See your price
Application

Painting a low wall? Choose the right scaffold.

A garden wall a metre high gets painted standing on the path. Nothing needs arranging for that. The picture tilts the moment that wall carries on above your head, sits on top of a bank, or dead-ends into the elevation of a shed. Then you are leaning, on soft grass, or with a ditch behind your heels. For those cases you hire the Altrex MiTower, a narrow 75 centimetre tower for one person, built between 4 and 6 metres of working height. Painting a low wall then turns into standing work.

  • Order before 3 pm, delivered tomorrow
  • Professional Altrex scaffolds
  • Up to 14.2 metres working height
  • Easy to assemble yourself
4,2 tot 14,2 mWorking heights available
12Provinces served
7Days a week
200 kg/m²Load class 3
In short
  • For painting a low wall we recommend the 1-person scaffold.
  • A low garden wall gets painted from the ground; only above shoulder height or on sloping land does hiring pay off.
  • Then take the MiTower: 75 cm narrow, assembled single handed and light enough to shift along a boundary wall on your own.
  • A build of 4 to 6 metres working height covers a tall garden wall, a wall on a bank and a gable junction.
  • First 24 hours from €100 incl. VAT and delivery; every day after that 95% off.
Key facts for this job
FeatureValue
Recommended scaffold1-person scaffold (Altrex Mi Tower)
Working height for this job4 to 6 metres
Available working heights4.2 to 14.2 metres
StandardEN 1004, load class 3 (200 kg per m²)
DeliveryOrdered before 3 pm, delivered next working day
Each extra day95% off, from €5 a day
Why a mobile scaffold for painting a low wall?

Safe, stable and professional work at height

The honest order is this: first work out whether you can reach the wall unaided, and only then hire. If a roller gets you to the coping without straining, any build is surplus and a plank on two trestles is quicker. That changes the second you have to stretch, go up on your toes, or reach the bottom courses across a gully. You want two free hands, somewhere to stand a kettle of paint, and to move along every ten minutes. Hiring a tower for painting a low wall is therefore not about height alone, but about posture, ground conditions and whether you can walk past safely.

  • Painting a low wall often works from the ground
  • Needed above shoulder height or on a bank
  • One person, light enough to shift alone
  • A four to six metre build
Read more about working safely →

When to hire a scaffold for painting a low wall

Start with a tape measure before you commit to anything. If the top of your boundary sits at a metre and a half with a level terrace in front of it, you paint the lot standing and a step stool covers the coping. Hiring a tower in that situation is money thrown away, and we would rather say so than have a build stand idle in your garden. It turns the moment the brickwork reaches two metres or more, as on a boundary wall between two plots.

If that is your case, hire the Altrex MiTower. This is a model for one person, 75 centimetres across, that you assemble alone and roll alone, and that counts for a great deal here: alongside a wall you shift a stretch every few minutes. The base also passes through a garden gate and along a path between borders. For painting a low wall along a boundary that is the difference between a smooth day and a slow one. Which build heights exist is set out under hiring a MiTower.

Frames on a pavement outside a brick house, the one person hire set that measures 75 cm across when built.

There is a second reason to look at the rental fleet, even for a low wall: ground that falls away under you. A boundary along a ditch, up on a bank, or at the edge of a sunken drive forces you into a posture where a brush controls nothing. A tower turns that into a flat working floor, and that, rather than the height of the brickwork, is the reason to hire a mobile scaffold when painting a low wall.

What working height to hire where a wall meets a building

The highest point is not the wall itself but the place where your paint stops. If the boundary runs dead into the side elevation of a shed or an extension, you usually take the adjoining stretch of render up as far as the eaves. That puts you at four to five metres soon enough. Measure from the ground you will actually be standing on, not from the terrace that happens to sit half a metre higher, or you will buy a build that falls just short.

That measured figure then gets translated into a build. Whatever height your platform is pinned at, add about 2 metres for your arms and the roller, and that sum is your working height. A wall that finishes at four metres therefore does not need a deck at four metres, which saves on the rental price and on the carrying. A range of 4 to 6 metres covers almost every wall that meets a building; the page on a tower reaching six metres shows how that works out.

Scaffold built up against the side elevation of a house, the situation where a garden wall runs into taller brickwork

Hire a build that falls short and something unpleasant happens to the quality of your work. The top band gets rolled at full stretch, the roller runs dry, and a line is left that you will always see from the garden. With masonry paint on brickwork that is awkward to put right, because a second coat over a half dried first coat will patch. Measuring first and choosing the build afterwards saves that correction entirely. It also stops you hiring more working height than the wall ever asked for.

Where the hired tower stands alongside a garden wall

Ground in a garden is rarely as flat as it looks. Grass sinks under castors, paving slabs sit loose in sand, and along a border the soil falls away towards the planting. So put a slab or a thick sheet of ply under every castor, spreading the load so the build is not out of true within the hour. Check it is level again after you have repositioned once, because on soft ground more moves than you expect.

Beside water the requirements on the spot are stricter. With brickwork on a ditch bank, keep at least half a metre between the foot of the tower and the edge, because that ground is often undercut and can crumble under load. If that distance is impossible, lay boards or trench sheets and carry the weight back onto firm soil behind. On top of a bank the same principle applies: you stand on the level part and work sideways towards the slope rather than on it.

Scaffold parts spread out across a lawn, the sort of soft footing a garden gives you to build on

Right round the base you must leave room for the stabilisers, and that is exactly what a heavily planted garden does not offer. A border full of perennials, a fence a metre away or a dense hedge will foul the legs. Prune something back or move pots aside before you begin, because halfway through assembly you do not want to be shunting half a tower. Ground that will not sit flat is dealt with in the article on standing a tower where the surface is uneven.

How many days to hire a MiTower for the wall

Painting a low wall is more waiting than working. First you brush the moss and the loose sand off and rinse down, and that has to dry for a day before paint may go on. Then a primer follows and one or two finishing coats, with drying time again between each. The rolling and cutting in themselves take only a few hours per coat, so the calendar decides how many hire days you need here, not the pace you keep up.

Most people do not need the build for that whole period. The low part of the boundary you do from the ground anyway, and the tower only comes into play on the tall stretch or at the junction with the building. So reserve it for the days those bands are due, which is often two and sometimes three. Painting a low wall rarely fills a whole hire week. What each model costs per period is gathered on the tariff page of the rental service.

A set of scaffold parts on the pavement outside a house, the material you book for your planned painting days

Running on is cheaply arranged for outdoor work. Only the opening twenty four hours goes on at the whole tariff, and from the second day a ninety five per cent reduction runs on every further day the tower stays in your garden. For painting in spring or autumn that helps a lot, because one wet morning shunts half a day and you need that slack. Set the collection date wide and simply tell us if the last coat goes on sooner.

Which mobile scaffold suits painting a low wall?

Kamersteiger RS44
  • Working height up to 4 metres
  • Compact and narrow
  • Great for indoor and small jobs
View and calculate →
Smalle rolsteiger RS51
  • Working height up to 14.2 metres
  • Narrow (75 cm)
  • Ideal for narrow passages
View and calculate →
Brede rolsteiger RS52
  • Working height up to 14.2 metres
  • Wide platform (135 cm)
  • Extra stability and workspace
View and calculate →
Most chosen
1-persoons steiger MiTower
  • Working height up to 6.2 metres
  • Very compact
  • Quick and easy to assemble
View and calculate →

Painting a low wall from the 245 cm platform

With a platform of 245 cm you finish a good two metres of wall per position, so on a ten metre boundary you reposition four or five times. That shifting is no obstacle on this job, because masonry paint on brickwork has no wet edge to keep up with the way render does. You can climb down in your own time, move a stretch along, lock the castors again and carry on without seeing that break later in the finish.

Take up per position what you will use in those two metres: a kettle with a roller, a brush for the joints and the coping, and a cloth. Stand the tin below by the climbing frame rather than on the deck, because every kilo you carry up adds to your own weight on a build rated for one person. If the wall has to be painted on both sides, do the full length of one face first and only then turn to the other.

Mobile scaffold erected along a front elevation with the platform at height, the same length you cover per position

What catches people out is the bottom. From the tower you see the top edge and the coping perfectly well, but the last thirty centimetres above ground level never come within reach, and that is where most of the green growth sits. Plan that strip as a separate round from the ground, on a kneeler, either before the tower arrives or after it has gone. Otherwise a grey band stays there and gives the rest away. Painting a low wall is judged from the garden path, and that band is the first thing anyone sees.

Hiring a MiTower with delivery to the garden gate

The material reaches you as a complete set of numbered parts. Booking on a working day means a 15:00 deadline, and beating it puts the bundled parts beside your gate on the working day after that. During that booking you fill in the arrival date and the return date yourself. One thing matters for garden work: the driver sets the parts down at the drive or on the pavement and does not come into your back garden. So sort out beforehand how they get through the gate.

Assembly belongs to the job you are doing, because we erect nothing and no assembled tower ever rolls out of the van. A manual comes with the package and there is an instruction video online running through the order. Since this is a model for one user, you manage without help. Do it on the flat part of the garden and only then roll the build across to the wall; that works better than building between borders with a fence at your back.

Delivery van holding scaffold parts parked at the kerb, as far as your hired tower for the garden is brought

Once the last coat is dry you take the parts apart again and stack them where the van left them. On the return date you chose, the van comes back for everything, so no driving and no trailer on your side. If the painting is put off by a wet week, pass that on through the contact page for your booking so the collection day moves with you and you are not left with half a job. Painting a low wall outdoors depends on the sky, and the hire runs with it.

Working safely above a ditch on a hired tower

This is a build for one person and that limit is not decoration. A class 3 deck under EN 1004 is rated at 200 kilos for each square metre, which one painter and a paint kettle never come close to. On this model the binding factor is stability instead: it is meant to carry a decorator with his paint, not two people holding a long batten between them. If you want to paint in pairs, let the other do the low part from the ground and swap over.

In an open back garden wind is the most underrated risk. A gust drawing between the fence and the shed pushes harder than you expect at the moment you are rolling with an arm out. Stop when it blows hard and leave no sheeting or dust cover hanging on the tubes, because that catches the wind like a sail. Lock the brakes on all castors before you climb, and never move the tower with somebody on it or a kettle balanced up top.

Hired scaffold material dropped off outside a home, the set that puts a firm floor under you outdoors

Working above water or along a steep bank, think mainly about the landing. Miss your step there and a fall into the nettles or the ditch is a different matter from one onto a terrace. Keep your phone in your pocket, do not work alone when it genuinely is over water, and keep the extension lead or the hose off your walking line. Tell someone indoors that you are out by the water. A hired tower does not make a ditch bank safe on its own. The ground rules sit under safe work at height.

In 5 steps

How hiring a mobile scaffold works

1
Choose working height

Pick the height that suits your job.

2
Book online

Sorted in 60 seconds, price shown instantly.

3
We deliver

At the agreed spot the next working day.

4
Assemble safely

Assembled by you, with a manual.

5
We collect

One call and we collect the scaffold.

Good to know

Practical tips for painting a low wall

1

Wash the wall down two days before delivery. Green growth needs time to dry out, and you do not want to start on damp masonry on the first day the build is standing. Wet brickwork wastes a hire day.

2

Put four paving slabs ready where the castors will land, even if the grass looks firm. After a shower a castor sinks within the hour and your build no longer stands level, which ruins your line along the coping.

3

Paint the head of the wall, the coping stones on top, first thing from the build. That is the spot you cannot reach again later without rolling the whole tower back along the wall.

4

Lay a plank between the borders as a walkway to the tower. You will go back and forth dozens of times with paint and tools, and without a path the planting is flattened in two days.

5

Cut the lowest branch off an overhanging tree before you assemble. Leaves resting against the brickwork leave streaks in wet paint and keep the wall damp for days on end. Painting a low wall under branches is asking for trouble.

6

Always add a spare day to your hire period for autumn work. Masonry still wet with dew in the morning can only be painted around midday, and that shifts your whole plan, collection date included.

Frequently asked questions

Frequently asked questions about painting a low wall

Do you really need to hire a scaffold for painting a low wall?+

Often not, and we would rather say so at once. If the top edge stays under shoulder height and you are standing on a level path, you paint it all upright and hiring anything is unnecessary. The answer changes with a boundary wall of two metres or more, with brickwork that runs into a building, and in a garden where the ground falls away to a ditch. In those cases a tower gives you a flat floor and two free hands, and you see that in the finish.

Which tower should you hire for a wall above shoulder height?+

The Altrex MiTower is the obvious candidate: a narrow build of 75 centimetres reckoned on one person and light enough to move along the wall on your own. You have no use for a wide deck here, because little material goes up with you; what you want above all is a base that comes through the garden gate. If you would rather see the options side by side, look at the overview of mobile scaffolds in the rental fleet.

How many hire days does a tall garden wall actually take?+

Reckon on two to three hire days for the tall part of the wall. Cleaning, drying, priming and two finishing coats spread over most of a week, but you only need the tower on the days paint goes on the upper stretch. Put those days together and the material only has to come once. The low part you do in between from the ground, at a moment when the tower is either not yet or no longer in the garden.

What does the hire cost, and what if the painting overruns?+

Every model in the rental fleet carries a fixed rate including VAT that you see on the site beforehand. The first period of twenty four hours is paid in full; each consecutive day is added at a heavily reduced amount. For outdoor work that lands well, because a band of rain can easily cost you two days on which nothing happens. Carriage out and back sits in one fixed rate per province, which you look up on the page with delivery costs by region.

What working height should you hire for a wall along a bank?+

Measure from the point where the tower will stand and not from the top of the slope. Standing at the bottom, the difference in level simply counts, so a two metre wall still puts you on a four metre build. A range of 4 to 6 metres of working height is ample for gardens of this kind. If you are unsure how to measure on falling ground, work through the explanation of working height before you fix a build.

Can the tower you hire be delivered to the back of the garden?+

The driver unloads at the drive, the pavement or the first gate and does not drive into the garden. You carry the parts through yourself, which is manageable with this light tower model, certainly with someone guiding. If you want to avoid that altogether, collecting the parts yourself at Zeeburgerpad 89 in Amsterdam costs nothing at all, provided you ring ahead and agree a slot. Do check first that the garden gate is wide enough for the longest component.

Is the tower delivered assembled, or is that your job when hiring?+

Building it is your part. We deliver the complete, counted set and come back for it afterwards, but no fitter steps out of the van and assembled delivery is not part of the rental service. The assembly instruction comes on paper, and the video shows precisely in what order the parts go together. Because the MiTower is designed around one person, on a flat piece of grass you are ready to start within a quarter of an hour.

Can you keep the hire running if it is too windy to paint?+

Yes. You pass on a new collection date and the period carries on at the low daily amount. With a wall in an open garden that is no abstraction: in a stiff breeze the spray drifts off and you are balancing uncomfortably on a narrow build. Shifting a day is wiser than pushing on. If you want to be rid of the tower sooner instead, the collection day may also be brought forward, as far as the van planning allows.

How much room does the hired build need beside the wall?+

Keep roughly a metre and a half free along the wall, plus another half metre at the front for the folded out stabilisers. In a narrow back garden that width is the real pinch point, not the height of the wall. If a fence runs parallel a metre away, the build simply will not fit between them and you end up at the top edge with a ladder after all. Measure that gap before you fix a date in the rental diary.

Does a wet week waste the days you booked in the rental diary?+

Masonry paint wants a dry surface, so a wet week brings your plan to a halt. Choose a delivery date you can still move if need be and keep an eye on the outlook. If it turns out unworkable, shift the period or leave the tower standing at the reduced daily rate. What you must not do is carry on painting damp brickwork, because the coat lets go within a season and the tower stands there a second time for nothing.

How does the deposit work on a rental if paint gets on the parts?+

The deposit sits alongside the hire amount and returns to your account inside 1 working day, once the count on the returned bundle has been ticked off. A few splashes of masonry paint belong to normal use of a tower; it is about damaged or missing components. Wipe the tubes and the deck down with a wet cloth at the end of your last painting day, while the paint is still soft. Then it goes back clean and the paperwork is done.

Can you hire the same tower for the fence next to it?+

You certainly can, and it is worth stretching the hire period from the outset. A timber fence or a gate beside the wall gets stained from the same build, only you set it up on the other side and reposition more often, since a fence usually runs further. Bear in mind that stain and masonry paint have different drying times, so do not plan those two jobs for the same afternoon but spread them over your hire days.

Hire a mobile scaffold for painting a low wall today?

Calculate your rental price now or ask for free advice.

Rolsteiger van SteigerTaxi geleverd op locatie
Book it online

Your scaffold sorted in 2 minutes.

Choose your scaffold and working height, see the price instantly and book online.