See your price
Application

Applying a coating? Choose the right scaffold.

Applying a coating is work counted in square metres. You treat whole facade panels in one go, with buckets that have to get up there and a wet edge you must not let dry off. That is why you hire the RS52 for it, the wide model of 135 cm, put to work at 8 to 12 metres of working height. The width gives you room for material beside your feet, and the platform of 245 cm decides how often you shift along. Below you can read what a full panel costs in hire days.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For applying a coating we recommend the Wide mobile scaffold.
  • For applying a coating high up you hire the RS52, the wide model at 135 cm, reaching 8 to 12 metres.
  • A wide deck takes two buckets, a roller and a second pair of hands without anybody squeezing past anybody.
  • A facade panel of eighty square metres soon means ten set-ups per coat, and therefore several full hire days.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for applying a coating?

Safe, stable and professional work at height

With a coating it is not the difficulty of the action that counts but the size of the surface. You are handling buckets of material and a roller or block brush, and you have to keep the wet edge alive until you reach a corner or a joint. That means you want to stop and reposition as little as possible, and everything you need has to sit within arm's reach. A narrow floor will not take that: two buckets, a lid, a stirrer and a second person fill a deck of 75 cm entirely. Hiring a scaffold for applying a coating therefore comes down to choosing width, and to booking enough hire days for all the set-ups.

  • Buckets and material have to go up with you
  • Keep the wet edge alive across the panel
  • Working height of 8 to 12 metres at the wall
  • Many set-ups, so count in hire days
Read more about working safely →

Hiring the RS52 for applying a coating: 135 cm of width

For coating a large facade you hire the Altrex RS52, the wide version measuring 135 cm across. That difference of sixty centimetres against the slim variant looks small on paper, but at ten metres up it is the difference between working and manoeuvring. You stand two buckets side by side, keep a walkway clear and can pass one another when two of you are up there working. The models are shown under mobile scaffold hire.

This model runs from 4.2 metres right through to 14.2 metres of working height, so the 8 to 12 metres a facade of three or four storeys asks for sits well inside it. The platform length is 245 cm, and that figure keeps coming back on coating work: it sets how wide your band is and therefore how often you move the tower. Work those strips out before you book, because they tell you straight away how many days you need.

Wide mobile scaffold built along a facade, the deck on which buckets of coating and tools stand side by side

The slim RS51 of 75 cm exists as well, and you pick that one only if the wide version cannot get to the spot: a gateway, an alley between two houses, a courtyard reached through a passage. You then give up working room on a coating job, because your bucket is permanently in the way. Where the approach allows it, hire a mobile scaffold of the wide sort instead. The dimensions of both stand together in the overview of sizes.

Which working height to hire for a 12 metre coating job

On coating work you measure to the topmost edge that still receives material, usually the junction with the roof edge or the underside of the gutter. A house of three storeys lands you at around nine to ten metres; four storeys or a tall gable runs towards twelve. That is why 8 to 12 metres of working height is the range you go and hire. Measure from the pavement the wheels will stand on. That build is pictured on the page about 12 metres of working height.

The working height is not the height of your floor. On the platform you stand about two metres under the highest point you can still reach with the roller, because your arms and the handle cover the rest. At twelve metres of working height your deck therefore sits at roughly ten. That is exactly why a tall facade is worked in bands: you do not build once and reach everything, you shift the platform up and down as well.

Mobile scaffold built against a front elevation over several storeys, the height a large coating panel asks for

Booking too tight costs you a whole day on this job. Come up just short of the roof edge with your top band and you have to extend the build with material already on it, which means clearing it, rebuilding and lining up again. So take the height that lets you do the top row in one pass. Working on a facade up to and including the third floor, twelve metres has you covered. An extra metre of hire beats half a day of rebuilding.

Hiring a mobile scaffold and setting it along a large facade

A build of ten metres makes heavier demands on the spot than a low tower does. The ground has to carry without settling, over the whole footprint, and at this height the four stabilisers reach a long way out. So do not reckon only on the 135 cm of the scaffold itself but on a strip several metres wide along the facade, free of bollards, low railings and parked cars. On the street that usually means keeping a parking bay clear.

With a coating the logistics of the material come on top of that. The buckets stand below, and you want that place immediately beside the build so you are not dragging them across the pavement. Keep room round the feet for a pallet or a barrow, and set out a walkway for passers by if you are working on the street. Check with the council which rules apply to your footway. Stabilising at this height is covered in the explanation of anchoring.

Stabilisers extended under a mobile scaffold, the footprint a ten metre build needs alongside the facade

Look at what hangs above and beside you as well. At nine or twelve metres you are level with dormers, canopies, cables and the neighbours' awning, and those help decide where the build goes. Walk the whole facade beforehand and mark the places where you cannot stand tight against the wall. That saves you half an hour of shuffling an assembled scaffold on the day itself. A quarter of an hour of preparation wins that back easily.

How many days to hire the scaffold for coating a facade

Work the job out in set-ups rather than in hours. A facade eight metres wide and ten metres tall is eighty square metres. With a platform of 245 cm you work bands a good two metres wide, and from one platform height you take a strip a good two metres tall. That comes to four bands beside one another and four or five heights, so sixteen to twenty set-ups per coat. Moving sideways costs a quarter of an hour each time, rebuilding upwards longer.

Add the preparation and the coats to that. The facade has to be clean and dry, cracks and open joints are repaired first, and a coating normally goes on in two layers with a waiting time between them. For an average facade you end up at six to eight hire days, a couple of which go on washing and drying. If the wall first has to be cleaned down thoroughly, add at least one day, and on a badly soiled panel nearer two.

Assembled mobile scaffold at a modern house, standing through the hire days alongside the coated panel

Such a long period is not as costly as it sounds. You pay the whole tariff for the first day and night, and on every day after that the tariff drops by 95 per cent. Booking eight days therefore differs little from booking five, while it gives you the room to absorb a shower or an extra washing round. So book beyond your final coat. How high you may build in general is set out in the piece on maximum height.

Which mobile scaffold suits applying a coating?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Applying coating per set-up on a 245 cm platform

Work a block per set-up that you can hold in one go. On coating the wet edge is what leads: as long as it stays wet, the next band joins on invisibly. So start at the top of your strip, work downwards and keep the side alive until you reach the end of your reach. Stop at a corner, a downpipe or a vertical joint, because that is where a start shows least. At ten metres up you will see that choice from the pavement later.

What you carry up decides how often you have to come down. A bucket of coating soon weighs twenty kilos, and with a ladder inside the build you will not get it up there neatly. So work with a line and a bucket hook, or top up above from a smaller can. On a deck 135 cm wide two buckets stand side by side without you tripping over them, and that is precisely why you hire this model. Every trip down you avoid is a gain.

Mobile scaffold built along a side elevation, the set-up you move band by band while coating

What people underestimate is how often you have to rebuild in height. Moving sideways is quick: brakes off, roll, stabilisers back out. Hanging a platform a level higher or lower is another story, because everything has to come off the deck first. So plan those moments deliberately: do the whole top band across the full width of the facade, and only then drop a level. That way you rebuild four times over instead of twenty, and the difference lands straight in your hire days.

Hiring a wide mobile scaffold with delivery to your site

For 8 to 12 metres a substantial set of parts comes your way: frames, braces, platforms, guard rails and the stabilisers, counted and complete. That stack is bigger than people expect, so point out a place beforehand that is not on the route of your material and your buckets. Anything reserved before 15:00 on a working day goes into the van the following working day. On a tight programme that can easily save you a week of waiting.

The date of delivery and the date of collection are yours to fill in. For coating you have it dropped on the day you wash the facade, so the build is ready as soon as the surface is dry. Assembling up to ten metres is your work; manual and instruction video point out the sequence, and with two people it takes half a day. Count that half day in, because you will not be coating then. At this height it is not something you fit in alongside.

Scaffold parts laid out in the street ready for assembly, the complete set ordered for a large coating panel

After the final layer we collect the set again. Strike it once the panel is dry and put the parts out bundled where the van can reach them; on a facade at the street that is often the same parking bay the build stood in. What bringing and fetching cost together varies by province, and you see that amount in advance on the page with delivery charges. Take that amount into your calculation before you book.

Working safely at 10 metres with buckets of coating

On this job the loading is not theory. The platform is passed for 200 kg per square metre, load class 3 under EN 1004, and with two people, two full buckets and a tool box you get there faster than you think. Add the weight of your material up once before you send it all aloft, because one bucket fewer above is rarely a problem. What the class means exactly is in the piece on loading and weight.

The standing rules weigh heavier at this height. Brake every wheel before anyone steps on, never move the scaffold with buckets or a second person aboard, and stop the moment it starts to blow. At ten metres you feel wind you barely notice below, and a half full bucket on the guard rail is the first thing to go. After each move, check that all the stabilisers are out again and the wheels locked. That round costs you a minute.

Wide mobile scaffold with guard rails and ladder, the route buckets and tools take up to the coating work

The risk that belongs to coating is what goes down. A bucket that tips at ten metres reaches a car, a front door or a passer by, and material on the street stays visible. Cordon off the zone under the build with tape, hang sheeting against the facade where you need it, and keep the deck clean; spilled coating makes a floor slippery without you seeing it. A roll of cardboard and a cloth in your pocket sort that out.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for applying a coating

1

Work out your bands before you book. Divide the facade width by 245 cm and the height by your reach per set-up, and you know how many moves and how many hire days the job needs.

2

Haul the buckets up on a line instead of carrying them under your arm on the climb. You keep both hands free on the way up and spare yourself twenty kilos on every trip.

3

Always put your starts on a vertical line in the wall: a downpipe, a joint or a corner. From the platform you choose that spot deliberately, and from the pavement it will not catch the eye.

4

Do the top band across the full width before you drop a level. Rebuilding in height costs far more time than rolling sideways, and over a whole facade that difference adds up hard.

5

Keep a bucket of water and a sponge with you up top. Coating that lands on the tubes or the deck wipes off while wet; dried on, it costs you time when you hand the set back.

6

Book your period to at least a day past the final layer. You want to walk the whole facade once more in daylight before the scaffold comes down and the van arrives to take it.

Frequently asked questions

Frequently asked questions about applying a coating

Which mobile scaffold should I hire for applying a coating?+

The RS52, the wide version of 135 cm. Coating means material on the platform and that does not fit on a narrow floor; with two buckets and a roller on 75 cm you spend the day walking round your own kit. The platform length of 245 cm also sets your band width. If a wide scaffold will not come through the gateway, the slim RS51 is the alternative. Measure that opening before you book.

How does hiring a scaffold work for a big coating panel?+

You reserve online on model and working height, choose your own dates for dropping off and picking up, and settle a fixed price including VAT. We leave the complete set at your address, you assemble it, coat the panel band by band and take it apart at the end. On large surfaces it pays to sketch your set-ups first, so you know how many hire days to book. That spares you trouble with the programme afterwards.

How many days do you hire for a complete facade panel of coating?+

Six to eight hire days for an average panel. Washing and drying take a day or two, the first layer another day or two, and after the waiting time the second layer goes over it. The number of set-ups decides the rest, since every move and rebuild costs time that is not coating. Working on several elevations, count one to two days extra per panel. Booking tight usually costs you half a layer.

What is the rental price for a wide scaffold at 12 metres?+

That depends on the model of scaffold, the working height and the number of days, with bringing and fetching adding a fixed amount per province. You will find the rental price, VAT included, on the prices page. For coating it helps that the first day carries the weight of the cost and the days after it barely register, because this work needs a long period whatever happens. Put the delivery into your budget separately.

Which working height should I hire for a facade of three storeys?+

Three storeys usually comes down to nine or ten metres up to the roof edge, so you reserve inside the range of 8 to 12 metres of working height. Measure to the highest point that gets coating and not to the ridge. Count the height of the kerb in if the facade stands on a falling street. The working heights page gives the matching scaffold per height. In doubt take the taller build.

Do you deliver the scaffold for a hire period of coating work?+

Yes, and at these dimensions most people take that option. A set for twelve metres will not go in a car and weighs too much for an ordinary trailer. We bring the mobile scaffold on the date in your reservation and take it back after the last layer; bringing and fetching carry one fixed amount per province. Collection at Zeeburgerpad 89 in Amsterdam is free by appointment, but mind the length of the tubes.

Is assembly part of the hire or do I do that myself?+

Yes, building and dismantling belong to your part of the work. Up to ten metres that is half a day with two people, and you plan that half day separately, because coating will not happen that morning as well. Build level by level and check each stage before you carry on. You will find no facade scaffolds in the fleet, no system scaffolds and no cherry pickers either, which makes this mobile scaffold the right tool up to twelve metres.

What if the coating runs over and I want to hire for longer?+

See it coming and let us know; we move your collection date if the scaffold has not been promised on. On large surfaces overrunning happens more than it does on small work: one wet afternoon means a band you cannot finish and a wet edge that has gone. Anyone booking generously from the start is untroubled by that, because handing back early is always allowed. That keeps your own programme in your hands.

How much free space does a hired mobile scaffold need at the wall?+

More than a low build. Next to the 135 cm of the scaffold itself come the stabilisers, which stand well out at this height, and beyond those you want space for the buckets and the rest of your material. A clear strip of three to four metres along the wall is realistic. If the facade fronts the street, reckon on a parking bay and a walkway for pedestrians. Arrange that before the set arrives.

Can I keep the hire running if it starts to rain while coating?+

You do not put coating on a wet wall, nor when rain is coming before the material has set. The scaffold simply stays where it is; you only move the work. Use a day like that to wash down, fill cracks or prepare the next panel. Because you set the collection date yourself, a shift like that costs you no more than one extra hire day. On a big surface you plan that margin in anyway.

When is the deposit back after a hire period with coating?+

You pay a deposit when you hire the mobile scaffold, and it is transferred back a single working day after we have counted the returned parts. With coating the thing to watch is residue: material that dries on frames or decks does not come off easily. So take a bucket of water up with you and wipe spills away at once. Hand in everything you were given, down to the last brace.

Can I coat several elevations within one hire period?+

You can, and it is the cheapest way to do it. As long as the scaffold stands on your land or in front of your building, you move it to the next elevation without a fresh delivery. Do allow a day or two per extra panel, because you start again from nothing with your set-ups. Two separate bookings mean two full first days and two journeys out and back. On a row of buildings that mounts up.

Hire a mobile scaffold for applying a coating today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.