See your price
Application

Installing a sign? Choose the right scaffold.

Installing a sign is precision work at height. The box has to go up, hang dead level, line through with the shopfront below it and then be wired to a supply. That only comes off if you stand still and solid, two people side by side, with the drill within arm's reach. For fascia signage on the second or third storey the wide RS52 at 135 cm belongs with it, hired in a build reaching 8 to 12 metres. Below is what else to arrange before you book.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For installing a sign we recommend the Wide mobile scaffold.
  • For installing a sign on a facade you hire an RS52 at 135 cm wide, built to 8 or sometimes 12 metres.
  • Everything travels upward here: the sign, the anchors, the drill and the cable, which asks for deck room for two fitters.
  • Installing a sign runs over two hire days, since setting out and drilling fill day one and hanging fills day two.
  • First 24 hours from €175 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldWide mobile scaffold (Altrex RS TOWER 52)
Working height for this job8 to 12 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €8.75 a day
Why a mobile scaffold for installing a sign?

Safe, stable and professional work at height

Mounting a sign is about alignment. A board hanging two centimetres out of true is obvious from across the street, and correcting it means drilling again into a facade that will not thank you. So you work from a floor that does not flex, with room to lay a metre level along the bottom edge and both hands free. On top of that the box behaves like a sail at the very moment you are steering it onto the anchors, and there is public walking underneath you. Hiring a mobile scaffold for the job of installing a sign is therefore about stability, about deck width, and about a schedule with room in it.

  • Levelling the sign against the shopfront below
  • Anchors drilled into brickwork or into concrete
  • Supply connected and the cable tucked away
  • The sign catches wind as you place it
Read more about working safely →

Which mobile scaffold to hire for installing a sign

For fitting work on facade signage you take the Altrex RS52, the version 135 cm wide. That has everything to do with what travels up with you: the sign itself, a set of anchors, the hammer drill with its dust extraction, a level and the tools for making the connection. On a floor of 135 by 245 cm all of that goes down without anyone tripping over anyone else's kit. The overview of mobile scaffolds in the hire fleet puts the models beside one another.

We carry this model in working heights starting at 4.2 metres and going as far as 14.2, and for signage on the second or third storey you pick a build of 8 to 12 metres out of it. The platform length of 245 cm is at the same time your measure for how much sign you can hang per set-up. If the box fits inside it you hang it in one go; longer than that and you fit it in sections, moving between them, which can cost half a day.

Wide mobile scaffold built along a modern shopfront, the working deck from which a sign is lined up and bolted

A one person tower such as the MiTower drops out on this job, however handy it is elsewhere. You do not lift, aim and hold a sign on your own, so there are always two of you up top and they do not fit on that deck together. The narrow RS51 at 75 cm is for the case where the access to the facade allows nothing wider. You then stand more cramped at the exact moment you hold the box against the wall and start the first bolt.

Which working height to hire for fitting facade signage

When installing a sign you measure not to what hangs there but to where it is going. Take the drawing or the design, settle the height for the top edge of the box and mark that point off on the facade. With signage above a shopfront, on the second or the third storey, that comes to 8 to 12 metres of reach. The deck itself lands between 6 and 10 metres, because your arms still cover about 2 metres above it.

You start measuring at the paving where the castors will stand. At a building with a kerb, a recessed entrance or a street that falls away, that starting point shifts and with it the whole build you need. Take the topmost anchors into your measurement as well, because they sit higher than the bottom edge of the sign you are looking at. If in doubt, work from the top of the frame and not from the top of the lettering. What a working height of 12 metres brings you is on that page.

Tower built well above head height against a brick wall, with a loose ladder leaning on the bricks next to it.

Book too tight and you notice it when you line the sign up. You have to be able to sight along the top edge to see whether the box runs true with the windows below, and that fails when you are peering upwards. A level, too, is better laid against the profile at chest height than held over your head, where you can hardly keep it still. So choose the build that puts the sign flat in front of you, roughly at the height of your own chest.

Hiring a scaffold to stand on a pavement with shoppers

Installing a sign happens on the street side, so your arrangement stands on the pavement and sometimes partly in a parking bay. Fence that zone off before you start. Dust and grit fall while you drill, and a little later a sign is hanging above the heads of passers by who know nothing about it. Keep a way through along the facade for the shop's customers, and agree with the trader when you are in front of the door and when you clear it.

Paving is fine ground to work from, provided you look at where the stabilisers come down. A tree pit, a falling gutter line, a manhole cover or a cellar hatch are exactly the places you do not want them. On a build of ten metres those four feet decide how still your tower stands, and standing still is everything while you align: a deck that moves turns levelling into guesswork. So read what applies to the height of a mobile scaffold before you hire.

Mobile scaffold standing hard against a facade at street level, the position a signage job needs on the pavement

Sort the practical things well before the delivery date: consent from the council if you stand on the public highway, a spot where the van may unload, and power for your drill. That last one gets forgotten. A cable reel running across the pavement is a trip hazard, so lead the cable along the facade or hang it up. Reserve a length of pavement as well where the sign can lie until the moment it goes up, flat and out of the wind.

Hire days for installing a sign: setting out then hanging

This job rarely fits inside one day. On the first day you raise the tower, mark out the positions, drill the holes and set the anchors. On the second the sign goes up, gets aligned, is bolted home and connected. In between, with chemical anchors, sits the curing time the maker prints on the cartridge, and you do not skip it, because otherwise your sign hangs on anchors the resin has not yet gripped. That waiting is the reason a single hire day never covers this.

So book two hire days as standard and put a third behind them if you are unsure. That costs less than people think: the whole tariff applies to the opening twenty four hours only, while each day you add after that is reduced by 95 per cent. What a period comes to in total you work out from the amounts on the page with prices. A day of slack also gives you air when the electrician can only call later for the connection, or when the sign arrives a day late.

Scaffold frames propped against a facade at pavement level, the hire set that stays with you over two working days.

Then reckon with things outside your own planning. A sign of any size is not hung in wind, and above a shop doorway you often work only at quiet hours. Delivery of the box itself sometimes slips a day too, and then you do not want your arrangement collected that morning. So set your collection date one day past the point at which you expect to be finished, and simply let us know as soon as the sign hangs.

Which mobile scaffold suits installing a sign?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Most chosen
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Installing a sign from a platform of 245 cm

Begin with the setting out. Measure from a fixed point in the facade, a storey band or the head of the shopfront, and mark your centre lines with a long level or a cross line laser. Only when those lines are right does the drill come out. Working with a sign wider than your platform, run a string between the outer points so the anchors land at one height across two set-ups. Move the tower only once every hole in that field is drilled and blown clean.

The sign goes up on a rope along the outside, with somebody below guiding it and watching the barrier. Never climb the internal ladder carrying it: you need both hands and the panel catches wind on the way. Up top you take it with two, fix the upper points loosely first, check the line and only then pull everything tight. Last of all you make the supply connection and finish the cable entry weathertight, which is the point at which the sign is genuinely installed rather than merely hanging.

Hired tower beside a side elevation, the 245 cm deck length that sets how much sign you hang per set-up

The contrast with the opposite job is large. When you are removing an advertising sign the weight travels down and you finish with anchor holes to fill. When you install, everything goes up, the emphasis falls on aligning, fixing and connecting, and the facade is occupied afterwards rather than bare. So plan more time here for measuring and less for clearing up, and count on correcting the last centimetres with two people while the box already hangs on its top anchors.

Hiring a mobile scaffold with delivery to a shopping street

Your mobile scaffold arrives in loose parts, the full set counted off, at whatever spot you have pointed out. With a building on a busy street you settle that beforehand: on the pavement inside your barrier, or in a parking bay you have kept free. Book on a working day with your order in before 15:00 and the set travels to the address on the next working day. Then you can build a day early and start installing a sign the next morning.

Assembling the tower is work for you; our driver only unloads the parts. A manual comes with it, and the instruction video online demonstrates the sequence step by step. With two fitters you are standing at height inside half a day, provided all the parts lie within reach. So choose your dates so the building does not coincide with the busiest hours of the street, or you will spend most of it on people wanting to get past.

Scaffold parts laid out along the street ready for building, the delivered set you start a signage day with

Once the sign hangs and the lighting burns, the tower comes apart and you lay the parts ready for the return trip. We come by on the date you picked, so see that everything lies together where the van can pull up for a moment. Count the parts as you dismantle rather than afterwards, and the handling of the hire runs without fuss. What bringing and fetching cost differs per province and stands with the delivery rates per province, including VAT.

Installing a sign safely on a hired mobile scaffold

The floor under your feet falls in load class 3 to EN 1004 and may take 200 kg per square metre. On fitting work you fill that faster than on other facade jobs: two fitters, a hammer drill, a box of anchors, a sign and sometimes a battery pack or a transformer. Spread it over the deck, lay the box against the wall side rather than on the edge, and take down whatever you no longer need after each set-up.

The basic rules stand: brakes on before anybody climbs, nothing and nobody aboard while the tower is moved, and work stopped when it blows hard. On this job the panel itself is added to that, because a sign you send up on a rope turns on its axis in a gust. So pick a quiet morning, and keep the panel roped until both top fixings are through. More on the limits at height is in the explanation of safe working at height.

Hired tower standing on a front elevation above the footway, the strip that stays fenced off while fitters work

Below you there is public that does not look up. So work with a tool lanyard, keep a bucket or a bag on the platform for bolts and bits, and leave nothing lying on the edge. Wear eye protection while drilling and mind the cable you are connecting: switch the circuit off before you start on wires. Leave your barrier standing until the sign is properly fixed and nothing more can fall, even once you are back down yourself.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for installing a sign

1

Installing a sign starts with the centre lines, marked before the drill comes anywhere near. A pencil line is corrected in ten seconds; an anchor set wrong in a facade costs you half a day and a repair.

2

Ask the sign maker for the weight and the number of fixing points. With that you settle beforehand whether two people on a rope will do, or whether lifting aids have to come as well.

3

Take drill bits in two sizes up with you. If you run into hard stone or into concrete in the facade you need not go down, and you lose none of your hire day.

4

Blow or vacuum the holes out before you set anchors. Dust in the hole halves the grip of a chemical anchor, and that only comes to light when the sign has hung there for months.

5

Hang the sign loosely on the top points first and go down once to look from across the road. Close up you never see a line running off as well as from the far pavement.

6

Let the electrician come on the second hire day, when the sign is already up. Otherwise he stands about waiting for the tower that you still need yourself for the fixings and the last of the alignment.

Frequently asked questions

Frequently asked questions about installing a sign

Which mobile scaffold should I hire to install a sign?+

Hire the wide RS52, the mobile scaffold at 135 cm. On a fitting job two people stand up top and material goes with them: anchors, a hammer drill, tools for the connection and the box itself. On a narrow floor you get in each other's way at the moment you hold that box against the facade. Only with a genuinely tight access do you fall back to the RS51 at 75 cm. A MiTower drops out, being a tower for one.

How does hiring a tower for facade signage work?+

You set the model and the working height online, then name an arrival date for the tower and a date on which it goes away again. We bring the complete set to the building, you assemble, drill the anchors, hang the sign and connect it. After that you take the tower apart and we collect it again. With premises in a shopping street it is wise to have the delivery fall at a quiet time, so you can build the tower without an audience gathering round the parts.

How many hire days does installing a sign need?+

Reckon on two days. Marking out, drilling and setting anchors fill the first; hanging, aligning and connecting fill the second. Working with chemical anchors puts the curing time from the packaging in between. With a large sign running over several set-ups a day is easily added, because every move means putting the stabilisers out afresh. Since later days on a tower hire hardly register, you can fix that margin straight away rather than trying to squeeze the fitting of a sign into a single booking.

What is the rental price for such a tower on a fitting job?+

That follows from the model, from the working height and from your province for the trip out and back. The amounts stand online including VAT, so you see beforehand what a period comes to. With fitting work what counts is that the first day carries the weight and an extra day changes little after it. Two or three days on hire therefore differ less than you would expect, while the planning around installing a sign becomes a good deal calmer.

What working height do I hire for a sign on the third storey?+

For facade signage at that height you usually land between 8 and 12 metres of working height. First settle where the top edge is to hang according to the drawing, measure that off from the street under your castors and add the uppermost fixings. If the point turns out higher than you thought, hire a build one stage roomier; standing too low costs you more time in the aligning than the taller build ever does. The page on working heights shows which build suits which reach.

Can I hire a mobile scaffold with delivery to premises in the centre?+

Yes, and with this kind of building that is usually the handiest option. Say where the set may be laid down and tell us when the street is only reachable for part of the day. Driving yourself is fine as well: collection at Zeeburgerpad in Amsterdam is free by arrangement, so long as the whole set goes in your van. Bear in mind that a tower for ten metres runs to a good many parts, so allow serious load space.

Do I put the tower up myself when I hire it?+

Yes, that is yours to do or your own fitters' to do. We drop a counted set and pick it up again afterwards; the instruction video shows the order it goes in. With two people you are about half a day away from standing at height and ready to start marking out. Nothing in our range is built from system parts, nothing hangs off the facade and no cherry picker is on offer, so signage at this height is worked from a tower you raise and move yourself.

What if the fitting work overruns and the tower is needed on hire longer?+

Give us a shout as soon as you see it taking longer, and we shift your collection date if that tower is still free. On fitting work an overrun often comes from a facade turning out to be built differently than expected, from the sign arriving later, or from the electrician still having to call. Reserving generously up front works out better on the hire than extending it afterwards, and reporting the tower back early is always allowed.

How much clear space does the hired arrangement need on the pavement?+

You need the width of the arrangement plus the room for the stabilisers, and your barrier around all of that. Beyond that you want a place where the sign can lie until it goes up and where the cable reel is out of the walking line. In a shopping street that often comes down to a parking bay kept free. Ask the council about it before you book the tower, because without that room the stabilisers cannot go far enough out.

Can I hang a sign if it is windy during my hire period?+

Sending a panel up and aligning it is not done in wind, because the box turns on the rope and pulls at your arms as soon as it comes past the facade. Drilling, setting anchors and preparing carry on as normal. The tower stays standing if you have to wait half a day, and since you set your own collection date the delay is no problem. A calm morning remains the best moment for the hanging itself.

How quickly do I get my deposit back after hiring for this job?+

After the return trip we count the set through, and within a working day of that your deposit is back in your account. On fitting work watch for drilling dust and sealant on the decks and for anchor material left among the parts. Walk everything past once before the collection day, inside your barrier on the pavement too, so no brace or stabiliser is left behind. A tower that counts up complete keeps the handling short.

Can the electrical connection be done on the same hire day?+

It can, and it is often the handiest order: the sign hangs, the cable is fed through and the electrician finishes it while the tower is still up. Do line that appointment up with the second day of your hire period, because on the first you are still marking out and drilling and the box is still on the ground. See that the circuit can be switched off and that somebody on site can open the consumer unit.

Hire a mobile scaffold for installing a sign today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.