See your price
Application

Fitting a name sign? Choose the right scaffold.

A name sign on a commercial building is not a little plaque: it is a panel two to four metres wide, it weighs tens of kilos, and it hangs on fixing points that all have to sit on one line. Nobody lifts that up a ladder. You work in pairs, you hold the bottom edge dead level across the full width, and you are usually above the entrance or against the first floor. For that you hire the Altrex RS51, a 75 centimetre wide model reaching 6 to 8 metres of working height.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For fitting a name sign we recommend the Narrow mobile scaffold.
  • For a name sign on a commercial elevation you take the narrow RS51 from the fleet and build it well above the entrance.
  • Choose a build that gives you between 6 and 8 metres of working height, since a sign panel rarely hangs below first floor level.
  • Count on two people on the platform, because the panel has to be held level with both pairs of hands at once.
  • First 24 hours from €150 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffoldNarrow mobile scaffold (Altrex RS TOWER 51)
Working height for this job6 to 8 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €7.50 a day
Why a mobile scaffold for fitting a name sign?

Safe, stable and professional work at height

The difference from a small plaque lies in weight and in line. A panel three metres wide hangs on several anchors, and if the left point is four millimetres out from the right you see it from across the road immediately. So you have to be able to measure, drill and correct across the full width without climbing down each time, and you need somebody carrying the panel while you fix it. Two people side by side, tools within reach and a solid floor: that is precisely what a ladder does not give. Hiring a tower for fitting a name sign is therefore about width, load capacity and shuffling sideways.

  • Fitting a name sign that hangs on several anchors
  • Two people at once on a solid floor
  • Level across the whole width of the panel
  • A build of six to eight metres
Read more about working safely →

Which mobile scaffold to hire for fitting a name sign

For this job you hire the Altrex RS51, a narrow mobile scaffold of 75 cm that fits between parked cars and the building line and still goes up high enough. At commercial premises the entrance often sits straight onto the pavement, and then that slim footprint is the difference between being allowed to set up and not. Which other sizes there are you can see on the page with the full range of towers for hire.

Not much has to lie on the deck, but two people do have to work side by side on it. A rotary hammer, the anchors, a long spirit level and the panel itself: there is little more to it. The 245 cm length matters more here than the width, because it spans a good stretch of the sign in one go so you do not reposition while lining up. A wider model gives you more floor but no extra reach sideways.

Frames and orange braces laid on a brick drive, the 75 cm hire set that fits between kerb and building line.

Do not confuse this with the small plaque beside the door. If it is an engraved plate at a practice or a home office, a lighter model is enough, and there is a separate page on putting up a small nameplate. Here we are talking about a sign panel with weight, several anchor points and two fitters, and that calls for a tower you build higher than entrance level. The difference is not in the name of the job but in what has to hang on the wall.

What working height to hire for a sign above the entrance

The governing point is the top edge of the panel, not its centre. On commercial premises a sign usually hangs just above the shopfront or on the band between ground floor and first floor, which puts that top edge at four to six metres. Measure from the pavement you will be standing on, so from the bottom of the wall, and add the height of the sign itself. Those two figures together decide what you book in the rental diary.

Then you translate that into a build. Working height is simply the height of your deck with roughly 2 metres of reach added on top, since your arms bridge the last stretch. A sign whose top edge sits at six metres therefore does not need a deck at six metres. A range of 6 to 8 metres of working height covers virtually everything on buildings like these, and leaves margin if the sign is taller than the drawing promised. What such a build means in practice is worked out at a tower of eight metres.

Mobile scaffold erected against a front elevation above ground floor level, the height at which sign panels are usually fixed

Choosing too tight bites harder on fixing work than on painting. You have to drive the rotary hammer horizontally into the wall, and that only works if the anchor point falls between chest and eye height. Sitting just above your head, you drill at an angle, the hole wanders and the anchor never pulls up tight afterwards. So hire a build that goes half a metre further rather than one that just fits; dropping a deck costs minutes, a second delivery costs a day.

Hiring a mobile scaffold for a name sign on the pavement

At commercial premises the build stands almost always on public ground: the footway, a loading bay or the edge of a parking space. That means arranging in advance that the spot is clear. Put a cone or a barrier round it that morning, agree with the neighbours that nobody parks there for a few hours, and leave eighty centimetres of passage for pedestrians. In many boroughs a day on the pavement needs a notification or a permit of some sort.

The surface is usually sound but not always flat. Paving sinks at a dropped kerb, there is a gutter along the wall, and sometimes a cellar hatch or a pavement light sits in the footway. You put nothing on a hatch like that. Use levelling plates to take up the difference and check with a spirit level on the deck that the tower really stands square, because a centimetre out at the bottom grows to a hand's width at the top.

Scaffold components during assembly out in the street, the situation you face working on a footway at commercial premises

Watch what sticks out of the wall as well. A canopy, a camera, illuminated lettering or a blind sits exactly at the height the sign is going and holds the tower off. Measure that projection before you order, because you want to bring the panel flat against the brickwork. If a canopy is in the way, shift the tower half a metre sideways and work at longer reach. How high you have to get at a building like this is set out on the page about work at first floor level.

How many hire days a name sign job really needs

The hanging itself takes half a day if everything is right: setting out, marking, eight holes drilled, anchors placed and the panel lifted. Practice stretches that out. Old walls give, anchors spin in soft brick, and on timber cladding you first have to find where the studs run. So allow a full day on the build, plus the time for assembly and dismantling that sits either side of the work itself. Fitting a name sign is one of those jobs where the hire day is mostly setting out.

If the panel is illuminated, it runs to two days. A cable entry has to be drilled, a cable goes through the wall and the electrician needs access too, and he is rarely outside at the same moment as the fitter. Plan those two half days back to back and keep the hire period unbroken, so the tower only travels once. Rates per model and per period are on the page with the rental price list.

Frames, orange braces and castor wheels bundled inside a van, the hire set that arrives on the fixing day you pick.

An extra day in your reservation costs almost nothing here. You settle the whole figure for the opening day alone; from the second day onwards a reduction of ninety five per cent applies to every further day the tower stands at the front of the building. For a fixing job that depends on a delivery that is welcome: if the sign leaves the signmaker a day late, your planning need not fall over. So set the collection date a day after the day you expect to finish sealing.

Which mobile scaffold suits fitting a name sign?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Most chosen
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Levelling a name sign from a 245 cm platform

With a deck of 245 cm you stand at both ends of a two metre sign at once. That is the reason to hire this model and nothing smaller: you can lay the spirit level across the full length without moving in between. If the panel is three or four metres wide you reposition once, and then the trick is to mark out every anchor point first and only start drilling afterwards. Fitting a name sign of that width is really a lining up exercise, not a lifting one.

The lift is the trickiest moment of the day. A three metre panel catches the wind, is unmanageable on your own, and must not be hauled up on a rope while somebody is standing on the build. Set the sign ready on the ground across two trestles, raise it up the outside with two people, and have a third steer from below. Put the tools aside meanwhile, because you need the whole floor. Two people and a hired tower beat any rope and ladder arrangement here.

Assembled mobile scaffold with a deck of well over two metres, the working width a wide sign panel demands

Lining up takes the most time. A sign does not hang level because the anchors are level but because the brackets are, and in practice those two differ by millimetres. So hang the panel loosely in the top points first, step back to the far side of the road and see how it sits against the window line of the building. Only then do you tighten everything for good. You want the mobile scaffold still standing for that check, so do not dismantle the moment the last bolt is turned.

Delivery and assembly when you hire the RS51

The mobile scaffold reaches you as a complete set of parts counted beforehand. Get the reservation in on a working day and stay the right side of 15:00, and the counted set reaches the premises one working day later. While booking you say when it comes and when it goes back. At commercial premises the unloading spot is the thing to sort out first: a van has to be able to stand still at the wall, and the parts must not land in the entrance customers come through.

Putting it together is a job for you and your colleague, because we do not erect anything and never deliver an assembled tower. A manual comes with the set and an assembly video is ready online, and with two people a build of this height goes up in about three quarters of an hour. Do that at the start of the day, before the sign is delivered, so you are not standing with a panel on the pavement waiting for the tower to come upright.

Van with scaffold material at a building, the drop-off you schedule for the morning of the fixing work

Once the sign hangs, you take everything apart again and stack the bundled parts in the agreed place. On the date you chose, the van comes to collect them, so nothing has to be taken anywhere. If the fixing shifts because the signmaker delivers later, let us know through the contact details of the hire desk; the collection day then moves with your new planning and the build simply stays where it is. Fitting a name sign often slips a day, and the hire period absorbs that.

Fitting a name sign safely from a hired mobile scaffold

Two fitters, a rotary hammer and a panel of thirty kilos: that is precisely the moment load capacity matters. Under EN 1004 a class 3 deck is good for 200 kg on every square metre, and two people with a panel between them close on that faster than most work on a wall does. So spread your weight along the length, do not both stand at the same end with the panel between you, and leave heavy tool cases below until you genuinely need them.

Below you the public realm carries on as normal. People walk to the entrance, a courier comes past and a bike leans against the wall. So cone it off, work with a colleague keeping an eye from below, and never leave tools lying on the edge. Set every brake before the first of the two of you climbs. Moving is only allowed once you are both down and the panel is off, even if it is only half a metre along the wall.

Complete inspected scaffold set laid out, the material two fitters use to work at height on a wall

Weather is a real factor in this work. A large sign catches the wind like a sail, and in a decent gust you lose control at the moment you lift it. Stop when it blows hard and move the fixing to a quiet morning. Make sure your colleague watches from below while you press the sign home, and agree who calls the lift. Fitting a name sign in a gale is not worth a hire day. Everything else that applies is gathered under what the rules ask of you up there.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for fitting a name sign

1

Mark all the anchor points on a batten the same size as the sign and hold that batten against the wall first. From the build you then see at once whether holes land in a joint or in a brick.

2

Ask the signmaker to supply the hanging brackets loose. You fix those to the wall first and hang the panel into them afterwards, which is far safer on a narrow tower than doing everything at once.

3

Drill the top row of holes slightly oversize. A millimetre of play gives you exactly enough room to level the sign without having to set a hole again from scratch. Fitting a name sign true is easier than re-drilling.

4

Have the third person stand below with a phone and a photo of the building. From the platform you can never see whether the sign hangs true against the window openings underneath.

5

Book the build for the same day you close off the street. A barrier or a parking bay is usually arranged by the day, and you do not want to apply twice because delivery moved.

6

Take the sealant gun up straight away and finish the top edge of the anchor plates while you are there. Coming back for half a minute of sealing after fitting a name sign means erecting the whole tower again.

Frequently asked questions

Frequently asked questions about fitting a name sign

Which mobile scaffold do you hire for fitting a name sign?+

Take the Altrex RS51, on a base measuring only 75 centimetres. It fits on a footway along a commercial building, leaves room for pedestrians and still goes up high enough to clear the shopfront. Two fitters can stand side by side on the deck of this tower, which a wide panel genuinely needs. If it is a small plate beside the door instead, read the page on a nameplate beside an entrance. Either way you hire a mobile scaffold rather than trusting a ladder with a panel this size.

How does hiring for this differ from hiring for a nameplate?+

A nameplate is small, light and sits at eye level beside the entrance; one person puts that up with two screws. A name sign is a panel metres wide, weighs tens of kilos, hangs on several anchors and has to come level across its whole width. So here you hire a taller build and you work with two people. The tower you hire differs in height, in load capacity and in how many people may stand on it, and you notice that at the booking stage.

How many hire days does fitting a name sign take, roughly?+

For an unlit panel you manage on one hire day, including erecting and dismantling the tower. If lighting goes in or a cable has to pass through the wall it becomes two, because the installer rarely works at the same time as the fitter. Take the days consecutively and the material only has to be brought and collected once. If it overruns, you extend the hire period without having to make a fresh reservation.

What do you pay to hire, and what does a second day save?+

The rental price per tower is fixed, VAT included, and you see it before you book. The opening twenty four hours are paid in full; every day joined onto that counts at a much lower rate, which makes running on far cheaper than placing a second reservation. Delivery and collection form one fixed amount that varies by province. What that means for your building's address you look up at the delivery costs per province.

What working height should you hire for a sign above the entrance?+

Measure to the top edge of the panel and add the height of the sign to it. For a sign hanging just above the shopfront you normally pick a tower giving between 6 and 8 metres of working height, because you want room to drill above it as well. If the building has an unusually tall ground floor, measure that stretch separately and hire a build that goes a step higher. The explanation sits on the page about choosing working height.

Is the hired mobile scaffold delivered to a business address?+

Yes, the van drives to commercial premises like anywhere else and unloads at the wall or at the point you nominate. Make sure there is room to stand still that morning, because a footway full of parked cars costs everyone time. If you would rather fetch the material, fetching it yourself is free of charge by arrangement, from our yard at Zeeburgerpad 89 in Amsterdam. The parts of a tower up to eight metres do make a sizeable load, and you will make two runs.

Does the mobile scaffold arrive built, or do you assemble it on hire?+

No, it arrives in parts and that step stays with you. We deliver the counted set of components and take it away afterwards, but assembly is not part of the rental service and an erected tower never comes out of the van. The build order comes on paper, and online there is a video running through the steps one after another. With two of you, which a sign panel needs anyway, the build stands level on the pavement in three quarters of an hour.

Can you extend the hire if the sign is delivered late?+

Yes, and with fabricated panels that happens regularly. You report a new collection date and the period simply runs on at the low daily amount, which is considerably cheaper than sending the material back and having it come again. Certainly if you have also arranged a parking bay or a closure, it is more practical to leave the tower standing. Finish sooner than expected and the collection date can be brought forward, as long as the van is heading that way.

How much room must be free at the wall for the rental build?+

Allow roughly two metres of depth from the wall: the foot of the tower itself plus the folded out stabilisers. Beyond that you want a strip left over for pedestrians, otherwise the whole footway is blocked. In a shopping street that usually means having a parking bay closed off for the duration of the hire period. Measure that depth before you reserve a tower, because a build whose stabilisers cannot stand free must not be taken to full height.

How do the hire days work out if it blows hard?+

You move the fixing. A panel metres wide behaves like a sail, and in a force six you do not want that above your heads with two people. You shift the work to a calm morning and leave the tower standing at the low daily rate, which is cheaper than closing the hire and ordering it out again. Bear in mind that a street closure is usually arranged by the day, so square that with your new fixing date.

When is the deposit returned after a hire for fixing work?+

A deposit is taken with the booking on top of the hire charge. Once the returned material has been counted through, the deposit goes back to you within 1 working day. Drill dust and a little sealant residue are normal use, so that is not the issue; it is about damaged or missing parts. Do sweep the deck of the tower clean before you bundle, because grit and loose anchors otherwise disappear among the components and then the set will not count out.

Can the same hire period cover the lighting above the sign?+

That is a smart combination, and precisely why you take the period generously. Spots above a name sign, a canopy fitting or a camera sit at comparable height and get mounted from the same build. Do square it with your electrician, because he wants to come on a fixed day. As long as the mobile scaffold stands and the street closure holds, an extra job like that costs you only time and no second delivery.

Hire a mobile scaffold for fitting a name sign today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.