See your price
Application

Wallpapering a high wall? Choose the right scaffold.

Papering a high wall differs on one point from every other job indoors: you have a wet length of three or four metres in your hands that you can only place once. That does not work off a ladder, nor off a wobbling stool. For wallpapering a high wall you hire the Altrex RS44 room scaffold, with 3 to 4 metres of reach and parts that pass through an interior door. Below you can read how to manoeuvre with such a long length on the platform and how many rental days it costs.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For wallpapering a high wall we recommend the Room scaffold.
  • For wallpapering a high wall you hire the RS44 room scaffold: 3 to 4 metres of reach indoors, and it clears an interior door.
  • You cut the lengths to size below and hang them wet, so up on the deck you must be able to turn with one.
  • Unlike emulsion work every length is fixed the instant it touches, so your pitch has to sit right beside the next seam.
  • First 24 hours from €50 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldRoom scaffold (Altrex RS44)
Working height for this job3 to 4 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €2.50 a day
Why a mobile scaffold for wallpapering a high wall?

Safe, stable and professional work at height

With paint you may leave half a face and come back to it later. Wallpaper grants you no such thing. A length cut to size and wetted has to be up within a couple of minutes, tight against the previous seam and without a crease. Which means you climb with the folded length, line it up at the top and work down from there while somebody below guides it. So up on the deck you need clear floor to turn on, and down below room for a pasting table. Hiring a scaffold for wallpapering a high wall therefore turns on placement relative to the seam, on floor space, and on a pitch that shunts along quickly.

  • Clear deck to turn a long wet length on
  • A pitch that lands beside the next seam
  • Space for a pasting table next to the scaffold
  • Parts that come indoors through an interior door
Read more about working safely →

Which room scaffold to hire for wallpapering a high wall

For papering indoors you arrive at the Altrex RS44. That room scaffold makes 3 to 4 metres and goes in separate parts through an interior door of about 70 cm wide, so you get it into the living room, into the stairwell and alongside a void. More important than the height is that the frame stays compact, because you have to shunt it along per length while a pasting table stands in the same room. The details are on the page about room scaffolds for hire.

A deck 245 cm long is precisely the right measure for papering. Four to five lengths fit side by side within that reach, so you hang a fair stretch of wall before you have to move. At the same time you need that length in order to turn with a piece that is already stuck at the top and still hanging loose at the bottom. On a small stool you would simply be pinned in place by a limp length like that.

Bundled scaffold components made ready for transport, the loose parts a room scaffold for papering is built from

An outdoor frame on large castors is no alternative here. It will not come down the hall, it stands too far off the wall, and it keeps you from getting close enough to the seam. The other way round, a single ladder is too cramped: you need both hands, you have to be able to step sideways, and there is no room for a brush, a seam roller and a knife. Which type suits indoors is set out in the comparison between the two.

Working height to hire so the wallpaper reaches the ceiling

On papering you measure to the line where the length ends: the junction with the ceiling, with a coving or with a beam. That point settles both the length you cut to and the build you reserve. In a living room with a raised ceiling or in a stairwell you come out at 3 to 4 metres. The working height you specify is your platform height plus roughly two metres of standing reach. See what an build to four metres means in practice.

Take the wall at several places, because old houses are seldom true and a difference of two centimetres shows immediately at a seam. Measure from the floor the scaffold will genuinely stand on, too. In a stairwell or beside a void one of the four legs sometimes rests on a stair tread, and then your figure on that side no longer matches the rest of the room. Note both heights separately and work with the lower one.

Scaffold with a low platform and guard rails, about the height at which you place the top edge of a length

Stand too low while papering and you are reaching with straight arms for the top edge with a wet length in your grip. The length then sags, it sticks on skew, and you will never get it off again cleanly. Rather take a build on the roomy side than a tight one; it costs you a few extra minutes of assembly at most. For a wall carrying on across two storeys, look at a wall reaching the first floor.

Setting the hired room scaffold along the wall you will paper

Where the scaffold goes is tied to the seam on this job. Put it so that the first length of a run sits flat in front of you and not just behind an upright, because then you are reaching at the very moment it has to be exact. Work out beforehand where the seams fall, start at a window or in a corner, and mark a plumb line in pencil. Only after that do you roll the hired frame into place and lock the castors.

Under the castors on papering work there is nearly always a vulnerable floor, and paste that gets everywhere is part of the deal. So lay hardboard or heavy sheeting over the whole strip first, and carry it through to where the pasting table stands. Paste that dries between two boards never comes out again, and a small wheel presses itself into a soft floor. How to handle floors and thresholds indoors is described in this piece on indoor work with a scaffold.

Foot of a scaffold with castors and folded out supports, set on sheeting to keep paste off the floor

Keep room beside the scaffold for the pasting table, a bucket of paste and the roll still to be cut. That table is soon two metres long and has to stand where you can get at it without walking round. So clear the room out past the last length of that day. Take everything off the wall as well, down to the screws of a coving, before the hired pitch is in front of it and you can no longer reach.

How many rental days a high wall in wallpaper takes

Papering costs more days than people reckon, and that is down to the preparation. Steaming old paper off, washing residues of adhesive away, filling holes, sanding and sizing all happen at height too, so you need the pitch before the first roll is even opened. For a high wall in a living room or a stairwell that brings you to two or three days of hire, in which the actual papering often does not fill half the time. Working alone, add half a day.

On top of that comes waiting. A coat of size has to dry before you hang paper on it, and on a freshly plastered wall that takes longer than on old work. The room itself plays in as well: in a cold, damp space nothing cures and seams open up again instead. So ventilate steadily, but keep a heater off the wall. All that while the room scaffold stays where it stands, because measuring and lining up afresh costs more time than an extra day of rental.

Built up scaffold with deck boards and guard rails, standing as it does between sizing and hanging paper

That extra day is cheap, after all. Only the first twenty four hours carry the full rate; every rental day beyond it is charged with 95 per cent taken off. Carrying on until you are genuinely finished therefore hardly registers on the bill and saves a great deal of hurry. Booking too short is the unpleasant version: two lengths still to go with the van at the door. Read the make up of the costs calmly on the page of rental prices, well before you settle your dates.

Which mobile scaffold suits wallpapering a high wall?

Most chosen
Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Hanging a long length of wallpaper from the 245 cm platform

Cut the lengths to size below, with some over at both ends, and fold them double on the pasting table with the wet faces together. That way you carry a four metre length up without it sticking to anything. Up top you unfold only the upper part, set the edge against the ceiling line and let the rest drop down the wall. From a deck of 245 cm you have length enough to make a half turn while doing it.

Work with two people by preference: one up on the room scaffold and one below who guides the length and trims the bottom edge. The person above handles the lining up and the pressing home of the first fifty centimetres, and that is the part everything hangs on. If it runs skew there, the whole metre length beneath it is wrung out of true. Push the air out from the middle with a broad brush before you work further down, or you keep bubbles under the length.

Mobile scaffold built up beside a brick wall with a separate ladder against it, showing the 245 cm deck you hire

You hang four to five lengths per pitch. Only then do you move: set the bucket on the floor, release the brakes, shunt the scaffold on to the next pencil line and brake it again. Carry up with you only what you can hold in your two hands, because every trip back down costs you exactly the minutes in which the paste is starting to grab. More on tackling large faces is on the page about hanging wallpaper on walls.

Room scaffold hire with delivery before you start wallpapering

The scaffold reaches your door as a collection of loose, counted parts. For indoor work that suits you, since it lets you carry it through the hall in pieces without knocking a door post. Pick a spot in the hall or in an adjoining room to lay the parts down, and not in the space where the pasting table has to go. Reserve on a working day, before 15:00 has gone, and your set travels out to you the working day that follows.

Both the day of the delivery and the day of the return trip are yours to choose. On papering work you would rather have the parts arrive on the day you strip the old paper off, so you can use the build straight away for steaming and sanding. Assembly remains work for yourself; paper instructions come with it and footage of the right sequence is online. Between two of you, you are usually standing on the deck within the hour.

Scaffold parts delivered on site, the set you carry indoors piece by piece for a papering job

Once the paper is up and dry you take the room scaffold apart and carry the parts back to the hall, where we collect them on the agreed day. Hold off dismantling until the seams have closed, because a frame scraping past a fresh length costs you a whole roll. The price for bringing it and taking it away again varies by province; you will find those amounts under the tariffs for delivery and collection, so you can reckon in advance.

Wallpapering safely on a room scaffold you have hired

A platform in load class 3 will take some 200 kg per square metre under the standard EN 1004. On wallpapering you are quickly done with that, unless the two of you go up together with a bucket of paste between you. That happens more often than you would think, for instance when somebody comes to help press a difficult seam home. Add up what is genuinely up there before you both walk to the same corner. More on capacity is in the explanation of loading.

The fixed rules do not change indoors. Brake the castors before you take the first rung, climb up on the inside, and never roll the scaffold a little way with a person or a bucket on top. That last is a real temptation while papering, because after each run of lengths you want just that half metre of shift. Step off, move it, brake, and then climb again. At every new spot check that the four stabilisers stand firm.

Built up scaffold with guard rails around the deck, the surround you work inside with wet lengths of paper

The risk that belongs here is going slippery. Paste dripping off a length or falling from your brush leaves a smear on the deck boards where your shoe skates away, and it barely shows because it is transparent. Wipe it off at once and keep a dry cloth up top within reach. Think of the people below you too, because a trimmed strip of paper is wet and heavy and drops without warning. The rules are listed at work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for wallpapering a high wall

1

Mark every seam with a pencil and a plumb bob before the scaffold is in the room. From the platform you can no longer drop a plumb line, and that very first line decides whether the whole wall runs true.

2

Cut the lengths for a whole pitch in one go and number them on the back. Then you need not go down between two of them, and the paste keeps soaking evenly into the wallpaper left on the stack.

3

Drape a towel over the guard rail on the side the length passes. Wet paper that brushes a bare tube picks up a mark there which you will never get out of it again afterwards.

4

Stand the pasting table square to the wall instead of alongside it. That way you can shunt the room scaffold along the wall without having to shift the table or walk around it each time.

5

Keep a bucket of lukewarm water and a sponge up with you. Paste that lands on the face of the paper has to come off at once, and the trip down takes far too long to sort that out.

6

Ask for the delivery a day before you begin the preparation. You already need the hired scaffold for the steaming and the sanding, not only at the moment the first roll is opened.

Frequently asked questions

Frequently asked questions about wallpapering a high wall

Which scaffold should you hire to paper a high wall?+

Indoors the RS44 room scaffold is the logical pick: 3 to 4 metres of reach and parts that pass an interior door from about 70 cm. Up top you need a solid floor to turn a wet length on, and no ladder will give you that. To hire a mobile scaffold of the outdoor kind makes no sense for this job, since it will not enter the room and holds you too far from the seam. Measure your narrowest opening first.

How does hiring a room scaffold for wallpapering work?+

You put your model and build together online, pick the day it comes and the day it leaves again, and see the price including VAT straight away. We deliver the counted scaffold parts to the door, you carry them in, build, and paper the wall length by length. At the end you lay everything ready dismantled and we drive past to take it. What you plan around is the drying time of the size.

How many days do you have to hire for a high wall in paper?+

Two to three rental days is realistic for this job. Stripping the old paper, washing the wall, filling, sanding and sizing are largely done from the same pitch, and only after all that does the papering itself come. A stairwell or a void with several walls runs to four days easily. Rather take the scaffold a day longer than stand at the end watching the clock with two lengths unhung. It costs almost nothing on the bill.

What does a scaffold for papering cost to hire and how does the discount sit?+

What you pay is set by the build height, the model and the transport to your address and back. You see those amounts including VAT before confirming the booking. The structure of the rental price falls kindly on papering work, because the first twenty four hours weigh heaviest and every following day adds only a fraction. Booking a mobile scaffold or a room scaffold generously at once is therefore smarter than twice briefly.

Which working height should you hire if the lengths run to the ceiling?+

Then choose a build reaching 4 metres of working height, so you can line the top edge up calmly without stretching. Measure from the floor the scaffold will stand on up to the ceiling line, and do that at a few places along the wall. That figure settles both the length you cut the paper to and the height you pass on when you hire. Where you are in doubt, take the roomier of the two builds.

Do you have the room scaffold delivered or collect it yourself?+

Either works, and it comes down mostly to your car. Choose delivery to the house and the set arrives on the day you marked and travels back when you are done, against a fixed amount that depends on your province. Collecting it yourself is fine too, by appointment and at no charge, from Zeeburgerpad in Amsterdam. Because a room scaffold is made of fairly short parts, a set like that usually fits in an ordinary car with the rear seat down.

Does the room scaffold arrive built up when you hire it?+

No, we bring the parts and you put them together yourself. That sounds worse than it is: paper instructions come with it, there is footage of the building sequence, and with two people a room scaffold is standing inside the hour. Afterwards you strike it yourself as well and we collect it. Plan that build time on the day you strip the old paper, and you lose no papering day to it.

Can you rent for longer if the papering takes more time than expected?+

Yes, raise the flag the moment you see the planning slipping, and the collection day moves with it, unless the room scaffold is already booked for somebody else. On papering it is usually the preparation that overruns: a wall wanting more filler, or a coat of size drying slowly. Anyone wanting to be ahead of that reserves an extra day at once. Handing back early is allowed too, so a generous margin costs you virtually nothing.

How much room must you leave beside the scaffold you are going to hire?+

A pasting table is soon two metres long, and it has to fit next to the pitch without your having to walk around it. So count on the width of the scaffold, the spread of the stabilisers and a strip beyond that for the table and a bucket of paste. Stand the table square to the wall, and you can shunt the hired frame along without having to move everything again each time.

Can you keep it on hire while the paper dries on the wall?+

The scaffold may simply stay standing, castors braked, and that is the sensible course: you want to be able to roll the seams again the next morning. Ventilate steadily in the meantime and keep a heater off the wall, or the seams will pull open instead. Because you fix the collection day, an extra night of hire costs you only a fraction of what the first day does. Take nothing off the platform in that time.

How does the deposit work if you hire a scaffold for wallpapering?+

You pay a deposit at the reservation; after the return trip we count the papering scaffold off and book that sum back within one working day. On this job watch the paste above all: wet it wipes away in a second, dried onto a deck board or a coupling it does not. Keep a damp cloth to hand up top and go over the frame before you take it apart and stack the parts in the passage.

Is hiring a room scaffold necessary or will you manage with a ladder?+

With a ladder you will not manage once the lengths run beyond two metres. You need both hands, you have to be able to step sideways, and a brush, a knife and a seam roller must all lie within reach. A room scaffold gives you a fixed floor at working height and the chance to hang four or five lengths in a row. That tells in your pace, and above all in the number of lengths you spoil.

Hire a mobile scaffold for wallpapering a high wall today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.