See your price
Application

Staining decking? Choose the right scaffold.

Staining decking looks like kneeling work, and on the walking surface itself that is exactly what it is. The moment the deck sits on a roof terrace or a raised patio, the difficult part hangs on the outside: the upstand, the exposed ends of the boards and the joists carrying it all. You will not reach those from the terrace, however far you lean over the edge. For that half of the job you hire a MiTower, a one-person tower put up for 4 to 6 metres of working height.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For staining decking we recommend the 1-person scaffold.
  • You stain the walking surface on your knees, but for the edge and the joists of a raised terrace you hire a MiTower.
  • Pick a penetrating stain rather than a film-forming varnish, because on a horizontal walking surface such a coat lifts within one season.
  • Take the grey off the timber first and run a foil moisture test, or you seal damp in underneath your new stain.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for staining decking?

Safe, stable and professional work at height

On a deck up in the air the job splits neatly into two halves. The surface you walk on gets done sitting or kneeling, brush following the grain. The edge, the exposed ends and the joists below hang out over the garden, and you cannot get at them without leaning over a balustrade with a tin in your hand. Hiring a scaffold for staining decking solves precisely that: you stand at working height alongside the terrace and look at your timber from the side and from below. Needing only one person on the platform makes choosing a model simpler here than on any job at a wall.

  • Edge and joists hang out above the garden
  • One person with tin, brush and cloth
  • Light enough to shift along on your own
  • Reach right under the decking joists themselves
Read more about working safely →

Hiring a MiTower for staining decking at height

For this work you end up at the Altrex Mi Tower, a slim 75 cm tower meant for a single user. Staining decking is a solo job anyway, since two people on the same run of edge keep meeting and pull each other's wet band open again. The Mi Tower is also light enough to shift along the terrace on your own, and you will do that more often than you expect beforehand. Every version sits in the hire range for this compact tower.

What goes up with you is modest: a tin of stain, a block brush, a sanding sponge, a roll of tape and a rag in your jacket pocket. All of that fits easily on a platform measuring 245 cm, a length that decides how many metres of edge you finish from one position. The width of 75 cm matters more, because it takes you through a garden gate, along a fence and between the border and the terrace without sacrificing your planting or unscrewing a fence panel.

Folded tower guardrail frames stacked upright in a cargo bike parked at the front steps of a town house

A wider mobile scaffold adds little here. You are not carrying tubs or sheets up, and you need no second pair of hands on the platform, so the extra components mostly mean more lugging through the garden. Around a large roof terrace it can be different: with dozens of metres of edge you may prefer to hire a mobile scaffold with a longer deck and reposition less often. Which of the two answers better here is weighed up in the comparison of both hire models.

Which working height to hire for your roof terrace edge

Measure to the highest point you still intend to stain, which is usually the top of the upstand running round the deck. If the terrace sits on the first floor or on top of an extension, that edge is soon three to four metres above the grass. Add the room you need to stand at it comfortably and the answer lands in the band of 4 to 6 metres, measured as working height, even where the decking sits a little above the floor level indoors.

In practice that means a deck somewhere between two and four metres up, since your brush reaches roughly 2 metres above the platform height you order. Your nought point lies at the castors down in the garden, not at the decking you will later kneel on. A garden that falls away from the house, or a sunken border along the wall, makes that difference larger than the eye suggests. Measure it with a tape from the grass rather than guessing it from the terrace, and note the figure down before you book the hire.

Tower erected in the narrow strip beside a brick house, ladders and a hedge crowding the frame on both sides

Order a build that is too low and you stain the top edge with a stretched arm and never see the underside of the joists at all. That is exactly where the greying and the rot start, because moisture lingers there longer than on the walking surface. Take one step more rather than one less, certainly where the joists of your terrace run on under the boards. What a build of six metres involves and how high a first floor sits are both set out separately.

Hiring a scaffold and standing it under a raised terrace

On this job the set-up ends up in the middle of the garden, which is a different story altogether from a tower on a pavement of setts. Grass sinks under the castors after a single wet day, molehills and tree roots make the ground uneven, and a border stays soft to half a metre down. So lay stout planks or track mats under the feet, and check the set-up again every single time you have moved it a few metres along the terrace.

Around the base you need clearance for the stabilisers, which stand out at an angle. In a garden they collide with all sorts: the water butt under the downpipe, a barbecue, garden chairs, a trampoline or the low wall of a raised planter. Put that lot further away rather than closer, and take the water butt off its stand if it sits under the run. Clear the ground along the whole length you intend to work, because while staining decking you keep shifting a stage further along the edge of the boards.

Scaffold frames with red castors, orange braces and dark platform decks laid out on a mown lawn under trees

Look at what hangs above you as well. A terrace on the first floor often has a canopy, an awning or an overhanging roof edge, and those sit precisely at the height where you will be standing while staining decking along that side. That decides how close to the wall you can bring the set-up, whether the top deck still fits underneath and how far you have to reach outwards. Getting a tower level on soft or sloping ground is explained in the piece about uneven ground.

How many days to hire a scaffold for staining decking

For this job you count on two to three hire days. Putting the stain on is quickly done, but the preparation sets your timetable: first the grey comes off with a timber cleaner or grey remover, then you rinse it down, and after that the wood has to dry right through. Damp timber takes no stain, and a deck that looks dry can still be wet underneath. That drying spell is exactly why you need the tower longer than the hours you spend with a brush.

So run a moisture test before you start. Tape a piece of clear foil onto the boards, leave it a few hours and see whether condensation appears on the underside. If the plastic stays dry, the brush can go in. If you see droplets against it, you wait another day and test again. Putting two coats on adds a further drying period in between, and the length of that is decided by the product rather than by your diary.

Mobile tower standing against the flat front of a modern apartment block, reaching past the first row of windows

The way the rate is built up makes such waiting affordable. The whole figure is charged once, over the first 24 hours; after that each further hire day comes in at 95 per cent less. A spare day held back for an unexpected shower therefore costs you almost nothing extra. Set the period too tight and you stand there with a half-treated edge waiting on the collection round. Amounts per model are shown on the page listing hire rates.

Which mobile scaffold suits staining decking?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Board by board from end to end off the platform

Stain goes on one board at a time and over its full length, from one end to the other. Break off halfway to move your set-up and the edge of your band dries out, leaving that overlap visible in the timber as a stripe for good. So look first at which boards fall within your reach and finish them completely before you shift the tower a stretch. The deck length of 245 cm gives you a run of edge per position that you can cover without stretching.

Choose a product that soaks into the wood instead of forming a skin on top. Decking is a horizontal surface where water stands and where you also walk, and a film coat comes away there in flakes within a season. A penetrating stain fades rather than letting go, which means that the next time round you only have to clean the boards and feed them again, without sanding the whole deck back to bare timber first. That difference alone can save you a hire day.

Stabilisers braced outwards at the base of an erected tower on paving, with a clipped hedge close behind it

From the platform you pick up the parts that seem not to matter from above: the outer face of the upstand, the cut ends of every board and the joists of the structure. Those end grains drink moisture like a straw, so give them a second pass with the brush without hurrying. Do not work in full sun, because the stain then flashes off too fast and leaves you with a patchy surface that never evens out afterwards.

Hiring a MiTower, having it delivered and building it yourself

The date the tower arrives and the date it leaves again are yours to pick when you reserve. Book on a working day with 15:00 as the cut-off and the parts travel out on the next working day. For this job you aim the drop-off at the start of a dry spell: a day of cleaning first, then drying, and only then the stain. A wet week at the beginning costs you two days of your period straight away, and that loss is rarely made up later.

What you receive is a set of separate parts, counted in advance, which you put up yourself. A manual comes with it and the steps are shown in a video as well, which suits this model, since the whole thing is designed so that one person can raise it alone. Agree where the bundles may be set down. In a back garden that is usually the terrace or the path beside the shed, because dragging them over wet grass leaves marks for a season.

Scaffold parts laid out in two rows on a block-paved drive either side of a parked white car

Once the last board is done you take the tower down and lay everything back on the agreed spot in the garden, after which we come for it on the day you chose. There is no driving about for you. If you live nearby and have transport, the set can also be picked up at no cost from Zeeburgerpad 89 in Amsterdam, once a slot is agreed. With this light model the whole lot usually fits in the back of a van.

Safe working on the MiTower you hire above the garden

The deck takes 200 kg per square metre, which is the starting point of load class 3 as EN 1004 describes it. Staining decking never comes close to that limit, since only one person is up there with a tin and a bit of small kit. More to the point, this model is intended for one user: do not let anybody climb up with you to lend a hand, not even for that awkward stretch of edge behind the downpipe where two pairs of arms seem useful.

Close the wheel brake before you go up and leave it closed for as long as you are working aloft, including between two boards. You move the tower with an empty deck, so take your tin and your brush down first before shifting the set-up a stretch. In strong wind you stop staining, because leaves and dust blow into your wet band. You also have less to hold on to at this height than you would think from the ground.

Tower frames, deck boards and orange diagonal braces resting on a paved forecourt beside a white glazed door

On this job watch spilt stain under your feet above all. A drop on the deck of your scaffold or on the boards is slippery as grease the moment you tread on it, and you find that out at the wrong moment. Work with a rag within reach and wipe spatters away at once, including any on the rungs of the ladder. Think about who walks below you too: children and pets like to come and look, right under the edge you are treating.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for staining decking

1

Test your stain on a board under the garden bench before you do the whole deck. Weathered timber takes the colour deeper than the sample on the tin suggests, and you only see that once it has dried.

2

Take the grey off with a timber cleaner and a stiff brush rather than a pressure washer. A hard jet tears the soft summer growth out of the wood and leaves your decking rougher than it was.

3

Give the cut ends of the boards two coats each. Timber draws moisture there like a straw, and on a raised terrace those ends hang free in the wind and the rain, out of reach from the deck.

4

Work with the sun rather than into it. On a surface warmed by the sun the stain flashes off before you have brushed it out, and every start and stop of the brush stays visible.

5

Tape a piece of foil onto the timber and leave it a few hours before you begin. Condensation underneath means the deck is still giving off moisture and that your hire period shifts a day.

6

Run the tower along the whole joist structure once at the end and look up at it from below. The spots you cannot see from above are often the ones that grey over again first.

Frequently asked questions

Frequently asked questions about staining decking

Which scaffold do you hire for staining decking on a roof terrace?+

The MiTower suits this best: a tower 75 cm wide, meant for one user. You work alone when staining decking anyway, so more deck buys you nothing, and this model goes through a garden gate and along a fence. On top of that you slide it along on your own while finishing the edge. When you reserve, you pass on the height you have to reach and the days you want the scaffold standing there.

How does the hire work for a deck on the garden side?+

Through the site you settle the model, the height you need and the days on which delivery and collection may happen. The parts are dropped off and you assemble the tower yourself beside the terrace, working outward from the corner you want to start at. After that you clean the timber, let it dry and stain board by board. Once the last cut ends are done you take it apart and set the components ready for the day of collection you picked.

How long a hire period does the edge of a deck take?+

Two to three days with the scaffold is usually enough for staining decking. Cleaning and taking the grey off takes half a day, then the timber has to dry right through, and only after that does the brush come out. If you want two coats on, add another day to that, plus a margin in autumn. Because you set the collection date yourself when hiring a tower, you simply build that drying day into your period without it costing much.

What do you pay to hire this tower, and what happens from day two?+

The rental price is listed online per scaffold and depends on the height you want to build it to. For this job what counts most is how the days are added up: the opening day goes at the standard figure and every following one falls under the discount rule. A three day period therefore costs far less than three separate days would, which helps a great deal when you have to sit and wait for the decking to dry out.

Which working height should I hire if the terrace is on the first floor?+

Measure to the top of the upstand around your deck, because your brush still has to reach it. With a terrace on the first floor you usually end up hiring a scaffold in the 4 to 6 metre band. Keep an eye on the underside of the joists as well: you want to reach those from the same set-up while staining decking, or you will be rebuilding at a different height halfway through the job and losing an afternoon to it.

Do I have to build the MiTower myself when I hire it for stain work?+

Yes, that assembly is your part of the work and the instructions travel with the tower. This model is made precisely so that one person can manage it alone, so you need not round anybody up before you start. We bring the complete set to the agreed spot and take it away again afterwards. A tower delivered ready assembled is not something we do; nor are fixed facade scaffolds or cherry pickers part of what we hire out.

Can I hire for longer if the decking is not dry enough yet?+

Yes, and on this job damp is by far the most common reason to extend. Stain on wet timber will not bond and flakes off later anyway, so waiting beats pressing on. Tell us that another hire day is needed, the tower stays standing and the collection date moves without further fuss. Given how heavily the following days are reduced, that beats taking everything down and booking a second period for the same run of edge.

How much room does the garden need for a hire like this?+

Count on a strip a metre and a half to two metres wide along the whole edge you are treating, because the stabilisers of the tower stick out at an angle. The ground has to take that pressure, so lay planks underneath on grass or soft soil. Think about the way in as well: a gate or a path between two fences decides whether the model you want will pass, and that is better measured now than on delivery day.

What do you do with the hire period if it rains while you are staining?+

You put the brush down, because wet decking will not take stain any more. The tower can simply stay standing as long as you do not climb it in a strong wind. Use a day like that to sand the edge ready, tape off the wall or lay your things out in the shed, and push the collection date of your scaffold back a day if the rain sets in for the week. Letting us know in good time is all that takes.

How soon is the deposit returned after this hire period?+

Your deposit comes back within one working day after we have collected the set, and that sum stands entirely apart from the cost of the hire itself. Lay all the components ready, complete, on the spot where they were put down. On this job take a moment to get stain spatters off the deck boards, because dried stain is a good deal harder to shift than a fresh spot wiped away with a cloth.

Can the same hired tower reach the underside of the deck as well?+

Yes, and that is exactly the reason for taking a scaffold in the first place. From the platform you look at the joists from the side and from underneath, so you notice by yourself where the timber is darkening or where moss has settled between the beams. Take a small mirror or your phone camera up, so you can see behind a joist too. That saves you discovering next year that a beam needs replacing.

Hire a mobile scaffold for staining decking today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.