See your price
Application

Fitting a house number? Choose the right scaffold.

Fitting a house number is one of the smallest jobs anyone hires a mobile scaffold for, and honesty helps here: often you need no tower at all. If the digits sit at eye level beside the front door, a step stool does it. The picture changes once the number goes high on the wall, hangs above an entrance where no ladder stands square, or comes as a large sign of separate letters. Then you hire a MiTower, the one person tower 75 cm wide, built to four to six metres of working height.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For fitting a house number we recommend the 1-person scaffold.
  • For a house number high on the wall you hire the MiTower, a single user tower that measures just 75 cm across.
  • Built to between 4 and 6 metres working height, the tower reaches a fixing point above an entrance or under a first floor window.
  • If the number hangs below three metres above flat paving, hiring a scaffold for the job is simply overkill.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for fitting a house number?

Safe, stable and professional work at height

The question with a house number is not how high you must go but how still you must stand. You drill two or three holes, hold a spirit level, tap in plugs and drive the letters straight. That takes two hands every time, and at the same moment you want to step half a pace sideways to check whether the number really hangs level. A ladder will not give you that, and above an entrance or a porch a ladder often will not stand at all, because the feet find nowhere flat to land. So here you rent a small platform rather than a long ladder. The MiTower is the lightest choice of the lot.

  • One fixing point, but two hands kept free
  • MiTower for one person and light tools
  • Working height between four and six metres
  • No ladder stands square above an entrance
Read more about working safely →

Which mobile scaffold to hire for fitting a house number

For a house number you hire the Altrex Mi Tower, a mobile scaffold 75 cm wide that is built around a single user. That suits what this job asks of you: all that travels up is a drill, a small box of plugs and the digits, and nothing more needs to fit on the deck. The narrow width slips past a bike rack or through a side gate to a rear entrance without anything having to be moved. What else stands in the fleet is set out on the page about hiring the MiTower.

Be honest about whether you need to hire anything at all. If the number goes up about two metres beside the front door, the paving under it is flat and you can keep the door shut for a while, a household step ladder does the job in half an hour. Hiring a tower for house number work at that height mostly buys you a morning of building and dismantling. That is a waste of your time, and we say so beforehand rather than afterwards.

Tubes, frames and orange diagonals on a drive, the compact 75 cm Altrex MiTower kit built around a single user

There are three situations in which a mobile scaffold does earn its keep. The first is a tall elevation, where the number belongs beside a first or second floor window of an upstairs flat. The second is a number above an entrance or a porch, where a ladder would have to plant its feet in the doorway. The third is a large name board or a run of separate letters, because then you spend an hour measuring and lining up. Compare the models in the piece on the MiTower against a mobile scaffold.

Which working height to rent for a high house number

What do you actually have to reach on a house number job? The top edge of the digit or the board, and that point is your measure. Above a porch door it sits around three metres; beside a first floor window it climbs to four or five. The MiTower runs from 4.2 metres working height up to 6.2 metres, and a house number nearly always falls in the lower part of that band. What you book is the working height: your platform height with roughly 2 metres of reach added on.

Your tape starts where the wheels will end up, and beside a front door that is rarely the threshold. If two steps lead up to the entrance, the tower stands on the pavement next to them, so you begin lower than you would guess. A basement flat with a raised entrance does exactly the same thing to your measurement. Walk that stretch of wall with a tape before you choose the build, because half a metre of difference here means one extra section in your set.

Mobile scaffold built up against a front elevation, bridging the working height to the fixing point of a number

Choosing too tight shows up in the result straight away on this job. Stand half a metre low and you drill with your arms stretched above your head, the bit wanders off the marked point and the number ends up crooked. The dust comes down into your face as well. Since you are hiring the lightest build there is anyway, one section more costs you next to nothing. What goes into such a set is listed under the build for 6 metres working height.

Hiring a mobile scaffold: where it stands by the entrance

With a house number the tower nearly always stands on the pavement or the path right in front of the entrance, and that is exactly where everybody has to pass. Think of the postman, the neighbours from the same stairwell and the people wheeling a bike inside. So set the pitch a little off the centre of the door, so the door still opens and there is room to walk by. An hour of thought about that spot saves a whole day of shuffling.

The ground is usually paving, and that works well as long as you can genuinely spread the four stabilisers. They angle outwards, so allow for more room than the tower itself takes up. Look beforehand at what lies in that zone: a tree pit, a bike stand, loose slabs, a step down to the door or a drain cover that one stabiliser foot wants to land on. Bikes leaning against the wall go away before the set is delivered, not while you are already building.

Four stabilisers spread at the foot of a mobile scaffold, the square of pavement that must stay clear

On a busy street keep a walking route open and fence off the zone under your work point with a few cones or some tape. For a couple of hours of work that feels excessive, but this is an entrance where people step out without looking up. On a narrow pavement, ask what your council allows, even if the tower is only there for one day. If the pavement falls away towards the gutter, read the article on levelling on a sloping surface.

How many rental days for fitting a house number

The fitting itself takes an hour, two at the outside if you are lining up a board of separate letters. The day goes on everything around it: laying the set out, building, moving the pitch to the right spot, then dismantling afterwards and stacking it tidily. For the MiTower, building and taking down together comes to about an hour, even on your own. So count on one rental day in which you do the lot, not on a morning in which it all happens to fit.

There is one waiting time people forget. Fix a heavy board with chemical anchors or mounting adhesive and it has to cure before you take the prop away, and that time is printed on the pack of whatever you are using. An illuminated house number adds a connection on the inside, and then you want the tower still standing in case the cable run does not sit right first time. Booking two days gives you that room.

Mobile scaffold built up at a modern elevation, standing through your rental days while the fitting is done

Booking longer costs you almost nothing, and on a job this short that is the thing worth knowing. You pay the full rate for the first 24 hours only; every rental day behind that comes with 95 per cent off. Putting a second day in because rain is forecast or because you only have time in the evening is therefore not an expensive insurance. What the rental price for this build comes to you work out on the page with the rates.

Which mobile scaffold suits fitting a house number?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Fitting the house number from one 245 cm deck

The deck is 245 cm long, and for this job that is nearly always enough. A three digit house number spans half a metre at most, so the tower goes down in one place and you stay up until it is done. Only with a long name board or a run of separate letters spread over more than two metres do you need a second pitch. In that case snap a line across the whole board first, so the second half lands at the same height.

Everything needed up top goes up in one trip, because climbing back down the tower for one forgotten plug costs more time than the drilling. On the list: plugs and screws in two sizes, a drill with a matching masonry bit, a spirit level, a pencil, tape, a cloth and the digits in a bucket so nothing rolls off the deck. A straw to blow the hole clean belongs there too, since leftover dust stops the plug going home.

Mobile scaffold against a house with a 245 cm deck, wide enough for the fixing point of a number

What catches people out is the lining up. From the deck you stand half a metre off the wall and cannot see whether the number hangs straight from the street. So tape the digits in place first, go down, look from the pavement and only then shift them. On old brickwork watch where you drill as well: a hole in a joint goes in more easily and repairs better afterwards than one in the middle of a facing brick.

Delivery, build and collection when you hire the MiTower

The MiTower arrives as a complete, counted set of parts. That is a small stack, but do not put it down in the doorway where you actually want to be working. The strip beside the entrance or a piece of front garden is handier, and on a walkway or in a stairwell you lay it against the blank wall. Complete the booking on a working day inside the 15:00 window and the parts reach your address the next working day.

Which day it arrives and which day it goes away are both yours to pick, so the set can turn up on the morning you are free and leave again the day after. Building stays with you; we do not put scaffolds up for anybody. With this model that is perfectly manageable single handed. The manual and the video that goes with it show you the order of assembly, and you run through that once calmly before you start.

Delivery van outside a house, dropping off the parts of the MiTower you hired at the address

If you have it delivered, you pay a fixed price per province for bringing and collecting together; what that is for your address is on the page with delivery charges. We do not drive outside the Netherlands or to the Wadden Islands. After your rental period we come and collect the set again. All you do is have everything dismantled and stacked ready at the spot where it was dropped, so the driver does not have to carry a pile of tubes through your front garden.

Safely fitting a house number above an entrance or pavement

Every square metre of deck may carry 200 kg; that limit belongs to load class 3 from EN 1004. A drill and a box of screws come nowhere near it, not even with a bucket added. The point with this model lies elsewhere: the MiTower is built for one person, so your helper stays on the ground and passes up a bucket on a line at most. If you want two people on the deck, you have to hire a different model.

The ordinary rules stay in force even though the work lasts an hour. Brake all the wheels before you take the first rung, and check that again after every break. Move the tower empty only: nobody on the deck, no tool box on the boards. And do not start in a strong wind, because a wall on an open street corner catches more of it than you notice at ground level while you stand up there with a machine in your hand.

Erected MiTower against a brick wall with a loose ladder beside it, a 75 cm build for a single user

The real risk with a house number is what happens below you. You work above an entrance where people step out without looking up, so screen that zone off and warn the occupants of the building. Do not leave tools on the edge of the deck, because a drill that falls lands right on the doormat. Take care drilling around a doorbell or outside light: there is wiring in the wall. The full list is in the rules that apply to working at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for fitting a house number

1

Tape the digits to the wall with masking tape first and then walk to the far side of the street. Only when it looks right from there do you climb the tower to drill.

2

On old brickwork drill into the joint rather than the middle of the brick. A hole in a joint can be filled invisibly later, a cracked facing brick cannot, and at eye level you always see it.

3

Take two sizes of plug up with you. Drill into soft old brick and the screw spins in the hole, so you need something thicker, and you really do not want to come down the scaffold for one plug.

4

For an illuminated house number, drill the cable entry and pull the cable inside before you hang the fitting. Otherwise you end up holding a heavy unit in one hand while you grip the guard rail with the other.

5

Place the pitch so the front door can still swing fully open. The tower stands there for a day, and in that time shopping, a parcel courier and probably a bicycle all have to get past that door.

6

Set your collection day one day after your fitting day. If the number turns out to be hard to read in the dark, or one letter sits slightly askew, you are back up there next morning without any fuss.

Frequently asked questions

Frequently asked questions about fitting a house number

Which mobile scaffold should you hire for a house number high on the wall?+

Take the MiTower. It is 75 cm wide, built around one person and light enough to stand up on your own. You need little deck space up there, because nothing more travels up than a drill, a few plugs and the digits. That narrow width also slips past parked bikes and through a gate to a rear entrance. If two of you are working up top, or it is a substantial board, hire a wider tower instead.

Do you really need to hire a scaffold to fit a house number?+

Far from always. If the number sits at eye level beside a front door with flat paving in front, a step ladder is enough and you need to hire nothing. A mobile scaffold only makes sense on a tall elevation, for a number above an entrance where no ladder can stand, or for a large board you have to line up calmly. So look first at the height of the fixing point and at what is on the ground below you.

How does hiring work if you are only putting up a number?+

Booking runs online: pick the model, pick the reach you need, put a delivery date and a collection date in the calendar, and the amount including VAT appears at once. On the agreed day we drop the parts with you. Then it is your turn: build it, fit the house number, then strip the tower and pile the parts up again. We come and fetch them. Beyond a clear bay in front of the entrance and someone watching from the street, nothing else needs arranging.

What does hiring this MiTower cost and how does the discount work?+

The amount follows from the model and the height you build; bringing and fetching we charge separately per province. You see every rate including VAT before you book. On a job this short what counts is that the first day weighs heavily and the days behind it barely add anything. Two days of tower hire therefore differs hardly at all from one, while you work far more calmly and never have to stop with a half fitted number.

Which working height should you rent for a number on the wall?+

Measure from the pavement to the top of the digit or board you are hanging, and add what you need to reach it comfortably. For a number above an entrance or beside a first floor window you end up needing 4 to 6 metres of working height, and you match the build of the tower to that. It is exactly the band the MiTower was made for. The page on the different working heights shows which build belongs with it.

Is the MiTower brought to you, or do you fetch the hired set?+

Both are fine. Choose delivery and we set the tower down as a set of parts on your delivery day and take it away again on your collection day; that costs a fixed amount per province, however long you keep it. Would you rather fetch it, you can pick it up by appointment at no charge on Zeeburgerpad in Amsterdam, and this light set usually fits in a van. On a job of one morning, delivery saves you half a day of driving.

Do you build the scaffold, or is that not part of the hire?+

No, putting the mobile scaffold up is your own work. We hire out the parts and bring them to you, but a fitter who erects it for you is not included. With the MiTower that is not needed either: this model was designed so one person can raise it. Reckon on about half an hour to build and the same to take down. There is no facade scaffolding in our hire fleet, nor a system scaffold or a cherry picker.

What if the job overruns and you want to hire the tower a day longer?+

Tell us in time and your collection day shifts back by a day, provided no other booking is waiting on that tower. With a house number it usually overruns on something small: a plug that will not grip, the wrong bit, or a board that turns out to sit crooked after all. You pick your own collection date, so set it generously and tell us if you finish early. That way you never stop halfway because the van is already outside.

How much space must be clear before you hire a mobile scaffold?+

Count the 75 cm width plus how far the four stabilisers reach out on each side, so in practice a flat bay a couple of metres across in front of the entrance where the tower will stand. The stack of parts also has to go somewhere until you have finished building. Bikes, planters and a wheelie bin you move beforehand. If a car is parked under the fixing point, put it somewhere else before the delivery day.

It rains on your fitting day: can you keep the scaffold longer?+

The mobile scaffold simply stays where it is, so you lose no more than half a day. Drilling into a wet wall is fine, but tape and mounting adhesive will not work on a wet surface and an illuminated number wants a dry connection. Wait until the wall has dried out. Because an extra rental day barely registers in the cost, you would rather move a job like this by a day than rush it in the rain. Just watch the slippery deck.

After a hire like this, how quickly is the deposit refunded?+

The sum you settle at booking returns to you within 1 working day once the returned set has been checked over. With fitting work you watch two things: give back everything you were given, including the small stuff, and leave no drilling dust or adhesive residue on the deck boards of the tower. A quick wipe before you start dismantling is enough, and count the parts as you take the scaffold apart.

Can you do the doorbell or name plate from the same pitch?+

That is exactly why a day like this is worth planning. While you are up there, do everything that belongs on that strip of wall in one pitch: the house number, a name plate, cleaning the doorbell or hanging an outside light above the entrance. The tower is already standing and you do not hire it twice. Just make sure you take the tools for those extra jobs up with you, because climbing down twice is a waste.

Hire a mobile scaffold for fitting a house number today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.