4 to 6 metres. Your platform then stands at 2 to 4 metres, because from the deck you are standing on you still reach a good two metres up yourself. You give that figure when you book, along with your delivery date and the day the tower may go.

Measure from the ground where the wheels will end up, and around an outbuilding that is a different level on each side. If the terrace at the front sits a slab higher than the lawn along the flank, measure at the low side and hire on that, because that is the side that leaves you short. Where the roof has an overhang of thirty centimetres, add it on. The page about a working height of 6 metres shows which build goes with it.

Mobile scaffold built up to just under the roof edge of a house, the height you hold to at an outbuilding

Choosing too tight costs you more than it saves. Standing half a metre low, you paint the top band and the underside of the overhang with your arms stretched above your head, and that is precisely where a brush leaves streaks you spot the moment the sun comes round. For those last fifty centimetres you end up fetching a ladder anyway, on the side of the outbuilding where the ground is softest. Take the size above instead and save yourself the bother.

Four sides round: where the tower stands in the garden

At an outbuilding you do not pick one standing spot but four, and they are rarely alike. The front sits on terrace slabs or on the drive, one flank on grass, the back on a narrow band of gravel or bare earth against the fence, and the fourth side borders a flower bed or a stack of firewood. Walk those four sides before you order the tower and look at where the wheels land, how far the stabilisers reach out and whether you can still pass with a full bucket without touching the wall.

On grass and earth you need something solid under the wheels, certainly after rain. Two thick planks or base plates per side are enough, provided they lie flat and do not rock the moment you put a foot on the platform. Watch the step between terrace and lawn as well, because the tower does not absorb that by itself and you level it again on each side. How to handle that is explained under a tower on uneven ground.

Stabilisers swung out at a tower base, showing the clear ground you want on each side of the outbuilding

The obstacles round an outbuilding are always the same suspects: a water butt under the downpipe, firewood against the rear wall, bikes beside the door, a washing line at head height along the flank and a climber that has fixed itself to the render. Clear all that before the tower arrives, because you go round four times and each shuffle costs you half an hour. The stabilisers have to swing out freely on every side.

How many days to hire a scaffold for an outbuilding

Count this job in sides and not in square metres. A shed of three by four metres means four walls, plus the door, the frame and the edge along the roof. Sanding, dusting off and priming bare patches take the first day, with the covering coats following after. For an outbuilding you paint the whole way round you land on three to four hire days, even when the painted area is modest and each side only keeps you busy a couple of hours.

Inside those hire days sit waiting periods you cannot make up by grafting harder. A fresh coat has its own curing time and that is printed on the tin, not written in your diary. Outdoors the weather adds to it: a timber shed stays clammy well into the morning after a night of dew, and no second coat goes onto a surface like that. Plan towards the day the work is certain to be finished, not the day it would theoretically fit.

Mobile scaffold standing along a side wall, as it waits at an outbuilding between two coats of paint

Booking generously is cheap on this job. The full rate is settled over the opening twenty four hours, and each further hire day costs a twentieth of that, since 95 per cent comes off. A spare day for a rain shower costs you next to nothing, while too short a period means the back wall stays half painted because the van is already pulling up. Set your end date with room to spare, not the morning your final coat has to go on. More on that under the explanation of hire days.

Which mobile scaffold suits painting an outbuilding?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting an outbuilding from a platform of 245 cm

Your platform measures 245 cm along its length, and that is the unit you divide the outbuilding into. A shed wall of three metres takes one set up plus a small remainder, a short end of two and a half metres fits in one go. Finish each wall completely from top to bottom before you move the tower, because the join between two positions shows up in the sun straight away if you leave it mid wall instead of on a corner or beside the door post.

Since you are working alone, everything you forget is a flight of steps. Gather it all in one heap on the ground first: the tin in a bucket, brush and roller, abrasive paper, a cloth and a roll of tape. Hang the bucket on the guard rail rather than standing it on the platform, so your feet stay free and you do not kick it over when you shuffle sideways. Anything you cannot carry in one hand simply stays below.

Narrow 75 cm tower built up beside a house, the platform you reposition wall by wall round an outbuilding

Shifting starts at ground level and with an empty platform. Take your materials off, retract the stabilisers, roll the tower round the corner and level it again there before you climb back on. The corners cost the most time, because you often have to move a planter or a bike rack first and then measure out afresh how far off the wall you stand. On an average summer house allow six to eight positions. At a larger garage you are having painted there will be more.

Hiring a MiTower with delivery: parts in the garden

What turns up on your date is a complete, counted set of loose parts. Agree in advance where that stack may go, because in a garden the answer is less obvious than out on the street. The drive or the terrace is fine, the lawn you are about to roll wheels over is not, and in front of the gate least of all. Order on a working day before 15:00 has gone and your set is on its way to the garden the next working day, so plan a day ahead.

When the delivery arrives and when the tower leaves again are both your choice, and for outdoor work you check the forecast first. Have it brought a day before your first painting day, so you can build in peace and begin the first wall next morning. Assembly is your own part of the work, with the manual and the instruction film within reach. The step by step guide to building gives the order from base to guard rail.

Van at a house with scaffold parts unloaded, the way your outbuilding set is dropped by the garden

At the end of your hire period we come back for the parts. You strike the tower and set everything out complete somewhere the driver can reach, which at an outbuilding usually means the front of the garden or the kerb. Prop the gate open and count the parts off as you dismantle. What the bringing and collecting comes to depends on the province you live in; the amount itself is shown with the delivery rates.

Working safely on a hired tower at your outbuilding

You stand on a deck rated to carry 200 kg per square metre, load class 3 within EN 1004, the standard our rental fleet is built to. On this job you sit well under that, since the MiTower is made for one person and only a bucket of paint and some tools go up with you. Keep it that way. Anyone dropping by to help with the high edges belongs beside the tower and not climbing after you, because the set up then changes character and the weight does start to count.

The fixed rules apply just as firmly here. The wheels go on the brake before a foot touches the steps, nobody and nothing stays aboard while it rolls, and in strong wind you come down. You hit that wind limit sooner at an outbuilding than against a house, because a shed at the bottom of the garden often stands in the open with only a low fence beside it. Walk round the stabilisers after every move and check that each one is clamped tight again.

Slim tower assembled in a passage beside an outbuilding wall, the single person build you put up yourself

The risk that really belongs to this job is the garden itself. Under the platform of the hired tower run children and pets, a slab path a tin lands hard on, and branches you do not see coming while you shift. Working with wood stain, the platform turns slippery the moment some goes astray, so wipe it off at once with a dry cloth before you take another step. The rules in a row are at working safely at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting an outbuilding

1

Walk the four sides before the tower is delivered and take away everything that will be in the way later. Moving a water butt costs a minute on the ground and half an afternoon from the platform.

2

Start on the side behind the outbuilding where the space is tightest. That flank takes the most effort of the four, and you want it behind you while you are still fresh.

3

Put two base plates or thick planks ready for the grass side of your garden. You reposition there at least twice, and with nothing underneath a wheel sinks in after rain.

4

Take everything up in one trip per position and hang your bucket on the rail. Because you are on your own, every forgotten brush costs you a whole flight of steps both ways.

5

Paint the door and the frame of the outbuilding from ground level and save the tower for the wall and the roof edge. That leaves a couple of positions off your list.

6

Leave the tower standing a day longer than your last coat strictly needs. You then keep a quiet morning for taking it down dry and stacking everything complete on the drive.

Frequently asked questions

Frequently asked questions about painting an outbuilding

Which scaffold should I hire to paint my outbuilding?+

For a shed, summer house or detached garage of one storey you hire the MiTower. It is 75 cm wide and intended for a single person, so you can get it through the gate and round the corners of the outbuilding on your own. If two of you are working, or a lot of material has to go up, a wider mobile scaffold makes more sense. Either way, measure the narrowest opening on your route to the back garden first.

From booking to collection, how does hiring for an outbuilding run?+

You start online with the model and the working height, then pin down the two dates that matter: the day the tower stands in your garden and the day it may leave. The rental price is fixed and includes VAT. We drop off the counted set, you build it, paint the outbuilding all round and put the parts out dismantled on the last day. Then the van takes them back. Only that first dry day is yours to judge.

How many days do I have to hire the tower to paint an outbuilding all round?+

Allow three to four hire days for an average shed or summer house. The painting itself moves along briskly, but preparing, shifting four times, laying on two coats and the drying moment in between all want room in your planning. If you only do the front and one flank, two days often covers it. Take in the roof of a lean to or a carport and you are better off hiring the tower a day longer from the start.

How much does a MiTower cost to hire, and how does the price change after day one?+

The rental price follows from two choices, your model and your height, and on top of that your province has a fixed amount for bringing and collecting the set. You see both including VAT on the price page, so nothing is added once you have booked. For an outbuilding the structure works in your favour: day one counts in full, every following day only for a fraction of that. Hiring generously once therefore beats two separate hire periods.

Which working height do I hire for a shed or a summer house?+

An outbuilding of one storey asks for a working height of 4 to 6 metres, with the platform of your tower at 2 to 4 metres. Start measuring at the garden surface under the wheels and finish at the highest edge your brush still touches, usually the barge board or the fascia. Which build goes with that is shown in the overview of working heights. Caught between two sizes, hire the taller one.

Do you put the tower up, or is building it down to me as the hirer?+

Building is down to you. We supply the complete set and make sure it is taken away afterwards, but putting it up, moving it and striking it belong to your side of the work. The MiTower is made for exactly that: one person has it standing at this height in about an hour with the manual and the video to hand. Neither facade scaffolds nor system scaffolds nor cherry pickers are stocked here, so for an outbuilding this is the model.

What if the painting overruns and I want to hire the tower for longer?+

Let us know the moment you notice you will not make it. We then move the collection day, unless the tower is already booked in for the next customer. Outdoor work on an outbuilding slips easily, since one clammy morning costs you half a day. Better to book an extra day at the outset. You pick the collection date yourself when you hire, and handing the set back early is fine too, with nothing to arrange.

What clear space in the garden does a hired tower need?+

Take the footprint of the tower and add the reach of the stabilisers on each side, plus a walkway you can pass along with a full bucket. In practice you want a good metre of clear ground on every side of the outbuilding, including behind it against the fence. If one side will not give you that, look at whether you can reach that wall from the flank instead. The stack of parts wants a place of its own as well.

What if the weather turns while the hired scaffold is standing there?+

The tower can stay in the garden, you only push your painting back. Do take loose items off the platform when you stop and bed the stabilisers down firmly, because in an open back garden it catches more wind than against a house wall. Use a day like that to sand under the overhang or to carry on indoors. Since you determine the collection day yourself, that shuffling costs you very little.

How does the deposit work when the scaffold is collected again?+

You settle a deposit when you book. As soon as the set of your tower has been counted back in, that amount is on your account again within one working day. On this job that means watching two things: every part you were given goes back, and there is no dried paint or stain on the tubes and the platform. A cloth spread over it while you work saves scrubbing. Small pins are the quickest thing to lose in grass.

Can I work behind the outbuilding along the fence with this model?+

Usually yes, and that is exactly why we advise a tower of 75 cm here. Behind the wall you need roughly a metre to stand it up and swing the stabilisers out. Where that band is narrower, you can sometimes still reach the rear wall from the flank or place the tower at an angle. Measure that space before you hire, because this is the side people misjudge most often.

Hire a mobile scaffold for painting an outbuilding today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.